Labour for cleaning the work site before and after work etc.
2
Labour for cleaning the work site before and after work etc.
3
Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size).
4
Providing Tor steel reinforcement of 8mm & 10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.8mm Dia.
5
10mm Dia.
6
12mm Dia.
7
Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete.
8
(i) Sand (Lead Upto 42 km)
9
(iv) Stone Chips (Lead 15KM)
10
Good & Service Tax (GST)
11
Labour Cess Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.