Tender for Modification work for providing fluidizing instrument air to all ESP hoppers with the supply and installation of required spares at Unit8-AHP.
Tender Overview
Project Description
A)Materials Shall Be Supplied As Per The Technical Specifications Mentioned In The Price Schedule.B)The Joint Inspection For The Supplied Materials Shall Be Carried Out After Receipt Of The Materials To Rtps/Kpcl Site.C)The Handing Over Of Materials At Kpcl Stores And Shifting Of Supplied Materials To Site Location Will Be Under The Scope Of Bidder/Agency Only.D)The Agency/Contractor Shall Commence His Work Immediately After Handing Over Of Work Front By Kpcl.E)The Work (Material Supply, Installation And Commissioning) Shall Be Completed On Or Before The Stipulated Contract Period Otherwise Penalty Will Be Imposed For The Delay Made.F)The Agency/Contractor Should Complete The Work As Per The Kpcl Requirement.G)The Required T&P And Ppe For Carrying Out Maintenance Works Shall Be Arranged By The Contractor/Agency Itself.F)It Is The Single Point Responsibility Of The Agency/Contractor To Provide Any Additional Accessories And Consumables Required For The Satisfactory Completion Of The Work.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender