| 1 | Providing 'A' type single spur with 1st class bamboo (Bholuka or Barua) 85 mm to 100 mm dia closely placed 230 mm centre to centre, driven 1200 mm to 1500 mm below ground and 3 m to 4 m above ground and tied withcane or coir string, half 2nd class bamboo (Jati or Bethua) horizontally on both face placed not more than one metre apart and 2 nos. of purlin at top and bottom fitted with vertical struts at 1500 mm apart and filling with brushwoodor jungle wood inside the spur complete as per drawing and technical specifications. |
| 2 | Providing close bamboo toe walling consisting of 65 mm to 75 mm diameter bamboos driven 900 mm below ground and 900 mm above ground at 150 mm C/C and provided with three horizontal split bamboo runner fixed with nails.All bamboos to be duly protected by coal tar painting |
| 3 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or woodenor steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks andguide banks or filling up ground depressions, lead upto 50m and lift upto 1.5 m :-All kinds of soil |
| 4 | Pumping outwater causedby springs, tidal or river seepage, broken water mains or drains and the like. |
| 5 | Earth work in excavation by mechanical means (Hydraulicexcavator) / manual means in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) includingdressing of sides and ramming of bottoms, lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil |
| 6 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. I Sand filling |
| 7 | Providing and laying dry flat brick flooring in required pattern complete. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level:- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 10 | Reinforced cement concrete work in walls (anythickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stoneaggregate 20 mm nominal size) |
| 11 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing andreinforcement 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 12 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 13 | First class brick work in foundation and plinth including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ). |
| 14 | Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for massconcrete with timber plank |
| 15 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with Shuttering ply |
| 16 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with Shuttering ply |
| 17 | Centering shuttering including struttings, propping etc. and removal of form work for: Spiral staircases (including landing) - cast-in-situ with ply |
| 18 | Half brickmasonryworkwith first class bricks insuperstructureuptofloor five level includingcostofall materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ) |
| 19 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand)With net cement puning |
| 20 | ProvidingandfixingM.S. roundholdingdownboltswith nuts and wahser plates complete as per standard design. |
| 21 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes |
| 22 | Providing and laying cement concrete 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips etc. all complete as per direction of Engineer-in-charge. 40 mm thick with 20 mm stone aggregate |
| 23 | Providing and fixing chequered terrazo tiles 22 mm thick with graded marble chips of size upto 6 mm, laid on floors, footpath & courtyard on 20 mm thick bed of cement mortar 1 : 4 ( 1 cement : 4 fine sand ) jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and polishing etc. all complete as per direction of Engineer-in-charge. Light shade pigment using white cement |
| 24 | Kota stone slabs 25 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1 : 3 ( 1 cement : 3 fine sand ) and joined with ordinary cement slurry mixed with pigment to match theshade of slabs, including rubbing and polishing etc. all complete as per direction of Engineer-in-charge. |
| 25 | Finishing walls with textured exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issuedby the Manufacturer] : New work ( two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied@ 2.20 kg/10 sqm |
| 26 | Finishing with Epoxy paint ( two or more coats) of approved brand and manufacture at all locations prepared and applied as per manufacturer's specificationincluding appropriate priming coat, preparation of surface etc. complete [Payment shall be made after submission of Test Certificate issued by theManufacturer].On steel work Please Enable Macros to View BoQ information |