|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.b)Brick Masonary In cement mortar |
| 2 | Construction of embankment with good quality earth obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications |
| 3 | Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications |
| 4 | Dismantling ConcretePrestressed / Reinforced cement concrete grade M-20 & above |
| 5 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)I)Ordinary soilB) Mechanical Meansi)Depth upto 3 m |
| 6 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.A) PCC Grade M15(ii) With Batching Plant, Transit Mixer and Manual placing |
| 7 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsB) PCC Grade M20(p) Height upto 5m |
| 8 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsG) RCC Grade M30(p) Height upto 5m |
| 9 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications |
| 10 | Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding for Culverts. M15 grade concrete |
| 11 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 12 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification(A) Granular Material |
| 13 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. |
| 14 | Bituminous Concrete Grading -II (Providing and laying bituminous concrete with higher capacity Continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) |
| 15 | Drainage Spouts complete as per drawing and Technical specification |
| 16 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification |
| 17 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification |
| 18 | Construction of Parapet on both sides M 15 concrete |
| 19 | Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) |
| 20 | Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding for MNB at Km 56.250 and 59.650.(B) Cement Concrete blocks Grade M15 |
| 21 | Curtain wall complete as per drawing and Technical specificationA)Cement Concrete Grade M15 |
| 22 | Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. |
| 23 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA) Stone/Boulder |
| 24 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Please Enable Macros to View BoQ information |