|
| 1 | Repair work of Boat No. 1 of 12 Feet Size : All seat repair, bottom damaged 2.5 inches width & 1 inch thick gola change, new toolbox installation, 4 new handles, a rubber seal on the boat's inner and outer side, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. Paint, writing of office name, boat number on both sides of the boat. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 2 | Repair work of Boat No. 2 of 12 Feet Size: Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, all seat repair, thermacol change for buoyancy, new toolbox, bottom aluminium sheet change, repair, 6 handle change, engine base repair, bottom 2.5 inches width & 1 inch thick gola change, leakage proof, rubber sheet, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. Paint office name, and boat number on both sides of the boat. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 3 | Repair work of Boat No. 3 of 12 Feet Size: Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, boat engine base change, thermacol change for buoyancy, aluminium sheet change new toolbox, 15 feet wooden 2.5 inches width & 1 inch thick gola change, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. Colour and paint, solvent leakage, writing of office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 4 | Repair work of Boat No. 4 of 15 Feet Size: Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, Boat engine base change, thermacol change for buoyancy, aluminium sheet change, new toolbox, 15 feet wooden 2.5 inches width & 1 inch thick gola change, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. Colour and paint, solvent leakage, writing of office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 5 | Repair work of Boat No. 5 of 20 Feet Size: Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, Boat engine transom repair, aluminium sheet change, thermacol change for buoyancy, new toolbox, 25 feet wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. Colour and paint, solvent leakage, writing of office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 6 | Repair Work of Boat No. 6 of 18 Feet Size: Driver seat change, repair of all seats, 16 feet ply change, toolbox repair, 8 handle change, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. Painting, under and outside bottom of the boat, colour paint, solvent, writing office name and number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 7 | Repair work of Boat No. 7 of 18 Feet Size : All seat repairs of the boat, thermacol change for buoyancy, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 10 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 8 | Repair work of Boat No. 8 of 18 Feet Size: Transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 8 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 9 | Repair work of Boat No. 9 of 18 Feet Size: Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy, checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 8 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 10 | Repair work of Boat No. 10 of 18 Feet Size: Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy. checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 10 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 11 | Repair Work of Boat No. 11 of 20 Feet Size: Installing New Roof including of 1 x 1 inches Iron Pipe Frame with Polymer Guard PVC Cloth. Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy. checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 12 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 12 | Repair work of Boat No. 12 having Pedal Boat No. 1 : Boat roof repair and change of Polymer Guard PVC Cloth, welding work, pedal machine servicing, leakage, leak-proof, rubber seal on both sides, paint, writing office name and boat number on both sides. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 13 | Repair work of Boat No. 13 having Pedal Boat No. 2: Boat roof repair and change of Polymer Guard PVC Cloth, welding work, pedal machine servicing, leakage, leak-proof, rubber seal on both sides, paint, writing office name and boat number on both sides. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 14 | Repair work of Boat No. 14 having Pedal Boat No. 3: Boat roof repair and change of Polymer Guard PVC Cloth, welding work, pedal machine servicing, leakage, leak-proof, rubber seal on both sides, paint, writing office name and boat number on both sides. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 15 | Repair work of Boat No. 15 of 20 Feet Size : Fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, Boat roof repair and change of Polymer Guard PVC Cloth, welding work, transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy. checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 12 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 16 | Repair Work of Boat No. 16 of 25 Feet Size (Shikara Boat): - Roof repair damaged plywood change and change of Polymer Guard PVC Cloth, broken aluminium sheet change, all seat repair, fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy. checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 16 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 17 | Repair Work of Boat No. 17 of 27 Feet Size (Shikara Boat): Boat roof repair and change of Polymer Guard PVC Cloth. All glass window repair and servicing, Roof repair damaged plywood change, broken aluminium sheet change, all seat repair, fixing of wooden head on the nose end of the boat by removing of rivets from aluminium sheet changing the wooden packing by replacing new packing, transom repair and aluminium change, all seat repairs of the boat, thermacol change for buoyancy. checking of all existing rivets, screws and refixing the same with rivets and screws with use of leak proof compound where ever required. New toolbox, all damaged wooden 2.5 inches width & 1 inch thick gola outside of the bottom change, 16 handle change, colour and paint, leakage solvent in the outer and inner side of boat office name and boat number. All mentioned work will be done according to the necessary requirement of the Boat based on its condition & requirement. |
| 18 | Repair work of the Boat trolley No. 1 of 12 Feet Size : Welding Work, Iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All wooden gutka change. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 19 | Repair work of the Boat trolley No. 2 of 15 Feet Size: Welding work, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube change for both of the tyres and damaged Rim change of one tyre. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 20 | Repair work of the Boat trolley No. 3 of 15 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube change for both the tyres. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 21 | Repair work of the Boat trolley No. 4 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All wooden gutka change. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 22 | Repair work of the Boat trolley No. 5 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All wooden gutka change, all roller repairs, and Rim repair with nut bolt change. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 23 | Repair work of the Boat trolley No. 6 of 20 Feet Size :Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube change for both the tyres. All wooden gutka change. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 24 | Repair work of the Boat trolley No. 7 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All wooden gutka change and Rim repair with nut bolt change. Tyre tube change for one of the tyres. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 25 | Repair work of the Boat trolley No. 8 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube change for both the tyres. Damaged Rim Change for one tyre. All roller repair and one of the roller changes. All wooden gutka change. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 26 | Repair work of the Boat trolley No. 9 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube change for both the tyres. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 27 | Repair work of the Boat trolley No. 10 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube change for both the tyres. Damaged Rim Change for one tyre. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 28 | Repair work of the Boat trolley No. 11 of 18 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All roller repair with one roller changes and 6 wooden gutka change. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 29 | Repair work of the Boat trolley No. 12 of 12 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 30 | Repair work of the Boat trolley No. 13 of 12 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 31 | Repair work of the Boat trolley No. 14 of 12 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 32 | Repair work of the Boat trolley No. 15 of 12 Feet Size : Welding work of the trolley, iron channel overlapping, bearing change, greasing, all wooden blocks change as per their current size, Kamani’s repair, greasing & services. Tyre tube and tyre change for both the sides. 10 iron rollers replace with wooden gutka. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 33 | Repair work of the Boat trolley No. 16 of 12 Feet Size : Welding work of the trolley, change of damaged iron sheet with new iron sheet, repair & servicing of roller and bearing change of damaged roller. Tyre bearing change, greasing, Kamani’s repair, greasing & services. Change of old rope by new 40 feet stainless-steel rope of thickness-12 mm with hook and clamps, nut & bolts. Tyre tube change for all four tyres. Loading/Unloading machine servicing & repair. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 34 | Repair work of the Boat trolley No. 17 of 27 Feet Size : Welding work of the trolley, change of damaged iron sheet with new iron sheet repair & servicing of roller and bearing change of damaged roller. Tyre bearing change, greasing, Kamani’s repair, greasing & services. Change of old rope by new 40 feet stainless-steel rope of thickness-12 mm with hook and clamps, nut & bolts. Tyre tube change for two of the tyres. Loading/Unloading machine servicing & repair. All boat trolley painting and writing of the office name and number on both sides of the trolley. All mentioned work will be done according to the necessary requirement of the Boat trolley based on its condition & requirement. |
| 35 | Repair work of the Tohatsu OBM Engine of 50 HP (Engine No. 1) : Engine service, gear oil change, spark plug, engine tuning corroborator cleaning, fuel pump change, petrol tank cleaning, clip screw set change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 36 | Repair work of the Jhonson OBM Engine of 40 HP (Engine No. 2) : Engine servicing, gear oil change, spark plug change, engine tuning and corroborator cleaning, fuel pump change, petrol tank cleaning, clip screw set change, petrol lead change, little liver change, water pump change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 37 | Repair work of the Jhonson OBM Engine of 40 HP (Engine No. 3) : Propeller change, Engine servicing, gear oil and spark plug change, engine tuning, corroborator cleaning, petrol tank cleaning, head repair, gas kit set change, water pump set change, ring set change, and plug repair, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 38 | Repair work of the Yamaha OBM Engine of 30 HP (Engine No. 4) : Propeller change, Engine Servicing, gear oil change, spark plug change, engine tuning, corroborator cleaning, petrol tank cleaning, head repair, gas kit set change, water pump change, gas kit set change, coil change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 39 | Repair work of the Yamaha OBM Engine of 30 HP (Engine No. 5) : - Propeller change, Engine Servicing, gear oil change, spark plug change, engine tuning, corroborator cleaning, petrol tank cleaning, break gear oil seal change, petrol lead change, butter fly repair and water pump change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 40 | Repair work of the Yamaha OBM Engine of 30 HP (Engine No. 6) : - Engine Servicing, gear oil change, spark plug change, engine tuning, corroborator cleaning and petrol tank cleaning, ring piston change, gas kit set change, corroborator kit change, engine pin lock change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 41 | Repair work of the Yamaha OBM Engine of 25 HP (Engine No. 7) : - Engine overhaul (Ring Piston, necessary spare part) & Engine service, gear oil and spark plug change, engine tuning and corroborator cleaning, petrol tank cleaning, petrol lead chang. Fuel pump change, water pump change, corroborator change, necessary gaskets and bearing change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 42 | Repair work of the Yamaha OBM Engine of 25 HP (Engine No. 8) : - Engine Servicing, gear oil change, spark plug change, engine tuning and corroborator cleaning, new petrol tank purchase, water pump change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 43 | Repair work of the Yamaha OBM Engine of 25 HP (Engine No. 9): - Engine Servicing, gear oil change and spark plug change, engine tuning and corroborator cleaning and petrol tank cleaning, corroborator kit change, escalator grip change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 44 | Repair work of the Tohatsu OBM Engine of 25 HP (Engine No. 10): - Propeller change, Engine Servicing gear oil change and spark plug change, engine tuning and corroborator cleaning and petrol tank cleaning, butter fly repair, corroborator kit change, ratchet set and spring starter change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 45 | Repair work of the Tohatsu OBM Engine of 25 HP (Engine No. 11): Propeller change, Engine overhaul (Ring Piston, necessary spare part) & Engine service, gear oil and spark plug change, engine tuning and corroborator cleaning, petrol tank cleaning, petrol lead chang. Fuel pump change, water pump change, corroborator change, necessary gaskets and bearing change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 46 | Repair work of the Tohatsu OBM Engine of 25 HP (Engine No. 12): Propeller change, Engine Servicing gear oil and spark plug change, engine tuning and corroborator and petrol tank cleaning, ratchet set and spring starter change and petrol lead change, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. |
| 47 | Repair work of the Tohatsu OBM Engine of 50 HP (Engine No. 13):- Engine Servicing gear oil change and spark plug change, fuel pump change, and complete water pump change, engine tuning and corroborator and petrol tank cleaning, engine lock pin repair, fuel lead change. All mentioned work will be done according to the necessary requirement of the Boat OBM based on its condition & requirement. Please Enable Macros to View BoQ information |