| 1 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification as per SS 20B. |
| 2 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 3 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 4 | Brick work using country bricks of size 83/4\\"x41/4\\"x23/4\\" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. |
| 5 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. |
| 6 | Supplying and fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors, etc., complete complying with standard specification. |
| 7 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete complying with standard specifications |
| 8 | Plastering with Cement Mortar 1:3 (One cement and Three M.Sand), 10mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 9 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 11 | Supplying and painting two coats of new iron work such as steel doors ventilators, window bars etc., complete complying with standard specification. |
| 12 | Cost and Supply of steel door of size (0.90x2.10) including cost and conveyance of all charges etc., complete |
| 13 | Cost and Supply of RCC Jolley of size (0.45x0.45) including cost and conveyance of all charges etc., complete |
| 14 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated single core unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A FT switch with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed light point / fan point (for electronic regulator) |
| 15 | Supply and fixing of TNEB meter board suitable for 32A three phase service connection with 3 Nos. 32A fuse unit (500V) 32A neutral link and earth link (1\\" x 1/8\\" copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1\\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit |
| 16 | Supply, Delivery of Submersible Pumpset suitable for Bore Well conforming to I.S.Specification for the following duty conditions.10HP X100 LPMX 100 Three Phase |
| 17 | Supply, Delivery of Pannel Board with necessary fittingssuitable for Submersible Pumpset for the following duty conditions.For 10.00 Hp |
| 18 | Supply, Delivery of the following size of the flat PVC 3core Copper conducted cable conforming to I.S.694/90 suitable for submersible pumpset 4.00sqmm core flat copper cable |
| 19 | Labour charges for the erection of 10.00 HP submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps,pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc.,complete and testing the pumpset and trail run for 10 days |
| 20 | Supply, Delivery and fixing of MS Borewell cover using MS flat of 10mmx3mm and MS Sheet 12 gauge on top bolting arrangements for secuing the cap in position ( 8 “ Casing Pipes ) |
| 21 | Supply and Delivery of 63mm HDPE Pipe |
| 22 | Supply and Delivery of 50mm GI Flange set |
| 23 | Supply and Delivery of 50mm MS Clamp set |
| 24 | Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification |
| 25 | Supply and Delivery of 90mm PVC Bend 6kcs |
| 26 | Supply and Delivery of 90mm PVC Coupler |
| 27 | Supply and Delivery of 90mm End Cap |
| 28 | PVC Adhesive (Solution) |
| 29 | Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main line |
| 30 | Provision for Name Board |
| 31 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for this work} Please Enable Macros to View BoQ information |