|
| 1 | IMPROVEMENT OF EXISTING EARTHERN ROAD TO BT ROAD OF KADAMBUR TO MAKKAMPALAYAM FOREST ROAD |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soild not exceeding 150mm in thickness as per Technical Specification Clause 201. |
| 3 | Medium Rock and Dense Meium Rock Requiring Blasting without Stacking - First Depth of 2 metre |
| 4 | Earth work excavation in all types of soils for the construction of roadway embankment to the required line, grade, slope and level as per drawings including stacking reusable materials and disposal of unwanted excavated material with a lead of 1 Km and all lift as per Technical Specification clause 301 of MORT&H specifications complete and as directed by Engineer FOR CUTTING |
| 5 | Earth work excavation in all types of soils for the construction of roadway embankment to the required line, grade, slope and level as per drawings including stacking reusable materials and disposal of unwanted excavated material with a lead of 1 Kms. and all lift as per Technical Specification clause 301 of MORT&H specifications complete and as directed by Engineer FOR FILLING UTILIZING THE CUT EARTH |
| 6 | Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V material |
| 7 | Providing and laying water bound macadamfor bottom layer grading II consisting of clean, crushed aggregates mechanically inter locked by rolling and binding together with screening binding material and finished in accordance with the requirements of the specification |
| 8 | Providing and laying water bound macadamfor bottom layer grading III consisting of clean, crushed aggregates mechanically inter locked by rolling and binding together with screening binding material and finished in accordance with the requirements of the specification |
| 9 | Providing and laying of Carted earth including cost and conveyance of the same to work site, including labour charges for laying and spreading, hire and fuel charges for all T&P employed etc., complete and as directed by the departmental engineers for making up low berms. |
| 10 | Providing compaction for berms using the box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers for making up of low berms (Compaction only) |
| 11 | ROAD FURNITURES |
| 12 | Supply and Fixing of KM Stone of standard design and Drawing as per IRC 8-1980 (Second Revision) incluidng painting and Numbering etc., and all other incidental charges etc.,complete |
| 13 | Supply and Fixing of HM stone of standard design and Drawing as per IRC 26-1967 a incluidng painting and Numbering etc., and all other incidental charges etc.,complete |
| 14 | GST Amount for ptoviding Service to Government Contract Works for the above works.(GST Amount is the Total GST Amount for total Overall quoted amount above this row in column \\"BB\\" for all works in this package) Please Enable Macros to View BoQ information |