Road Transport and Highways Government Departments Closing in 0 days TDR #56183918

Tender For Construction Of Bailey Bridge Over Hipu River At Ikiye Village Under Setu Bandhan Of Crif Scheme.

Issued by Government Departments · Zunheboto, Nagaland
Tender Value
2.96 Crore
Estimated cost
Bid Submission
10 Aug 2026
0 days left
EMD
2.96 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Zunheboto → Nagaland
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Bailey Bridge Over Hipu River At Ikiye Village Under Setu Bandhan Of Crif Scheme.

BOQ

Name of Work:- Construction of Bailey Bridge over Hipu river at Ikiye village under Setu Bandhan of CRIF Scheme.
Sl. No. Item Description
1Foundation
2Excavation for structure: Earth in excavation of foundation for structure as per the drawing & technical specifications including setting out, construction of shoring and dressing, removal of stamps and deletrious matter, dressing of sides and bottom and back filling with approved material. B(ii) depth upto 3m
3Random Rubble Masonry: Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per drawing and specifications. (Soling)
4PCC 1:3:6 in Foundation: Plain Cement Concrete 1:3:6 nominal mixed in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.
5RCC Grade M30 using batching plant and manual placing: Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification.
6Supply, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing & Technical specifications.
7Sub-structure
8PCC 1:3:6 in Foundation: Plain Cement Concrete 1:3:6 nominal mixed in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curring for 14 days.
9RCC Grade M30: Plain/Reinforced cement concrete in substructure complete as per drawing & technical specification. RCC M30 grade using batching plant transit mixer and concrete pump height upto 5m to 10m.
10Supply, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing & specifications.
11Providing weep holes in brick masonry / plain / reinforced concrete abutment wing wall/ return wall with 100mm dia AC pipe. Extending through the full width of the structure withslope of 1V:20H towards drawing force. Complete as per drawing and technical specification.
12Back filling behind Abutment, wing wall and return wall complete as per drawing and technical specification: A - Granular material.
13Providing & laying of filter media with granular materials/stone crushed aggregates. Satisfying the requirements laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wingwall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
14Superstructure
15Furnishing and placing Reinforced cement concrete in superstructure as per drawing and technical specification. Height 5m to 10m: RCC M30 Grade.
16Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing & Technical specifications.
17Formwork
18Centering and Shuttering including strutting, Propping etc. and removal of form using steel sections: Columns, pillars, piers, abutments, posts & struts.
19Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de-shuttering and decentering at all levels, over a height of 3.5m, for every additional height of 1 metre or part thereof (Plan area to be measured).
20River Training & Protection Works
21Providing and laying flooring complete as per drawing and Technical specification laid over cement concrete bedding. A- Rubble stone laid in cement mortar 1:3.
22Road works
23Granular Sub-base with graded material: (Construction of granular sub-base by providing granular material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory power roller to achieve the desired density, complete as per clause 401)
24Water Bound Macadam: (Providing, laying and spreading and compacting graded stone aggregate to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of course aggregate, watering and compacting to required density.
25Grading - II, Using screening Type-A (13.2mm agg.)
26Grading - III, Using screening Type-B (11.2mm agg.)
27Prime Coat: providing and applying primer coat with cutback MC 30 bitumen emulsion on prepared surface of granular base including clearing of roads surface and spraying primer at the rate of 0.60kg/sqm using mechanical means.
28Tack Coat: Providing and applying tack coat with bitumen emulsion using pressure distributor @ 0.25kg per sqm on prepared bituminous surface cleaned with mechanical broom.
29Open Graded Premix Surfacing: (Providing, laying and rolling of open-graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates using viscocity grade bitumin to to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capacity not less than 200 tonnes/hour laying and rolling with a smooth wheeled roller finished to required level and grades.
30Seal Coat: (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type A
31Surface Drains in Ordinary Rock: (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions to the requirement of clause 301 to 309. Excavated material to be used in embankment within a lead of 1000m), by Mechanical means.
32Cross Drainage (HP Culverts)
33Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides) I. Mechanical Means - Soil (upto 3 m depth)
34PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
35Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications- Coursed rubble masonry (first sort)
36PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) (Bedding for pipe)
37Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry (1st sort) in Parapet
38Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row. (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row)
39Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
40Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides) (Catch Pit)
41PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
42Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
43Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides) (Guide wall)
44Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications
45Protection Works.
463.00 metre height CRSM Retaining Wall
47Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extend required and utilising the remaining earth locally for the road work complete as per MOST specification 304. Depth upto 3m ordinary Soil - Mechanicall means
48Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.
49PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 mixed with crushed stone aggregate 40 mm nominal size mechanical mixed, placed in foundation and compacted by vibration including curing for 14 days.
50Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications (MOST 1400 & 2200) Coarsed Rubble masonry.
51Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specification complete as per MOST specification 710.1.4 of IRC:78 & 2200 Granular Material.
52Providing weep holes in brick masonry / plain / reinforced concrete abutment wing wall/ returnwall with 10mm dia AC pipe. Extending through the full width of the structure with slope of 1V:2H towards drawing force. Complete as per MOST specificetion 27006 & 2200.
53Protection Works.
542.0 m Height Breast Wall
55Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extend required and utilising the remaining earth locally for the road work complete as per MOST specification 304. Depth upto 3m ordinary Soil - Mechanical means
56Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.
57PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 mixed with crushed stone aggregate 40 mm nominal size mechanical mixed, placed in foundation and compacted by vibration including curing for 14 days.
58Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications (MOST 1400 & 2200) Coarsed Rubble masonry.
59Providing weep holes in brick masonry / plain / reinforced concrete abutment wing wall/ returnwall with 10mm dia AC pipe. Extending through the full width of the structure with slope of 1V:2H towards drawing force. Complete as per MOST specificetion 27006 & 2200.
60Supply of Extra Width DS Bailey Bridge from approved manufacturer, including carraige and Erection by Launching/Staging method in all respect complete as per specifications and direction of the Engineer. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56183918
AUTHORITY Government Departments
TENDER VALUE 2.96 Crore
LAST DATE 10-08-2026
Authority
Authority Name Ministry Of Road Transport And Highways
Work Description Tender for Construction Of Bailey Bridge Over Hipu River At Ikiye Village Under Setu Bandhan Of Crif Scheme.
Basic Detail
Tender No CE(RnB)/SETU/HIPU/2025-26/08
Bidding Type Tender
Location
City Zunheboto
State Nagaland
Key Dates
Publish Date 26 Jun 2026
Submission Date 10 Aug 2026
Open Date 11 Aug 2026
Finance
Tender Value 2.96 Crore
Tender Fee 10000
EMD 2.96 Lakhs
Exemption Not Available
Document List
BOQ_961474.xls
cd05ebd3-c946-42c6-a4b2-9107f86cec4e.html
DesignDrawings.rar
HipuSBD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Aug 11, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_961474.xls

html

cd05ebd3-c946-42c6-a4b2-9107f86cec4e.html

rar

DesignDrawings.rar

pdf

HipuSBD.pdf

pdf

Tendernotice_1.pdf