| 1 | Appendix -A-Pre monsoon works. |
| 2 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area |
| 3 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. |
| 4 | 2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm |
| 5 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually |
| 6 | 10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side |
| 7 | OD64317/2026-2027:Engaging a professional wood cutter equipped with the necessary machinery, including allassociated expenses, to cut and remove trees / branches of a tree that are standing in a hazardouscondition. |
| 8 | OD64318/2026-2027:Engaging Labour for various works as per the direction of Engineer in charge |
| 9 | Appendix -B-Emergency works. |
| 10 | OD64319/2026-2027:Filling up potholes with bituminous ready mix compound (25 Kg bag) and compacting byramming to get a compact surface including cost of material, laying charges, transportation tosite etc. ( Rate is arrived for a bag of 25 kg) |
| 11 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. |
| 12 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually |
| 13 | 10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side |
| 14 | OD57306/2026-2027:Engaging small tipper for removing earth and other unusable materials from road, including fuel charges and other expenses etc. complete |
| 15 | OD57307/2026-2027:Engaging JCB for removal of raised berm, clearing of drains, other obstructions and minor landslides in the PWD road including fuel charges, bata for driver and all other expenditure etc. complete. Please Enable Macros to View BoQ information |