|
| 1 | Sub Estimate - 1 ANNUAL SERVICE CONTRACT FOR VACUUM TYPE CHLORINATORS AT KESURDI, SATARA, WAI & KARAD AT WATER SUPPLY SCHEME FOR 2 YEARS |
| 2 | Annual Maintenance Of Vacuum Type Chlorinator 2Kg/Hr Provided At KARAD Water Treatment Plant |
| 3 | Annual Maintenance Of Vacuum Type Chlorinator 2Kg/Hr Provided At WAI Water Treatment Plant. |
| 4 | 1st Chlorinator Panel for 24 months |
| 5 | 2nd Chlorinator Panel (After 12 JobMonths Defect Liability) |
| 6 | Annual Maintenance Of Vacuum Type Chlorinator 5Kg/Hr Provided At SATARA Water Treatment Plant |
| 7 | Annual Maintenance Of Vacuum Type Chlorinator 5Kg/Hr Provided At KESURDI Water Treatment Plant For Post Chlorination |
| 8 | Annual Maintenance Of Vacuum Type Chlorinator 2Kg/Hr Provided At KESURDI Water Treatment Plant For Pre Chlorination |
| 9 | 1st Chlorinator Panel for 24 months |
| 10 | 2nd Chlorinator Panel (After 12 Months Defect Liability) |
| 11 | Sub Estimate - 2 SUPPLY REQUIRED SPARES PARTS FOR 2 Kg/Hr & 5Kg/Hr CHLORINATIONS PLANT AT WTP KESURDI, KARAD, WAI & SATARA INDUSTRIAL AREA FOR 2 YEARS (Ref - Agreement No B-2/19 for 2023-2024 under Kolhapur Division) |
| 12 | INLET VALVE ASSEMBLY |
| 13 | DIAPHRAGM ASSEMBLY |
| 14 | VACUUM REGULATOR ASSEMBLY |
| 15 | EJECTOR NOZZEL & THROUGHT ASSEBLY |
| 16 | EJECTOR CLAMP |
| 17 | FLOW METER WITH FLOAT ASSEMBLY |
| 18 | TOP BLOCK & BOTTOM BLOCK FOR FLOW METER |
| 19 | CONTROL VALVE ASSEMBLY |
| 20 | VACUUM GAUGE & CONNECTOR |
| 21 | WATER GAUGE |
| 22 | VACUUM TUBE |
| 23 | VACUUM ADOPTER WITH NUT |
| 24 | TONNER CONNECTING CLAMP WITH CLAMP CONNECTOR |
| 25 | LEAD WASHERS |
| 26 | OT SOLUTION 500ML |
| 27 | CHLORODISC 0.1 TO 5.0 PPM |
| 28 | Supply & Erecting Of Multistage Booster Pump Suitable To Develop Pressure 4 Kg Water Pressure or Pressure Required To Run Chlorinator With Wire& Starter.1 Working + 1 Stand By (AT KESURDI WTP) (For Post-Chlorination Unit) |
| 29 | Chlorine UPVC NRV Valve “1” Inch |
| 30 | Sub Estimate - 3 SUPPLYING, ERECTING & COMMISSIONING OF VACUUM TYPE CHLORINATOR 2KG/HR WITH WATER TESTING & SAFETY EQUIPMENTS AT WAI & KESURDI NODE. |
| 31 | Supply, Erecting, and Commissioning of Vacuum Type SMP-02 FLM (Floor Mounted) Gaseous Chlorinator Having Capacity of 2 Kg/Hr Designed With vacuum Regulator, control valve, to set required dosage flow meter assembly with Specified rates, Vacuum/Water pressure gauge to indicate line pressure, a gas filter to protect against foreign particles a ejector assembly with mixing chamber motive water and point of Application. (AT KESURDI WTP FOR PRE CHLORINATION STAND BY)Including – Transportation |
| 32 | At kesurdi WTP for pre chlorination stand by |
| 33 | At Wai WTP |
| 34 | Providing & Erecting UPVC Piping Schedule 80 Size“1” With Its Fittings, Ball Valve, Bends, Adhesive,Erecting Proper Clamping On Floor.(AT KESURDI WTP FOR PRE CHLORINATION)(AT WAI WTP) |
| 35 | At kesurdi |
| 36 | At Wai |
| 37 | Supply & Erecting Of Multistage Booster Pump Suitable To Develop Pressure 4 Kg Water Pressure or Pressure Required To Run Chlorinator With Wire & Starter.1 Working + 1 Stand By (AT KESURDI WTP) (For Pre-Chlorination Unit) |
| 38 | Chlorine Gas Leak Detector Wall Mounting Type With Sensor Range 0-10 PPM Resolution/Accuracy 0.1 ppm With electro chemical sensor type Led Display With Industrial Hooter. |
| 39 | At kesurdi Pre-Chlorinator |
| 40 | At Wai WTP |
| 41 | Chlorine Gas Mask With Canister (SATARA, WAI, KARAD KESURDI &KESURDI PRE) |
| 42 | CHLORINE SECONDARY VALVE SATARA, WAI, KARAD & KESURDI |
| 43 | Rebate of Chlorinator At Wai Please Enable Macros to View BoQ information |