|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 70% & 30% Ordinary rock |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 5.2.1 DELETED 5.2.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:4:8 or leaner mix (i/c equivalent design mix) |
| 7 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :15 mm to 40 mm nominal bore. |
| 8 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :Above 40 mm nominal bore. |
| 9 | Supply of stones |
| 10 | Dumping of stones in horizontol on level |
| 11 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 80mm dia |
| 12 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 65mm dia |
| 13 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 50mm dia |
| 14 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) 40mm dia |
| 15 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 100mm dia (M) |
| 16 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 80mm dia |
| 17 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 65mm dia |
| 18 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 50mm dia |
| 19 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 40mm dia |
| 20 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 32mm dia |
| 21 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth All kinds of soil : 1 mtr cutting edge |
| 22 | Centering and shuttering including strutting, propping etc. and removal of form for: Arches, domes, vaults upto 6 m span |
| 23 | Extra for arches, domes, vaults exceeding 6 m span |
| 24 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size |
| 25 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 26 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge All works upto plinth level |
| 27 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 28 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-in charge All works above plinth level upto floor V level |
| 29 | Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 5.5.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 30 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 31 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases for columns |
| 32 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. |
| 33 | Labour for steel rope crossing including cost of U-Clamp, iron clamp/hooks, labour charges for stretching the steel rope in position, hire charges of chain pully along with operator, laying and fitting of GI pipes including all carriages complete job |
| 34 | Providing steel rope 20mm dia including all carriages complete job |
| 35 | Providing of GI pipe 100mm dia (Stock rate) |
| 36 | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 coarse sand) |
| 37 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) |
| 38 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete |
| 39 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). 150 mm dia. Class I |
| 40 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). 100 mm dia. Class I |
| 41 | Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). 80 mm dia. Class I |
| 42 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 100 mm dia. nominal bore (Light) |
| 43 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 80 mm dia. nominal bore (Light) |
| 44 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 65 mm dia. nominal bore (Light) |
| 45 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 50 mm dia. nominal bore (Light) |
| 46 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 40 mm dia. nominal bore (Light) |
| 47 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 32 mm dia. nominal bore (Light) |
| 48 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 25 mm dia. nominal bore (Light) |
| 49 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m |
| 50 | Providing flanged joints to double flanged C.I. / D.I pipes and specials including testing to joints. 100 mm dia. Pipe |
| 51 | Providing flanged joints to double flanged C.I. / D.I pipes and specials including testing to joints. 80 mm dia. Pipe |
| 52 | Providing flanged joints to double flanged C.I. / D.I pipes and specials including testing to joints. 65 mm dia. Pipe |
| 53 | Welding, including transportation of plant at site etc. complete By electric plant |
| 54 | Carriage of GI pipe by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 75 km & by manual means from road side avg distance 500 mtr |
| 55 | Carriage of Cement by Manual means from road side to site of work including cost for loading, unloading. and stacking for an av. distance of 500 mtr |
| 56 | Carriage of Cement by Manual means from road side to site of work including cost for loading, unloading. and stacking for an av. distance of 1000 mtr |
| 57 | Carriage of Cement by Manual means from road side to site of work including cost for loading, unloading. and stacking for an av. distance of 1800 mtr |
| 58 | Carriage of Steel by Manual means from road side to site of work including cost for loading, unloading. and stacking for an av. distance of 500 mtr |
| 59 | Carriage of Steel by Manual means from road side to site of work including cost for loading, unloading. and stacking for an av. distance of 1000 mtr |
| 60 | Carriage of Steel by Manual means from road side to site of work including cost for loading, unloading. and stacking for an av. distance of 1800 mtr |
| 61 | Carriage of Sand by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 90 km & by manual means from road side avg distance 500 mtr |
| 62 | Carriage of Sand by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 90 km & by manual means from road side avg distance 1800 mtr |
| 63 | Carriage of Sand by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 110 km & by manual means from road side avg distance 1000 mtr |
| 64 | Carriage of Soling stone/ boulders by from source (to be identified by engineer in charge) including loading and unloading. for an average distance of 750 Mtr Head Load |
| 65 | Carriage of stone aggregate (Crushed) above 40 mm by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 5 km & by manual means from road side avg distance 500 mtr |
| 66 | Carriage of stone aggregate (Crushed) above 40 mm by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 20 km & by manual means from road side avg distance 1000 mtr |
| 67 | Carriage of stone aggregate (Crushed) above 20 mm by Mechanical Transport from source (to be identified by engineer in charge) to road side including cost for loading and unloading.for an av. distance of 05 km & by manual means from road side avg distance 1800 mtr Please Enable Macros to View BoQ information |