| 1 | Installation of 1000 mm width 210 mtr length belt conveyor at 16D and extension of 21EL belt by 105 mtr for LHCM in RIV seam. (Inclusive of EPF/CMPF) |
| 2 | Dimantling of discharge unit with required M.S. joist from PB6 panel belt conveyors |
| 3 | Loading, transportation and fitting of Dismantled discharge unit with required M.S. joist from PB6 panel belt conveyors to 16D belt |
| 4 | Dismantling of heavy duty drive headfrom PB6 panel belt conveyors |
| 5 | Loading, transportation and fitting of Dismantled heavy duty drive headfrom PB6 panel belt conveyor to 16D belt |
| 6 | Dismantling of Tail end assy along with V scrapper tail end guard decking plate from PB6 Panel belt conveyor |
| 7 | Loading, transportation and fitting of Dismantled Tail end assy along with V scrapper tail end guard decking plate from PB6 Panel belt conveyor to 16D belt conveyor |
| 8 | Dismantling of 315 mtrs structure from PB5, PB6, PB7 and PB8 panel belt conveyors- 110 kg/mtr |
| 9 | Loading, transportation and fitting of Dismantled 315 mtrs structure Ffrom PB5, PB6, PB7 and PB8 panel belt conveyors- 110 kg/mtr |
| 10 | Dismatling of pvc belting from PB5, PB6, PB7 and PB8 panel and then coiling |
| 11 | Loading, transportation and fitting of Dismantled pvc belting from PB5, PB6, PB7 and PB8 panel belt conveyor to 16D belt conveyor |
| 12 | Dismantling of Load table from PB6 panel belt conveyors |
| 13 | Loading, transportation and fitting of Dismantled Load table from PB6 anel to 16D belt conveyors |
| 14 | Fencing of drive hed, tail end etc. including coat of DA and Oxygen and welding electrodes |
| 15 | Fabrication & fitting of veticle support for structure hanging portion from discharge to loop take up including coast of DA and 02 nos oxygen cylibnder |
| 16 | Fabrication of load table at surface workshop including coat of DA, Oxygen and welding electrode |
| 17 | loading, unloading transportation of control cable and accessories laying and fitting |
| 18 | Transportation & placing electrical ACB, starter,cable (power &control) from surface to drive head |
| 19 | tail end shifting |
| 20 | Holding boltsfor tail end and hopper per shifting 6 holes+ 70 for drive head |
| 21 | Conssumables MS nut and bolt 5/8\\"x2\\"-530kg |
| 22 | Installation of 1000 mm width 1015 mtr length belt conveyor at 27L for LHCM in RIV seam. (Inclusive of EPF/CMPF) |
| 23 | Dimantling of discharge unit with required M.S. joist from PB8 panel belt conveyors |
| 24 | Loading, transportation and fitting of Dismantled discharge unit with required M.S. joist from PB8 panel belt conveyors to 27EL belt |
| 25 | Dismantling of heavy duty drive headfrom PB8 panel belt conveyors |
| 26 | Loading, transportation and fitting of Dismantled heavy duty drive headfrom PB8 panel belt conveyor to 27EL belt |
| 27 | Dismantling of Tail end assy along with V scrapper tail end guard decking plate from PB8 Panel belt conveyor |
| 28 | Loading, transportation and fitting of Dismantled Tail end assy along with V scrapper tail end guard decking plate from PB8 Panel belt conveyor to 27EL belt conveyor |
| 29 | Dismantling of 1015mtr structure from PB5, PB6, PB7 and PB8 panel belt conveyors- 110kg/mtr |
| 30 | Loading transportation and fitting of Dismantled of 1015mtr structure from PB5,PB6,PB7 and PB8 panels and fittig in 27EL Belt |
| 31 | Dismantling of pVC Belting from PB5,PB6,PB7and PB8 and than coiling |
| 32 | Loading transportation and fitting of Dismantled pvc belting from PB5,PB6,PB7 and PB8 panels and fittig in 27EL Belt |
| 33 | Dismantling of Loop take up from PB5, PB6, PB7 and PB8 panel belt conveyors- 110kg/mtr |
| 34 | Loading transportation and fitting of Dismantled of loop take up from PB5,PB6,PB7 and PB8 panels and fittig in 27EL Belt |
| 35 | Dismantling of load table from PB5, PB6, PB7 and PB8 panel belt conveyors- 110kg/mtr |
| 36 | Loading transportation and fitting of Dismantled of load table from PB5,PB6,PB7 and PB8 panels and fittig in 27EL Belt |
| 37 | Fencing of drive hed, tail end etc. including coat of DA and Oxygen and welding electrodes |
| 38 | Fabrication & fitting of veticle support for structure hanging portion from discharge to loop take up including coast of DA and 02 nos oxygen cylibnder |
| 39 | Fabrication of load table at surface workshop including coat of DA, Oxygen and welding electrode |
| 40 | loading, unloading transportation of control cable and accessories laying and fitting |
| 41 | Transportation & placing electrical ACB, starter,cable (power &control) from surface to drive head |
| 42 | tail end shifting |
| 43 | Holding boltsfor tail end and hopper per shifting 6 holes+ 70 for drive head |
| 44 | Conssumables MS nut and bolt 5/8\\"x2\\"-530kg |
| 45 | Installation of 1000 mm width 175 mtr length belt conveyor at 40R for LHCM in RIV seam. (Inclusive of EPF/CMPF) |
| 46 | Dismantling, Loading Unloading carrying and transportation of discharge unit with required M.S. joist From Surface to mentioned belt conveyor |
| 47 | Loading Unloading, carrying and transportation of heavy duty drive head From Surface to mentioned belt conveyor |
| 48 | Loading Unloading carrying and transportation of Tail end assy along with V scrapper tail end guard decking plate from Surface to mentioned belt conveyor |
| 49 | Loading Unloading carrying and transportation and fitting of 175 mtrs structure From Surface to mentioned belt conveyor - 110 kg/mtr |
| 50 | Loading Unloading carrying and transportation of pvc belting from surface to belt, install at site then laying and lapping of belt |
| 51 | Loading Unloading carrying transportation of Load table from Surface to mentioned belt conveyor |
| 52 | Fencing of drive hed, tail end etc. including coat of DA and Oxygen and welding electrodes |
| 53 | Fabrication & fitting of veticle support for structure hanging portion from discharge to loop take up including coast of DA and 02 nos oxygen cylibnder |
| 54 | Fabrication of load table at surface workshop including coat of DA, Oxygen and welding electrode |
| 55 | loading, unloading transportation of control cable and accessories laying and fitting |
| 56 | Transportation & placing electrical ACB, starter,cable (power &control) from surface to drive head |
| 57 | tail end shifting |
| 58 | Holding boltsfor tail end and hopper per shifting 6 holes+ 70 for drive head |
| 59 | Conssumables MS nut and bolt 5/8\\"x2\\"-530kg |
| 60 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |