| 1 | Providing temporary scaffolding by using either aluminium modules or galvanized iron plank platforms secured to horizontal member pipes. Any scaffolding such prepared must conform to IS-3696-1966 and shall be subjected to check by HWP (K) safety group, before declaring it as fit for use. Such scaffolding shall be removed by the contractor after completion of maintenance work. |
| 2 | Providing GI plank platform type Scaffolding up to an elevation of 3 m) from ground. |
| 3 | Providing GI plank platform type Scaffolding at an elevation above 3 m from ground. |
| 4 | Providing Aluminium modules type Scaffolding. |
| 5 | Supply of scaffolding material for Aluminium modules type Scaffolding. |
| 6 | Scaffolding tower of dimensions, MOC Aluminium Grade 6082 T6(14.2m Height, length 1.45m and width 1.8m) |
| 7 | Scaffolding tower of dimensions, MOC Aluminium Grade 6082 T6 (9.5m Height, length 0.85m and width 1.8m) |
| 8 | Assisting in carrying out material handling jobs involved in maintenance jobs. |
| 9 | Assisting in carrying out Preventive maintenance of mobile cranes, EOT cranes, Fork Lifts, Departmental vehicles. |
| 10 | Assisting in carrying out in-house general/regular repairs jobs in Garage section. |
| 11 | Cleaning of Cranes, Buses, Tata Truck, Fork Lift, Fire Tender, Tata Sumo, Departmental Vehicles through pressurised water jet at garrage Section of HWPK by application of appropriate cleaning detergent, liquid solution. |
| 12 | Assisting to CISF personnels in scanning of tifin boxes during lunch and dinner time at CISF main Gate by unloading and loading of lunch/dinner boxes from Buses. |
| 13 | Maint. and testing of Chain Pulley Blocks: Handling, cleaning, dismantling, applying rust preventive chemical / greasing of all internals of chain pulley blocks, replacement of brake liner/pad wherever required, assembling and finally load testing including DP test of Hooks by using 1.25 times the rated load. The load test shall be carried out in presence of HWPK representative and shall be authorized by AERB representative. |
| 14 | Capacity: 0.5 MT |
| 15 | Capacity: 1 MT |
| 16 | Capacity: 2 MT/ 3 MT |
| 17 | Capacity: 5 MT |
| 18 | Capacity: 7.5 MT/ 8 MT/10 MT |
| 19 | Maint. and testing of Fork Lifts: General cleaning of the forklift, re-lubrication & oil topping up operation shall be done and made ready for testing by contractor's personnel. Load shall be lifted by the forks and forward / backward movement, hoisting / lowering movement, gradient (1:30) movement, braking movement etc. shall be checked with 125% of SWL. Capacity: 3MT |
| 20 | Maint. and testing of EOT Cranes: General Cleaning of the EOT crane body, cow-web removal, re-lubrication at required points, oil topping up operation etc. Brake lining check & adjustment and similar other pre-testing jobs shall be carried out including DP test of Hooks by the contractor before load testing is taken up. The load test shall be carried out in presence of HWPK representative and shall be authorized by AERB representative. Wire ropes on the rope drum and on pulley hook shall be cleaned and cardium compound or Servocoat-120 grease provided by HWPK as free issue material shall be applied after inspecting the condition of wire rope Long travel, cross travel of the crane, inching operation, brake operation, limit switch operation, crane girder deflection with load at centre, amperage, noise of operation, stability etc. shall be checked. |
| 21 | EOT Crane R Plant, Capacity: 15 MT |
| 22 | EOT Crane R & M Shop & Central Stores DPS, Capacity: 25 MT |
| 23 | JIB Crane, Capacity: 1 MT |
| 24 | EOT Crane HEWAC, Capacity: 5 MT and 15 MT |
| 25 | EOT Crane TG Building, Capacity: 10 MT |
| 26 | Maint. and testing of Mobile Cranes: Mobile Crane Jobs as specified for (3) above are also required to be done for mobile cranes. Crane shall be tested with basic boom or extended boom as per instruction of engineer in charge including DP test of Hooks. Crane shall be parked with outrigger beams fully taken out and supported on rigid base. Boom hoisting, round movement, rope hoisting, braking, inching operation, swinging with load test etc. shall be done with test load. |
| 27 | TIL RT 880, Capacity: 75 MT |
| 28 | ACE HYDRA 14W Crane, Capacity: 14 MT |
| 29 | Painting of Equipements: Preparation of surfaces, providing and applying one coat of suitable primer wherever required, (as recommended by manufacturer of finished coat paint) and two coats approved make and shade of Synthetic Enamel Paint (as per colour code of HWPK) including writing equipment Number, capacity, load tested date etc. on equipment/machines after manually and/or mechanical cleaning of entire surface and removing oil, grease, rust, dust, loose mill scale or existing primer. |
| 30 | Inspection and testing of Wire Slings or Polyester Slings: Collection, cleaning, visual inspection of Slings for any physical damage such as flattening or distortion, jammed strand, un-laying, bird cage bulge, kinks and crushed in line with HWPK procedures and load testing. |
| 31 | Capacity: Upto 5 MT |
| 32 | Capacity: Above 5 MT up to 10 MT |
| 33 | Capacity: Above 10 MT up to 25 MT |
| 34 | Inspection and testing of D Shackles: Collection, cleaning, visual inspection D Shackles for any physical damage such as pining, nicks & gouges, cracks or corrosion, excessive thread damage, any heat work or welding, pins must be straight and all screw pins must be completely seated. Cotter pins must be used with all round pin, if existing in shackles, recording of all data inclusive of dimension of Mouth opening (distance between eyes) in line with HWPK procedures. All the shackles have to be DP tested, load tested and witness by AERB authorized person. |
| 35 | Capacity: Upto 5 MT |
| 36 | Capacity: 10 MT up to 15 MT |
| 37 | Capacity: Above 15 MT up to 20 MT |
| 38 | Providing Truck or Trailer for shifting Dead Weight of up to 25 MT in Plant premises for carrying out load testing of EOT Cranes. Capacity: up to 25 MT. Please Enable Macros to View BoQ information |