Bids Are Invited For Design, Supply, Erection, Testing And Commissioning (Dsetc) Of 50 M Self-Supporting Lattice Steel To - Supply Of 50M Tower Superstructure Material Including Fabrication, Galvanizing As Per Dd Specification Complete As Required.#, North District-Sikkim
TDR : 56167434
Tender Notice
BOQ
21 Days Left
North District
Sikkim
Bids Are invited for Design, Supply, Erection, Testing And Commissioning (Dsetc) Of 50 M Self-Supporting Lattice Steel To - Supply Of 50M Tower Superstructure Material Including Fabrication, Galvanizing As Per Dd Specification Complete As Required.#
Supply of 50M tower superstructure material including Fabrication, Galvanizing as per DD Specification complete as required.# Quantity in metric Ton (MT) offered to be mentioned by tenderer.
Supply of 50M tower superstructure material including Fabrication, Galvanizing as per DD Specification complete as required.# Quantity in metric Ton (MT) offered to be mentioned by tenderer.
2
ACCESSORIES
ACCESSORIES
3
Submission of working structural drawings of 50M tower (for foundation and tower structure) as per DD specification to:a) DDK Gangtok -1 setb) Zonal Office -1 Setc) DG: DD -1 Set
Submission of working structural drawings of 50M tower (for foundation and tower structure) as per DD specification to:a) DDK Gangtok -1 setb) Zonal Office -1 Setc) DG: DD -1 Set
4
Submission of certified inspection report for structural safety & firmness, verticality and all other design specifications by IITs, NITs or any of the recognized Govt. Institute(s) after erection of tower to Zonal ADG€
Submission of certified inspection report for structural safety & firmness, verticality and all other design specifications by IITs, NITs or any of the recognized Govt. Institute(s) after erection of tower to Zonal ADG€
5
Submission of certified Completion Report (soft & hard copies) including photographs showing complete tower as well as each section of 20 M length from base to top, horizontal cable tray and foundation processes – starting excavation, steel layout and reinforcements etc. to levelled finished foundation to:a) DDK Gangtok - 1 setb) Zonal office - 1 setc) DG:DD - 1 set
Submission of certified Completion Report (soft & hard copies) including photographs showing complete tower as well as each section of 20 M length from base to top, horizontal cable tray and foundation processes – starting excavation, steel layout and reinforcements etc. to levelled finished foundation to:a) DDK Gangtok - 1 setb) Zonal office - 1 setc) DG:DD - 1 set
6
Any other items required for the completeness of the system. Items wise details (including part No., if any) are to be given by the tenderer.
Any other items required for the completeness of the system. Items wise details (including part No., if any) are to be given by the tenderer.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.