| 1 | Carriage of followings from ESC. BSR to pit site on kachcha pakaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work. Distance about to 60 Km. |
| 2 | Carriage of PCC Pole 8.5 mtr. Long & PCC Pole 8.5 Mtr Long. |
| 3 | Carriage PCC Pole 11 mtr. Long. |
| 4 | Carriage of All line Material from store to Je Store Sub-Station as ACSR Weasel conductor ABC condutor GI wire, Earth wire, M.S Chanel, Angle, Stay & Earthing Rods, Barbed wire Disc Insulator etc. |
| 5 | Erection of Single Support including complete 1 LT Fittings as per RESPO Manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 6 | Grouting of Single Support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8=30x3030 cms. Including the cost of cement, sand, birck ballast/stone ballast etc. as per actual size requirement, as pr RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 7 | Laying, sagging, Stringing, binding and jumpering of ACSR Weasel conductor on the newly erected pole as permanual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 8 | Fixing of stay rod with stay wire in proper way with Nozelling. |
| 9 | Grouting of Stay rods. |
| 10 | Gaurding of 11 KV line at road crossing by laying 3 Nos. GI wire of size 6/10 SWG parallel and fixing of lacings (Tilli) at a distance at 1.5 mtr as per direction of supervising engineer/RESPO mannual it. Includes the cost of labour, T&P carrier etc required lor proper completing of work. |
| 11 | Resagging of loose and bad sag of L.T./H.T. line. |
| 12 | Chopping of Tree branches. |
| 13 | Tightening of Stay |
| 14 | Grouting of PCC/STP Pole old |
| 15 | Change of broken/Damaged/Missing following Items. |
| 16 | Disc Insulator |
| 17 | Nut & Bolt off size |
| 18 | Bended X-Arm/Angle/Channel |
| 19 | Alignment of PCC/STP Pole |
| 20 | Stay Clamp |
| 21 | D.P. Clamp |
| 22 | Stay insulator |
| 23 | Making of plinth of the damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the pole |
| 24 | The following material is required to be supplied by the contractor |
| 25 | Stay Clamp |
| 26 | Stay insulator |
| 27 | F Clamp |
| 28 | LT Clamp |
| 29 | LT Shackle Insulator |
| 30 | LT Insulator bolt 6 ench |
| 31 | Double pole clamp. |
| 32 | Holding Clamp |
| 33 | Nut & Bolt off size |
| 34 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |