| 1 | Cleaning and excavation of slush/liquid soil, silt etc. From the existing drain bed in/cl requered lift & iead directly upto Hapania dumping ground or any other suitable place by mechanical meance as per direction of the Engg-in-charge. |
| 2 | Excavation for StructuresA. Without dewatering.Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.I Ordinary Soil (i) Upto 3 m depth |
| 3 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I Sand filling |
| 4 | Dry brick pitching in road side drainsProviding dry brick pitching in road side drain with 1st class brick laid on edge to specified lines, grades, levels and dimensions as per approved design and MoRD Technical Specification Clause 307, 1606. (Excluding the cost of excavation which would be paid separately) |
| 5 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (includingcentering, shuttering, staging etc. but excluding reinforcement) I P.C.C grade M 10 (using jhama brick aggregate) (ii) Nominal mix 1:3.6 (Hand mixing) |
| 6 | Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900,1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement). V. R.C.C grade M 20 |
| 7 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in foundation complete as per drawings & MoRD technical specifications Clauses 1000 & 1202. |
| 8 | Brick masonry work in cement mortar in foundation completed excluding pointing & plastering as per drawing& MoRD technical specifications Clauses 600, 1202 &1203. II Brick masonry in 1:4 cement mortar |
| 9 | Plastering with cement mortar (1:4) 12 mm thick on brickwork/ C.C. work including a finishing coat of neat cement punning with 2.75 kg of cement per sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204 |
| 10 | Providing concrete for plain/reinforced concrete in openfoundations complete including formwork as per drawings& MoRD technical specifications Clauses 802, 803, 900,1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).III P.C.C grade M 20 (i) Nominal mix (1:2:4) |
| 11 | 80 mm thick factory made c.c. interlocking paver block of M-35 GradeProviding and laying factory made coloured chamfered edge Cement Concrete paver blocks of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with fine sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways or light traffic parking etc. complete as per specifications & approval/ direction of Engineer-in-Charge (a) 80 mm thick c.c. paver block of M-35 grade with approved colour, design and pattern(Dwel colour ractangular) Please Enable Macros to View BoQ information |