|
| 1 | Running, Maintenance & Operation of clear water booster pump sets, Submersible P/sets, storm water, and D.G. Sets at 880 EWS Houses in Group-1 at Sirsapur, Narela, as per attached inventory (Annexure-A). |
| 2 | Running, Maintenance & Operation of storm water P/sets at 880 EWS Houses in Group-1 at Sirsapur, Narela as per attached inventory (Annexure-A). |
| 3 | Running, Maintenance & Operation of clear water booster pump sets, Submersible P/sets, storm water, D.G. Set at 1960 EWS Houses in Group-2 to 4 at Sirsapur, Narela as per attached inventory (Annexure-A). |
| 4 | Running, Maintenance & Operation of storm water P/sets at 1960 EWS Houses in Group-2 to 4 at Sirsapur, Narela as per attached inventory (Annexure-A). |
| 5 | Maintenance & operation of Park light as per inventory and terms & conditions attached. Note: The contractor shall maintain the park lighting luminaries with the help of Sky lift/ Tower wagon, nothing extra shall be paid on this account. |
| 6 | Lifting of sub. Pump set from the existing bore well along with G.I. pipe, bend, sub. Cable and other accessories i/c dismantling of G.I. pipe and pump sets etc. complete as required |
| 7 | Lowering of sub. Pump set in the existing bore well along with G.I. pipe, bend, sub. Cable upto required depth i/c making water proof cable joint connection, testing etc. as required |
| 8 | Repairing and rewinding of submersible Pump set, 7.5 HP, 6” dia , 3 Phase, 415 Volt i/c supplying and replacement the following defective/ worn out parts of motor and pump i/c reassembling, painting , testing etc. as required.a) Motor side i) Rewinding of Sub. Motor – 1 No.ii) Rotor sleeve – 1 No.iii) Water seal – 2 Nos. iv) G.M. bearing – 2 Nos. v) Coupling sleeve with key – 1 setB) Pump Side (6 Stage)i) Distance bush – 6 Nos.ii) Guide bush – 6 Nos.iii) Neck ring – 6 Nos.iv) Impeller key – 6 Nos. |
| 9 | Repairing and rewinding of submersible Pump set, 5.0 HP, 6” dia , 3 Phase, 415 Volt i/c supplying and replacement the following defective/ worn out parts of motor and pump i/c reassembling, painting , testing etc. as required.a) Motor side i) Rewinding of Sub. Motor– 1 No.ii) Rotor sleeve – 1 No.iii) Water seal – 2 Nos. iv) G.M. bearing – 2 Nos. v) Coupling sleeve with key – 1 setb) Pump Side (6 Stage)i) Distance bush – 6 Nos.ii) Guide bush – 6 Nos.iii Neck ring – 6 Nos.iv) Impeller key – 6 Nos. |
| 10 | Servicing of 62.5 KVA D.G. set Kirloskar Make including replacement of the following items complete with testing on full load etc. as required. a) Filter Setb) 12 V Selfc) Mobile oil d) Lubricating Oil Pumpe) Piston Head .f) Coolant g) Engine Servicing Charges & Cartage |
| 11 | Repairing and Servicing of 125 KVA D.G. set Kirloskar Make including replacement of the following items complete with testing on full load etc. as required. a) Lubricant Oil (K oil)b) Lubricant Oil 054 Pack ( K Oil) c) Fuel Filter setd) Lubricant Oil Filtere) Air Filter Primaryf) Air Filter g) Lubricant Oil Pumph) Fan Pully Assemblyi) Rotor Pump assemblyj) Vent Pipek) Engine servicing charges and Cartage |
| 12 | Providing, laying, testing & commissioning of 50mm 'B' class medium duty G.I. pipe conforming to IS 1239 including welding, fittings like belbows, tees, flanges, tapers, nuts, bolts, gaskets etc. and fixing the pipe on the wall/ceiling with subitable clamp/support frame and painting with two or more coats of synthyetic enamel paint of required shade complete as required : ( DSR 2832) |
| 13 | Providing, laying, testing & commissioning of 80mm 'B' class medium duty G.I. pipe conforming to IS 1239 including welding, fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with tow or more coats of synthyetic enamel paint of required shade complete as required: (DSR 2833) |
| 14 | Supplying & fixing PVC insulated PVC sheathed copper conductor submersible flat cable ISI Marked in existing metal/HDPE / PVC/ pipe/ in bore well/ in sump including fixing the cable to GI/HDPE pipe with suitable cable tags of followingsizes etc. as required.(A) 3 Core 2.5 Sq mm Flat Cable (DSR20.28.2) |
| 15 | (B) 3 Core 4 Sq mm Flat Cable (DSR20.28.3) |
| 16 | Repairing & Rewinding of storm water Pump Set. (Rewinding of motor, mechanical seal, top bearing, bottorm bearing, rubber parts, lubricant oil, cable seal, stamping repairing, rotor-re-balancing, nut bolts, labour charges, lowering and lifing, cartage, etc. complete as required.) |
| 17 | a) Upto 20 HP |
| 18 | a) Upto 40 HP |
| 19 | Rewinding after Dismantling of 3 phase , 415 Volt Induction Motor i/c supply & replacement of sutable ball bearing - 2 Nos. connection plate, baking varnishing , cartage to & fro, reassembling painting, fixing on the existing foundation, testing etc. complete as required. |
| 20 | a) Upto 40 HP |
| 21 | b) Upto 60 HP |
| 22 | Repairing after Dismantling of 3 phase , 415 Volt Induction Motor i/c (pump side) supply & replacement of sutable ball bearing - 2 Nos. connection plate, baking varnishing , cartage to & fro, reassembling painting, fixing on the existing foundation, testing etc. complete as required. |
| 23 | a) Upto 40 HP |
| 24 | b) Upto 60 HP |
| 25 | Supply of energy efficient Metallic body exhaust fan of 300 mm sweep RPM 1400, FHEHDSPDB120 Turbo Force 1P Grey to operate on single phase 230 volt, 50 HZ AC Supply with 4 Nos. Aerodynamically designed & Balanced Blade/impeller, copper winding with bird guard to protect the fan in running condition, arm-set, frame and all required accessories, Installing the exhaust fan in the existing opening, including making good the damage, connection, testing, commissioning etc. as required. |
| 26 | Supplying, installation, testing and commissioning of 5 HP (3.70 kW), 415 V, 50 Hz submersible pump set, including necessary accessories, fittings, cable connections, and all materials and labour required complete as required. |
| 27 | Supplying, installation, testing and commissioning of 7.5 HP (3.70 kW), 415 V, 50 Hz submersible pump set, including necessary accessories, fittings, cable connections, and all materials and labour required complete as required. Please Enable Macros to View BoQ information |