|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | 1) Roof Top Rain Water llarvesting AT- Kanher (All ZP School), Tal-Malshiras Providing and fixing P.V.V Rain water pipe of 110 mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to LS 13592-1992 including proper rain water receving recess with P.V.C Plug, bend, necessary fittings, such as, offiets, shoes, including fixing the pipe on wall using approved wooden cleats projecting 25 mm to 40 mm from face of wall a fixing with clips of 3 approved quality and number, filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necesaary scaffolding and maintenance for 3 yrs for any leakages or dislocation of pipes. All the P.V.C fittings and additional 2 place socket clips shall be got approved from engineer in charge etc. complete. (The contractor shall give 3 yrs guarantee bond for payment) |
| 3 | Providing, soak pit of size 120cm x 120cm x 120cm including exavating and filling with brick-bats. |
| 4 | GST18% |
| 5 | 2) Providing Water supply Pipeline At Kanher( All Z.P.School & Anganwadi Taluka:- Mashiras. Excavation for foundation/pipe trenches in earth, soils, of all types sand, gravel, and soft marum, including removing the excavated material up to a distance of 50 m and lifl as below stacking and spreading, as directed normal dewatering, preparing the bed for foundation and Excluding back filling etc. complete (M.JP D.S.R. 2023-24 liem No.1 Page No 37) |
| 6 | Excavation for foundation/pipe trenches in Hand Muram including removing the excavated material up to a distance of 50 m and lifts as below stacking and spreading as directed by Engineer-in-Charge, normal dewatering preparing the bed for foundation and excluding back filling, etc complete. (M.JP D.S.R. 2023-24 Item No.2 Page No 37) |
| 7 | Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below Stacking as directed by Engineer-In-Charge normal dewatering, preparing the bed for foundation and excluding back filling, etc. Complete (M.JP D.S.R. 2023-24 Item No.5Page No 37) |
| 8 | Murum from Excavated Stuff |
| 9 | 63 mm Dia.4 Kg/cm2. |
| 10 | 63 mm Dia.4 Kg/cm2. |
| 11 | Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation surcharging etc.complete (MJP D.S.R. 2023-24 Item No.15 Page No 40) |
| 12 | GST18% |
| 13 | 3)Repairing GSR At-Kanher (Smashanbhumi), Tal-Malshiras Providing and laying in situ Cement concrete of trap/granite/quartzite/gaciss metal for RCC work as per detailed drawings and designs or as directed by Engineer in charge including normal dewasering form work, compaction, finishing and curing, etc. complete (lly weight batching and mix design for M-250 and M-300 only. Use of L & T, ACC, Ambuja, Bata Gold, Manikgad, Majashree etc cement is permitted excluding M.S. or Tor reinforcement) |
| 14 | Providing internal censeni plaster 12 mmi thick in a single cout using Ready to use wall plaster to concrete 354 er brick surface in all position sine luding scaffolding and curing complete. Providing groove at joint of B11 Masonry and concrete members complete a) cemeni ratio 1:5 With Prior Approval of Concerned SE (PWD SSR 2022-23) PAGE NO 483 SK. NO 1943 |
| 15 | Providing rough cast cement plaster externally in two costs with coloured cement finish to 19.11 concrete/brick/stone masonry surfaces in all posations with base coat 121015mm thick in CM. 1:4 using gray cement and rough cast treatment 12 mm thick in proportion of 1:11/23 using colour pigment (PWD SSR 2022-23) PAGE NO 257 SR NO 970 |
| 16 | Providing and applying Single coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary, cleaning and preparing the surface, PWD SSR 2022-23) PAGE NO 276 SR. NO 1090 |
| 17 | Providing and fixing? Smun dia. Screw down bib/stop tap of brass including necessary socket union nut 671.00 Sqm |
| 18 | Providing, hoisting and fixing in position CI, manohole, frame and cover of best quality and of required stre and shape with locking arrangements including applying 2 coats of anti-corrosive paint, ete complete |
| 19 | GST18% |
| 20 | 4) Repairing GSR At-Kanher (Anu-Jati & Nashoudh Wasti), Tal-Malshiras Providing and laying in situ Cement Concrete M-1 of und bedding inchading hailing water, form (MIP SSK 2023-24) PAGE NO 47 ITEM NO 14 |
| 21 | Providing and casting in situ CC. of trap/granite/quartzite/ guess thetal of approved quality for C works as per detailed drawings and designs or as directed by Engineer-in-charge lesteding normal dewatering, centering, form work, compaction, finishing the formed surfaces with CM 13 of sufficient 1.7933 minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish is to be provided and curing, etc. complete. (Dy weigh batching and mix design for M-250 and M-100 imly Use of L&T, AC.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cernent is permitted) (Exchading MS or Tor reinforcement) |
| 22 | Providing internal cement plaster 12 mm thick in a single coat using Ready to use wall plaster to conorste 16.96 or brick surface in all position sinc luding scaffolding and curing complete. Providing groove at joint of B.B. Masonry and concrete members complete. a) cement ratio 1.5 With Prior Approval of Concerned SE (PWD SSR 2022-23) PAGE NO 483 SR. NO 1943 Rate as per Rate Analysis |
| 23 | Providing rough cast cement plaster externally in two coats with coloured cement finish to 28.83 concrete/brick/stone masonry surfaces in all positions with base coat 12to15mm thick in C.M.1:4 using gray cement and rough cast treatment 12 mm thick in proportion of 1:11/2:3 using colour pigment (PWD SSR 2022-23) PAGE NO 257 SR. NO 970 Rate as per Rate Analysis |
| 24 | Providing and applying Single coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary, cleaning and preparing the surface |
| 25 | Providing and fixing15mm dia. Screw down bib/stop tap of brass including necessary socket union nur complete (PWD SSR 2022-23) PAGE NO 337 SR. NO 1339 |
| 26 | Providing, hoisting and fixing in position C1, manohole, frame and cover of best quality and of required size and shape with locking arrangements including applying 2 coats of anti-corrosive paint, etc. complete MJP DSR 2023-24 Item No. 4 Pare No 280 |
| 27 | GST18% |
| 28 | 5) Constructing Hand Wash Station At Kanherj Bhanware Wasti Z.P. School & Anganwadi Taluka:- Mabhiras. Excavation for Foundation/pipe trenches in eandi, soils, of all types sand, gravel, and soft murum, including removing the excavated material up to a distance of 50 m and fill as below stacking and spreading as directed normal dewatering, preparing the bed for foundation and Excluding back filling etc.complete (MIP D.S.. 2023-24 Item No.1 Page No 371 |
| 29 | Excavation for foundation/pipe trenches in Hard Marum including removing the excavated material up to a distance of 50 m and lifts as below stacking and spreading as directed by Engineer-In-Charge, normal dewatering preparing the bed for foundation and excluding back filling, etc.complete (MJP D.S.R. 2023-24 Item No.2 Page No 37) |
| 30 | 90 mm Dia.4 Kg/cm² |
| 31 | 90 mm Dia.4 Kg/cm2. |
| 32 | Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation surcharging etc.complete (M.JP D.S.R. 2023-24 Item No.15 Page No 40) |
| 33 | C15 mm Upve Pipe |
| 34 | 25 mm Upve Pipe |
| 35 | Providing and fixing 20 mm dia screw down bib/stop tap of brass including necessory socket union nut-etc. Complete (PWD DSR 2021-22, Page No 250, It No 41.41) |
| 36 | Providing second class Burnt Brick masonry with conventional/LS type bricks in cement mortar1:6 in foundations and plinth of inner walls/in plinth external walls including bailing out water manually,striking joints on unexposed faces, raking out joints on exposed faces and watering etc. Complete (PWD SSR 2022-23) PAGE NO 242 SR. NO 894 |
| 37 | Providing rough cast cement plaster externally in two coats with coloured cement finish to concrete/brick/stone masonry surfaces in all positions with base coat 12to15mm. thick in C.M.1:4 using gray cement and rough cast treatment 12 mm thick in proportion of 1:11/2:3 using colour pigment including scaffolding and fourteen days curing ete. complete. (PWD SSR 2022-23) PAGE NO 257 SR. NO 970 |
| 38 | Providing and fixing green marble of 18to20 mm thick for door frame/dado/window box in gete .On C.M. 1:6 including filling joints with polymerbase fille rnosing/moulding the sharp edges wherever necessary, curing, etc. complete. (PWD SSR 2022-23) PAGE NO 268 SR. NO 1040 |
| 39 | Providing, soak pit of size 120cm x 120cm x 120cm including exavating and filling with brick-bats. |
| 40 | GST18% |
| 41 | 6) Constructing Hand Wash Station At Kanher Anganwadi & ZP School Sargarwadi, Taluka:Malshiras. Excavation for foundation/pipe trenches in earth, soils, of all types sand, gravel, and soft murum, including removing the excavated material up to a distance of 50 m and lift as below stacking and spreading, as directed normal dewatering, preparing the bed for foundation and Excluding back filling etc.complete (MJP D.S.R. 2023-24 Item No.1 Page No 37) |
| 42 | Excavation for foundation/pipe trenches in Hard Murum including removing the excavated material up to a distance of 50 m and lifts as below, stacking and spreading as directed by Engineer-In-Charge, normal dewatering preparing the bed for foundation and excluding back filling, ete.complete (MJP D.S.R. 2023-24 Item No.2 Page No 37) |
| 43 | 90 mm Dia.4 Kg/cm² |
| 44 | 90 mm Dia.4 Kg/cm² |
| 45 | Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation surcharging ctc.complete (M.JP D.S.R. 2023-24 Item No.15 Page No 40) |
| 46 | 25 mun Upve Pipe |
| 47 | Providing and fixing 20 mum dia screw down bib/stop tap of brass including necessory socket union nut-ete. Complete (PVD DSR 2021-22, l'age No 250, It No 41.41) |
| 48 | Providing second class Burnt Brick masonry with conventional/M.S type bricks in cement mortar1:6 in foundations and plinth of inner walls/in plinth external walls including bailing out water manually, striking joints o unexposed faces, raking out joints on exposed faces and watering etc. Complete (PWD SSR 2022-23) PAGE NO 242 SR. NO 894 |
| 49 | Providing rough cast cement plaster externally in two coats with coloured cement finish to concrete/brick/stone masonry surfaces in all positions with base coat 12to15mm. thick in C.M.1:4 using gray cement and rough cast treatment 12 mm thick in proportion of 1:11/2:3 using colour pigment including scaffolding and fourteen days curing etc. complete. (PWD SSR 2022-23) PAGE NO 257 SR. NO 970 |
| 50 | Providing and fixing green marble of 18to20 mm thick for door frame/dado/window box in getc. On C.M.1:6 including filling joints with polymerbase fille mosing/moulding the sharp edges wherever necessary, curing, etc. complete. (PWD SSR 2022-23) PAGE NO 268 SR. NO 1040 |
| 51 | GST18% |
| 52 | 7) Constructing Of Solid Waste Management (Kachara Kundi), AT- Kanher, Tal-Malshiras, Dist-Solapur Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter sultable foreither collar joints or rubber ring joints, excluding GST lev-led by GOT & GOM in all respect including Inspec tion charges, transport to departmental stores, unloading and stacking etc. complete |
| 53 | GST18% |
| 54 | 8) Providing Water supply Pipeline At Kanher(Beradki Sargarwadi) Taluka:- Malshiras Excavation for foundation/pipe trenches in earth, soils, of all types sand, gravel, and soft murum, including removing the excavated material up to a distance of 50 m and lift as below stacking and spreading, as directed normal dewatering, preparing the bed for foundation and Excluding back filling etc.complete (MJP D.S.R. 2023-24 Item No.1 Page No 37) |
| 55 | Excavation for foundation/pipe trenches in Hard Murum including removing the excavated material up to a distance of 50 m and lifts as below, stacking and spreading as directed by Engineer-In-Charge, normal dewatering preparing the bed for foundation and excluding back filling, etc.complete. (MJP D.S.R. 2023-24 Item No.2 Page No 37) |
| 56 | Excavation for foundation /pipe trenches in soft rock and old cement and Lime masonry foundation asphalt road including removing the excavated material up to a lead of 50 m beyond the lift as below, Stacking as directed by Engineer-In-Charge normal dewatering, preparing the bed for foundation and excluding back filling, etc. Complete (MJP D.S.R. 2023-24 Item No.5Page No 37) |
| 57 | Filling in Plinth and floor murum bedding in Trenches with approved murum for excavated material from foundation 15 cm to 20 cm Layer including watering,ramming and compaction ete complete(MJP D.S.R. 2023-24 Item No.16 Page No 41) |
| 58 | 75 mm Dia.4 Kg/cm2. |
| 59 | 75 mm Dia.4 Kg/cm2. |
| 60 | 80 mm Sluice Valve |
| 61 | 65 mm Sluice Valve |
| 62 | Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation surcharging, etc.complete (MJP D.S.R. 2023-24 Item No.15 Page No 40) |
| 63 | GST18% Please Enable Macros to View BoQ information |