| 1 | Removal of flow control system with other allied works installed at Delhi gate drainArrangement of all required safety equipment (i.e safety belts, folding ladders, safety helmets, safety shoes, masks, oxygen cylinder etc.) for safety of man power during execution of work |
| 2 | Making temporary platform for safety working inside the Drain for removing the spindles, coupler and gates and removing the same after completion of work. |
| 3 | Cleaning of sluice gates guide strips with the help of chemical solution, removing of all the dust / rusts etc. greasing the guide strips for free movements. |
| 4 | Removing of gear box & head stocks by cutting and opening of nut bolt etc. with the help of gas cutter/welding set, manual labour & long boom crane etc. |
| 5 | Cutting & removing of central coupler of spindles pin/nut bolt etc. inside the Drain with the help of making temporary arrangement of Jhula /temporary platform etc. as required |
| 6 | Cutting of lower coupler pins, nut bolts etc. with the help of gas cutter, welding set, manual labour & crane etc. as required inside the drain having gas & sewage flow. |
| 7 | Breaking the RCC block for sluice gate fully opened with the help of pneumatic hammer etc. inside the drain having sewage flow and foul gases. |
| 8 | Hiring of long boom crane to carry out all works safety. |
| 9 | Lighting arrangement at site of work for executing the work during electric material etc. as per site requirement, Including To & Fro Transportation Charges. Including 62 KVA DG Set. |
| 10 | Removing the all gates,spindle and allied parts outside/from the drain, gate structure with the help of mobile crane. The job include the provision of hanging the sluice gates from its position with the help of suitable size of SS/MS chain/crane etc. and placing the all gates from the gate structure i.e site to store/safe side place of delhi gate phase-I STP with the help of man, vehicle for transportation , crane etc as per site requirement. For removing of all Gates with allied works & placing the store/safe place of delhi gate phase-I if any other materials/job work required *& not includes in the estimate shall be scope of contractor. |
| 11 | Transportation, loading & unloading charges of men and material both side To & Fro. |
| 12 | Reinstallation of flow control system with other allied works installed at Delhi gate drainArrangement of all required safety equipment (i.e safety belts, folding ladders, safety helmets, safety shoes, masks, oxygen cylinder etc.) for safety of man power during execution of work |
| 13 | Making temporary platform for safety working inside the Drain for re-installation of the spindles, coupler and gates and removing the same after completion of work. |
| 14 | Cleaning of sluice gates guide strips with the help of chemical solution, removing of all the dust / rusts etc. greasing the guide strips for free movements. |
| 15 | Hiring of long boom crane to carry out all works safety. |
| 16 | Lighting arrangement at site of work for executing the work during electric material etc. as per site requirement, Including To & Fro Transportation Charges. Including 62 KVA DG Set. |
| 17 | Cutting the lower spindle upto appropriate size for opening of complete sluice gate upto the crown of the puddle/trunk sewer for free flow of raw sewage. Making the new threads for coupling the same and providing 2 Nos. nut bolts/pins and coupler of appropriate size. |
| 18 | Repairing of S.S. spindle i/c remetalling, turning, re-threading & polishing etc. as required. |
| 19 | Making & fixing the SS pin of required size for lower coupler at sluice gate with nut bolts and washer. The job includes the fixing of the same with sluice gates inside the sump. |
| 20 | Repairing of guide channels & strips etc. for smooth operation of gate with oiling & greasing the same. |
| 21 | Repair of gear box, providing & fixing of bush, nut spindle etc. for smooth operation of gear box & sluice gates. |
| 22 | Providing & fixing of thrust bearing. (2 Nos. each gear box). |
| 23 | Providing and fixing of MS bracket (2 Nos for each sluice gate) of required shape and size for smooth and in position proper movement of spindle of sluice gate |
| 24 | Making the RCC block for sluice gate fully opened with the help of pneumatic hammer etc. inside the drain having sewage flow and foul gases. |
| 25 | Painting the complete system with one coat of epoxy primer and two coats of enamel paint after cleaning the surface area. |
| 26 | Transportation, loading & unloading charges of men and material both side To & Fro. |
| 27 | Reassembling of sluice gates with both spindles, both couplers, coupler pins, gear box, head stock etc. on their positions, If any material/job work are required for execution of above said work must be provided by the firm and testing commissioning of the same for smooth operation and openings etc Please Enable Macros to View BoQ information |