| 1 | (A)Routine and proper Maintenance of 4 cluster (Each Cluster having 5 seated permanent toilets with urinal complex ) of Permanent Toilet at different locations with water supply and sanitation facilites Supplying , Flat flexible submersible cable with, copper conductor, PVC insulated, and PVC sheathed . DW&S (146, M1062) 3Core 2.50 sq mm |
| 2 | 3 Core PVC insulated, PVC sheathed aluminum armored cable . 3 core 10 sq mm |
| 3 | Supplying all labour, tools and equipment for fitting and fixing panel board lowering & taken out of Submersible Motor Pump with all complete as per building specification and direction of E/I. |
| 4 | Providing & Supplying High Density Polyethylene Pipe (HDPE Pipe) of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 suitable for water supply which is available in all standards like ISI-4984, ISO-4427, DIN-8074 and various grades including transportation (taken avg 10%), taxes and duties (taken 2%), contractor profit and overhead charges (taken15%). HDPE pipe of materials grade PE80- PN-10 (dia in mm)40mm dia (Column Pipe) |
| 5 | Cost of Eletrification of Toilet complex with inside & out side lighting arrangement with LED bulb |
| 6 | Providing Electrical Connection charge for JVBNL and Electric Charge |
| 7 | Providing supplying, fitting & fixing Push Cock / Bib cock as approved make. |
| 8 | (B) Provision for cleaning and routine maintenance of One cluster (each cluster consist 5 nos.) P.Toilet and cleaning surrounding place of latrinesProviding sweepers for cleaning and maintaining the latrines and cleaning surrounding place of latrines in two shifts. 1no.×2 shifts×30days |
| 9 | Providing Bleaching Powder for cleaning and disinfecting near pan & latrines. 2.50kg. ×30days |
| 10 | Providing soaps, washing Powder or any other detergents for hand cleaning after use of latrines etc. all complete job 1kg×30days |
| 11 | Providing G.I. Buckets, rope where ever required etc. including carriage of materials from different sources all complete for cleaning the latrines and surrounding 5nos. P.V.C. small bucket, etc. |
| 12 | (C) Repairing scrapping shabby surface and painting Permanent Toilet one cluster (One Cluster consists of 5 units) and other required woks.Providing two coats of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface throughly,scaffolding and taxes all papering including cost of scaffolding and taxes all complete as per building specification & direction of E/I. |
| 13 | Providing two coats of dry distemper of approved shade and make over primer coat of whiting over new surface including prepairing the plastered surface by rubbing smooth with pumice stone or fine sand paper, applying putty where required, scaffolding,washing of floors and taxes all complete as per building specification and direction of E/I. |
| 14 | (D) Provision for Emptying of Septic Tanks of 1 Cluster (Each Cluster consists of 4 x 5 Unit of Permanents toilet) Permanent toilets by removing Sludge using Suction Jetting Machine Hire Charges of Suction Jeting machine 1500 PSI machine i/c POL and operator to remove excessive Sludge from Septic tank from time to time and disposal of slide away from mela kshetra at safe place.(Assuming emptying of septic tank is required TWICE every 5 days during whole mela period i.e 10 days TOTAL). |
| 15 | Providing 1 Nos of Sweeper for Assisting operator.1 Nos x 10 days |
| 16 | Supplying tractor on hire basis with driver |
| 17 | Fuel (Diesel) av. Consumption 10 liter in each trip( Total trips during mela period= 10), i.e total 100 liter |
| 18 | (E) Repairing 1 Nos of 10 Seater Mobile Bio Toilet with Full Body work including painting ,Hatch etc.Spray Painting both out side and inside & Lower Panel. |
| 19 | Pipe wiring & Tap fitting with plumbing work (Full Body) |
| 20 | Providing Extension Pipe |
| 21 | Reparing of Hatch |
| 22 | Welding and Repairing of Full Body |
| 23 | Providing of 2 nos Tyre |
| 24 | Fitting and fixing of New tyres and Greasing of movable Parts |
| 25 | (F) Provision Cleaning and routine maintenance of 1 nos. Mobile bio Toilets and cleaning surrounding place of ToiletsProviding sweepers for cleaning and maintaining the latrines and cleaning surrounding place of latrines in two shifts.1no.×2 shifts×30days |
| 26 | Providing Liquid Handwash,or any other Soap for hand cleaning after use of latrines etc. all complete job1kg×30days |
| 27 | Providing G.I. Buckets, rope, Harpic, cleaner brushes where ever required etc. including carriage of materials from different sources all complete for cleaning the latrines and surrounding 5nos. P.V.C. mugs, 1no. Drum. |
| 28 | (G) Providing Biodigester Chemical for decomposition of facial waste in Mobile Bio-Toilet with 10 seaterBio-Digester Chemical for 1 nos of 10 seater Mobile Bio Toilet. |
| 29 | (H) Providing water supply arrangement in 1 Nos. 10 seater mobile bio-toilet continuouslyCost of Hiring water tanker of minimum 5000 ltr. Capacity.(P&M137 sl no-489) |
| 30 | Cost of Hiring pump set of capacity 4000ltr per hr for filling water in Syntax tank(P&M131 sl.no.-483) |
| 31 | Supplying tractor on hire basis with driver |
| 32 | Fuel (Diesel) av. Consumption 3 liter in each trip (4 nos. trip in each day) = 4x 2=8 ltrs. |
| 33 | Lubricants - |
| 34 | (I) Provision for Painting of Existing IM-II Handpumps on Kanwariya RoutePainting of Existing IM- II HandpumpsProviding primer one coat of red lead paint of approval make over new steel surface including preparing the surface after cleaning , removing dust,dirt,scales smokes and grease and clearing the surface throughly as per specification of E/I. |
| 35 | Providing two coats of painting with ready mixed paint of approved shade and make over steel surface including cleaning the surface throughly, scaffolding and taxes all complete as per specification and dir. of E/I. |
| 36 | Hire charge of two wheeler per day with Fuel cost of petrol cusmption per day |
| 37 | Add 18 % GST |
| 38 | Add 1% Labour Cess Please Enable Macros to View BoQ information |