| 1 | Electrical Items : |
| 2 | Loading. Carriage and unloading of ST poles including old & used S.T. Pole from store to work site or vice-versa. |
| 3 | Loading. Carriage and unloading of ST poles including old & used S.T. Pole from store to work site or vice-versa with help of Crain |
| 4 | Erection of Single/Stud Pole including fitting of all material. |
| 5 | Erection of Double pole structure as per standard specifications |
| 6 | Erection of Double pole structure from existing Single Pole including fitting of M.S. Channel and other accessories etc. |
| 7 | Grouting of pole with cement brick ballast and course sand as per standard specification. |
| 8 | Making of pole plinth of 400 mm día, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 9 | Painting of Steel Tubular Pole with one coat of red oxide and two coats of first enamel Alm. Paint upto fuse set including cost of all materials, |
| 10 | Earthing of supports as per standard specifications. |
| 11 | Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 12 | Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 13 | Loading, Carriage and unloading of DOG/ Panther Conductor from store to work site or vice-versa. |
| 14 | Loading, Carriage and unloading of Earth wire/G.I. wire from store to work site or vice-versa. |
| 15 | Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire including of cross lacing. |
| 16 | Dismantling of 33/11 KV V-Type X-arm/M.S Channel/Guarding Angle/LT Bracket etc. from damage pole. |
| 17 | Excavation of ST pole (Old & Used) from ground by digging the pit or by cutting with gas cutter and its proper stacking. |
| 18 | Dismantling of binding wire from insulators and loosening of the DOG mixed conductor on each pole then lowering down the DOG mixed conductor & rolling into bundles. |
| 19 | Making of H.T. Section points by brackets, clamps & Insulator. tightening of Line, binding of conductor & proper connection. |
| 20 | Making of H.T. Jumpers with 3 Phase 3 Wire H.T. O.H. line after erection of work. |
| 21 | Chopping of tree branches lying in the route of HT line touching the tree branches to the phase line cordactor making fault to the feeder, for 75mm dia to 450mm dia or as per requirement of site |
| 22 | Fitting of Cross bracing on double pole structure and related work. |
| 23 | Carriage of all concerning stock material except mentioned above from Kesco. Store to site or vice-versa |
| 24 | Connecting of newly erected network with Kesco mains including testing, commissioning and energization of the same completely |
| 25 | Taking out 33 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa. |
| 26 | Dismantling of 33 KV cable box from existing 33 KV Jarjar VCB/OCB. |
| 27 | Laying of 33 KV 3x300/3x400 mm2 Cable Over bead (Pole to Pole) with Fixing of Holding Clamp on existing/newly erected ST Pole |
| 28 | Re-sagging of conductor, on old line after erection of pole, binding of conductor etc. |
| 29 | Laying, stringing, tensioning and binding of DOG conductor for H.T O.H. |
| 30 | Fixing of guarding angle/guarding channel for laying of guarding |
| 31 | Cross lacing of guarding by Gl. wire (approximate 5 lacing of cach span) |
| 32 | Restoration of Metallic RCC road after proper repairing with appropriate materials. |
| 33 | Erection of Tri-Pole structure including all fittings and proper alignment. |
| 34 | Erection of four pole structure including all fittings as well as proper alignment of structure. |
| 35 | Painting of M.S. structures fitted on pole such as channel, angle, brackets |
| 36 | Erection of O/D type Metering unit on D/P Structure |
| 37 | Loading, carriage & unloading of O/D type metering unit from store to site & vice-versa. |
| 38 | Providing of jeep gang with T & P duty on special accessories |
| 39 | Providing one paidal gang with T & P on duty on special accessories |
| 40 | Fabrication and Erection of X-bracing on Four pole structure with fixing of bracing clamp. |
| 41 | Dismantling of Top Bracket from existing single pole. |
| 42 | Lowering of ACSR dog Conductor of 33 KV single line for adjusting of V cross arm of single Ckt. line for converting double Ckt. line. |
| 43 | Fixing of V-Type cross arm on erected/existing double/try/four pole. |
| 44 | Fixing of M.S. Channel on erected/existing double/try/four pole. |
| 45 | Fixing of M.S. Angle on erected/existing double/try/four pole. |
| 46 | Fixing of G.I. Pin and Pin Insulator on erected/existing double/tri/four pole. |
| 47 | Opening the binding for taking out the conductor and dismantling the concern X-arm/bracket from pole/rail. |
| 48 | Dismantling of existing Jarjar Al. Conductor from existing damaged O.H. Line |
| 49 | Mounting of 33 KV Pin Insulator |
| 50 | Fixing of 11/33 kV Disk fitting |
| 51 | Unmounting of Pin/Disc Insulator |
| 52 | Making of 33/11 kV Fuse Point |
| 53 | Laying, stringing, tensioning and binding of ACSR Dog conductor for H.T. O.H. line. |
| 54 | Repairing of damage of H.T./ S.T. Pole comprising following works:- |
| 55 | Opening the binding for taking out the conductor and dismantling the concern X-arm/bracket from pole/rail. |
| 56 | Taking out the damaged pole from ground by digging the pit or by cutting with gas cutter and its proper stacking. |
| 57 | Repairing of damaged S.T. Pole by providing M.S. ANGLE 50x50x6 mm 3 Nos. each of 1 meter long by Clamping at 2 points and its welding including its all related work. |
| 58 | Erection of repaired/new S.T. Pole size 11.00 Mtr. to 13.00 Mtr. including digging of Pit back filling and ramming. |
| 59 | Mounting of 33 KV X-arm/bracket on the pole/rail. |
| 60 | Dismantling /Replacement of 33KV pin insulator with G.I. Pin AND 33 kv disc insulator with fitting from damaged pole/ X-arm opening of binding from Insulator. |
| 61 | Repairing of 33 KV damaged X-arm and proper shaping including drilling of holes whatsoever is required with the help of gas healing and welding. |
| 62 | Making special pole plinth of double pole of size 2 mtr. x0.5 mtr. |
| 63 | Digging of Trench for laying of 33 KV cable in normal soil in size of 30 cm wide and 1 to 1.5 meter deep |
| 64 | Digging of Trench for laying of 33 KV cable in kharanja soil in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 65 | Digging of Trench for laying of 33 KV cable in metallic rood in size of 30 cm. wide and 1 to 1.5 meter deep. |
| 66 | Laying of MS Pipe in digged trench |
| 67 | Laying of 33 KV XLPE cable in above digged trench covering with bricks and bock filling and proper ramming |
| 68 | Laying of 33 KV XLPL Cable through MS. pipe in digged trench |
| 69 | Making indoor/outdoor joints of 33 KV XLPE Cable where the cable is being laid. |
| 70 | Making 33 kV straight through joint including digging of pit upto 1.1 metre depth |
| 71 | Digging of pit using JCB for making straight through joint 1mx1mx1m |
| 72 | Mounting of all types of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable bax on both ends without pipe |
| 73 | Fabrication of Cable Support Structure. |
| 74 | Digging of Pit 2x2x1 mtr. for laying of cable through HDD Method. |
| 75 | Laying of 33/11 KV 3x300/400/185/70 sq.mm XLPE with HDPE Pipe through HDD Method and also marking feeder name on pipe with Paint at the interval of each 100 mtr. Along with supply of pipe |
| 76 | Laying of 33/11 KV 3x300/400/185/70 sq.mm XLPE without HDPE Pipe through HDD Method and also marking feeder name on pipe with Paint at the interval of each 100 mtr. |
| 77 | Pegging of 3 mtr. long Earth Electrodes 40 mm dia in to ground by hammering keeping its head 0.5mtr. below the ground level. |
| 78 | Laying of earthing strip of 50x6/40x5/25x3 mm M.S. Flat after cutting, bending, shaping and welding with earth electrodes with welding of 'U' Clamps on each electrodes and making proper joints overlapping with 40 cm each other it includes welding of riser from making earth mate to structure of both side. |
| 79 | Laying of 40 mm2 M.S. rod after cutting bending, shaping and welding with earth electrodes with welding of U clamps on each electrode and making proper joint overlapping 15 Cm each electrode for main earthmate. |
| 80 | Digging of cable trench for taking out old/damaged XLPE/PILCA, 3x50 to 3x300sqmm 33/11KV cable & taking out the above Cable from digged trench and back filling of digged trench and relaying the same cable. |
| 81 | Underground damage cable for repairing digging and filling kaccha road. |
| 82 | Underground damage cable for repairing digging and filling pukka road. |
| 83 | Underground damage cable for repairing digging and filling kaccha and pukka road by JCB machine. |
| 84 | Fabrication of Isolator structure with M.S. Channel, M.S. Angle, M.S. Flat etc. in required size and length including cutting, drilling holes, welding and assembling as per drawing. |
| 85 | Erection and grouting of Isolator structures with 1:4:8 CC 25 mm brick ballast in required size in proper alignment and making plinth of all structure in 1:2:4 CC mix with 20 mm stone grit, 15 Cm ground level to smooth finish and its proper curing including cost of cement. |
| 86 | Erection of 33 KV Line Isolator equipment on erected structure in proper alignment. |
| 87 | Erection of 33 KV Bus Isolator equipment on erected structure in proper alignment. |
| 88 | Loading, Carriage and unloading of Isolator from Kesco. Store to site of work or work site to store including old & damage materials. |
| 89 | Earthing of Isolator Structure or other MS structure with M.S. Flat by welding and connecting to existing earth mate of yard. |
| 90 | Fabrication of Post Insulator/L.A./C.T/P.T Structure. |
| 91 | Fabrication of Cable Support Structure. |
| 92 | Fabrication of Earthing Electrodes 3 mtr. long with 40 mm dia M.S. Round Bar making one end pointed upto 15 Cm. |
| 93 | Fabrication of Busbar Gantry |
| 94 | Fabrication of Neutral Support Structure. |
| 95 | Erection of Post Insulator/L.A./C.T/P.T Structure. |
| 96 | Erection of Cable Support Structure. |
| 97 | Erection of Busbar Gantry with the help Crane. |
| 98 | Erection of Neutral Support Structure. |
| 99 | Erection of 33 KV L.A. |
| 100 | Erection of Post/Pin Insulator with E clamp in Post Insulator Structure/Cable Support Structure. |
| 101 | Erection of 33 KV C.T/P.T with the help of Crane. |
| 102 | Erection of CT/PT junction box |
| 103 | Painting of Post Insulator/L.A./C.T/P.T Structure. |
| 104 | Painting of Isolator Structure. |
| 105 | Painting of Cable Support Structure. |
| 106 | Painting of Busbar Gantry |
| 107 | Painting of Neutral Support Structure. |
| 108 | Loading, Carriage and Unloading of 33 KV L.A. from store to site and vice versa |
| 109 | Loading, Carriage and Unloading of 33 KV C.T/P.T. from store to site and vice versa |
| 110 | Loading, Carriage and Unloading of 33 kV single CRP from store to site and vice versa |
| 111 | Loading, Carriage and Unloading of 33 kV double CRP from store to site and vice versa |
| 112 | Loading, Carriage and Unloading of Rail Pole for bus bar gantry from store to site and vice versa |
| 113 | Loading, Carriage and Unloading of CT/PT junction box from store to site and vice versa |
| 114 | Loading carriage & unloading of main tank of 5/8/10 MVA, 33/11 KV power T/F along with radiators & its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. |
| 115 | Repairing of 33 KV Old Isolator by replacing the jaws and blades or by oiling and greasing of moving parts or by adjustment of moving mechanism or by leveling the whichever is required for smooth operation of isolator and its all related work. |
| 116 | Final leveling of yard and removal of wastage material and soil from switch yard. |
| 117 | Earthing of Power T/F at three points by extending the existing M.S. Flat with main earth mat by welding. |
| 118 | Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. |
| 119 | Filling of drum of T/F oil in Transformer |
| 120 | Dismantling of Rail Poles of existing bus bar gantry |
| 121 | Fixing of danger board on erected poles |
| 122 | Erection of TPMO |
| 123 | Dismantling of TPMO |
| 124 | Dismantling of 33 kV Isolator |
| 125 | Fixing of 33 kV Dead End fitting |
| 126 | Unmounting of Pin/Disc Insulator |
| 127 | Making of 33 kV Fuse Point |
| 128 | Digging of trench and taking out of existing control cable buried in yard. |
| 129 | Dismantling of following power T/F including draining of T/F oil from radiators if necessary dismantling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking. |
| 130 | 10/8/6 MVA, 33/11/6.6 KV T/F |
| 131 | 5/4/3 MVA, 33/11/6.6 KV T/F |
| 132 | 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 133 | 5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 134 | Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer. |
| 135 | 10/8/6 MVA, 33/11/6.6 KV T/F |
| 136 | 5/4 MVA, 33/11/6.6 KV T/F |
| 137 | 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 138 | 5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 139 | 3/1.5 MVA, 33/11/6.6 KV T/F |
| 140 | Loading carriage & unloading of main tank of T/F along with radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. |
| 141 | 10/8/6 MVA, 33/11/6.6 KV T/F |
| 142 | 5/4 MVA, 33/11/6.6 KV T/F |
| 143 | 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 144 | 5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 145 | 3/1.5 MVA, 33/11/6.6 KV T/F |
| 146 | Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work. |
| 147 | 10/8/6 MVA, 33/11/6.6 KV T/F |
| 148 | 5/4/3 MVA, 33/11/6.6 KV T/F |
| 149 | 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane |
| 150 | 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane |
| 151 | Dismantling of earthing of running/damaged transformer at two points with the help of gas cutter. |
| 152 | Dismantling and taking out the cable support structure by cutting with gas cutter for shifting of T/F including cutting of earthing of cable support structure wherever is required including its all related work. |
| 153 | Dismantling and taking out the neutral support structure by cutting with gas cutter alongwith removing of flexible copper bond and its proper stacking. |
| 154 | Erection and welding of cable support structure with the help of welding including earthing of support in proper alignment and all related work. |
| 155 | Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond. |
| 156 | Earthing of T/F at two points by extending the existing M.S. Flat with main earthmate by welding. |
| 157 | Fabrication of neutral support structure with M.S. Angle and M.S. Flat. |
| 158 | Erection and grouting of neutral support structure with 1:4:8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. |
| 159 | Disconnecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. |
| 160 | Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. |
| 161 | Fabrication of isolator structure as per standard design. |
| 162 | Erection and grouting of Isolator structure in proper alignment and making plinth 15 Cm. above ground level with smooth finish. |
| 163 | T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening. |
| 164 | Repairing of damage of H.T./L.T. S.T. Pole comprising following works:- |
| 165 | Opening the binding for taking out the conductor and dismantling the concern X-arm/bracket from pole/rail. |
| 166 | Taking out the damaged pole from ground by digging the pit or by cutting with gas cutter and its proper stacking. |
| 167 | Repairing of damaged S.T. Pole by providing M.S. ANGLE 50x50x6 mm 3 Nos. each of 1 meter long by Clamping at 2 points and its welding including its all related work. |
| 168 | Transportation charges T/F oil from store to site |
| 169 | Centrifusing of T/F Oil by Centrifusing Machine |
| 170 | Dismantling of 33 KV C.T./P.T. With help of Crane |
| 171 | Laying of Control Cable |
| 172 | Dismantling of 33 KV L.A |
| 173 | Erection of Upper Bus bar |
| 174 | Erection of Lower Bus bar |
| 175 | Dismantling of Upper Bus bar |
| 176 | Dismantling of Lower Bus bar |
| 177 | Dismantling of Rail Poles of existing bus bar gantry with help of Crain |
| 178 | Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. |
| 179 | Cutting of Rail Pol 3 Mr. Long |
| 180 | Repairing of Damaged X Arm / Brackets |
| 181 | Fabrication of M.S. Item |
| 182 | Loading, Carriage and Unloading of Rail Pole for bus bar gantry from store to site and vice versa With the help of Crain Please Enable Macros to View BoQ information |