| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth within a lead of 50m and 1.5m lift, excavated earth to be levelled and neatly dressed (All Kinds of Soil) |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, excavated earth to be levelled and neatly dressed (All Kinds of Soil) |
| 3 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: Note a): Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth (shrinkage @ 20% shall be deducted).Note: Deduct for not rolling with power roller of minimum 8 ton capacity for banking excavated earth in layers not exceedng 20 cm in depth and for not watering the excavated earth for banking. |
| 4 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 5 | supply of EC bags including carriage |
| 6 | Loading/Unloading sand/ earth filled bags in lorries/boats; lead upto 50m. |
| 7 | Unloading sand/earth filled bags from boats Placing in dry |
| 8 | Unloading sand/earth filled bags from boats and Placing in Water |
| 9 | Supplying and placing tarpulin sheets for plugging breaches or protecting embankments/ dykes during emergency situations |
| 10 | Providing and laying non-pressure NP2 class (light duty) RCC pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. Complete 600 mm dia RCC pipe including all carriages upto actual site of work. |
| 11 | Providing and engagement of Tractor including operator/driver charges on per hour basis including fuel charges (all incl) |
| 12 | Providing and engagement of Lorry/Tipper including operator/driver charges on per hour basis including fuel charges (all incl) |
| 13 | Enganement of JCB on hourly basis for emergent works in and around Wullar Lake including fuel, operator, mobilization and all incidental charges complete. |
| 14 | Engagement of unskilled labours for various emergent works. |
| 15 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. Please Enable Macros to View BoQ information |