| 1 | SITC of K4 Boom BarrierSupply, installation, testing and commissioning of Crash rated Boom Barrier with boom up to 4 meter with clear passege of 3 Mtr including civil and electric work, PLC based control panel, remote control, push button for local operation, set of IR sensor for Human safety and loop detector up to the entire satisfaction of the Engineer-In-Charge of the work as per the technical specifications and parameters listed below- |
| 2 | General DescriptionThe crash rated Boom barrier system at the entrence/exist should provide a secure and relible obstecle to vehicle traveling in both directions. In order to provide the desirable protection, the following perimeter security components shall be installed:- |
| 3 | Requisted set of K4 crash-rated Hydraulic based barrier . |
| 4 | Controller and logic circuits. |
| 5 | associated Accessories. |
| 6 | a) It should be duly crash-tested barriers under ASTM/DOS/PAS68/1WA 14:2013 std with less then or equal to 0.5 meters dynamic penetration. It should be efficient to with stand the front empect of the minimum 6.8 ton (or more) vehicle traveling at the speed of 48 mph (K4 rating )with less than of equal to 0.5 mtr dynamic penetration. A physical test report is to accompany the bid. |
| 7 | (b) The bidder should submit the physical crash test certificate issued by authorized premier testing agencies in the nameof OEM's for the respective model no. as quoted for (KARCO/TRL/MIRA/CTS) . Complete contect details of issuing agency to be given for indipendent validation. In case of imported product bidder, need to furnish a copy of Bill of Lading and certificate of origin. |
| 8 | Barrier HeightHeight of barriers should be minimum 950mm or as specified in the crash test certificate as measured from top of the foundation frame to the top ot the barrier . |
| 9 | Operating Temperature Barriers should operate under the extreme temperature from -20 degree to +65 degree centigrade. The control panel shall be supplied to control Barrier operation. |
| 10 | Operating pressurePressure in the oil pump should be adjustable between 30 to 120 Bars. |
| 11 | Manual Operation ModeThere must be provision for manual operation in case of power failure condition. |
| 12 | Automatic Operation ModeThere must be provisions for automatic operation mode through RFID or other access control system if required in future. |
| 13 | Duty Cycle & VoltageDuty cycle should be 100% and should operate on 420 VAC 3 Phase 50Hz |
| 14 | Construction materialHigh tensile carbon steel. |
| 15 | Rated impact energy673.9 Kill Joules |
| 16 | MTBFFive million cycles. |
| 17 | Protection ClassIP 68. |
| 18 | Material FinishRAL Epoxy coated. |
| 19 | Inherent safety features for safety against vehicles and human needs to be provided through photosensor and loop detectors. |
| 20 | Additionaol FeatureThe hydraulic power pack can be installed with in the main barriers body or separately as per the site requirement. |
| 21 | MakesSwara/Tescon. |
| 22 | Providing and fixing following rating and breaking capacity MCCB with thermomagnetic releases and terminal spreaders in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required. |
| 23 | 4 pole MCCB -63 Amps. |
| 24 | Providing & Laying of one number aluminium conductor, PVC insulated and PVC sheathed armoured/XLPE power cable , 1.1 KV grade of following sizes direct in ground including excavation and refilling the trench etc. as required, but excluding sand cushioning and protective covering. |
| 25 | Armoured Cable 10 sq. mm (Four core) |
| 26 | After Free/under warranty annual repair and maintenance for 1st Year and 2nd Year (Nil against warrenty |
| 27 | Maintenance Charges for 3rd Year @ 5% on capital cost |
| 28 | Maintenance Charges for 4th Year @ 5% on capital cost |
| 29 | Maintenance Charges for 5th Year @ 5% on capital cost Please Enable Macros to View BoQ information |