Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; 11 Kv Line Shifting Work Under Edd- Kulpahar Mahoba - Supply Of Following Materials :- , Eye Hook , D
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; 11 Kv Line Shifting Work Under Edd- Kulpahar Mahoba - Supply Of Following Materials :- , Eye Hook , Dead & Cl , 11 Kv Kv 3X185 Sqmm Cable Jointing Kit Outdoortype As Per Resspo Manual. , Nut & Bolt Washer , 11 Kv Danger Board With Cl & Nut & Bolt , Stone Pad , Suspension Cl , Piercing Connector , Erection/Instalation/Fixing Of Following :- , Erection Of Eye Hook , Erection Dead & Cl , Filling Of 11 Kv Kv 3X185 Sqmm Cable Jointing Kit Outdoortype As Per Resspo Manual. , Erection Nut & Bolt Washer , Erection Of 11 Kv Danger Board With Cl & Nut & Bolt , Erection Of Stone Pad , Erection Of Suspension Cl , Erection Of Piercing Connector , Erection Of 11 Kv Composite Polymer Pin Insulator (Provided By The Dept.) , 11 Kv Disc Inslulator With Fitting (Provided By The Dept.) , Erection Of 11 Kv Polymer Disc Insulator (T&C) 45Kn (Provided By The Dept.) , Erection Of 11 Kv Cross Arm Cl (Provided By The Dept.) , Erection Of 11 Kv M/S Base Angle (Provided By The Dept.) , Erection Of Cross Arm V-Type 11 Kv (Provided By The Dept.) , Erection Of Dp Cl For Pcc Pole 8.5 Mtr. Long (Provided By The Dept.) , Erection Of F Cl For Pcc Pole 8.5 Mtr. Long (Provided By The Dept.) , Erection Of 11 Kv Dropper Channel 100X50x5x2028 (Provided By The Dept.) , Erection Of Top Channel 100X50x5x2240 (Provided By The Dept.) , Erection Of T-Off Channel 100X50x5x1300 Mm (Provided By The Dept.) , Erection Of Stay Complete (Provided By The Dept.) , Erection Of Earthing Complate (Provided By The Dept.) , Lt Cl For Pcc Pole 8.5 Mtr. (Provided By The Dept.) , Erection Of Gi Wire 10 Swg (Provided By The Dept.) , Erection Of Gi Wire 6 Swg (Provided By The Dept.) , Laying, Stringing Acsr Weasel Conductor (Provided By The Dept.) , Laying Of 11 Kv Cable Including Cost Of Sand & Bricks 3X185 Sqmm Xlpe Cable As Required As Per Respo Norms And Direction By Supervising Engineer. (Cable Provided By The Dept.) , Laying, Stringing, Binding And Termination Etc. Of Lt Ab Cable 3X50+1X35+1X16 Mm Sq. On The Newly Erected Line As Per Direction Of Supervising Engineer/Resspo Manual (A.B. Cable Provided By The Dept.) , Fixing Of Distribution Box 3 Phase With Cl Nut & Bolt (Provided By The Dept.) , Cartage & Erection Of St Pole 11 Mtr. Long (Provided By The Dept.) , Cartage & Erection Of Pcc Pole 8.5 Mtr. Long (Provided By The Dept.) , Resagging & Re-Erection Of Tilted Pole Of 0.8 Km Line , Tree Cutting , Concreting Of Support Stay Set. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Concreting Of Support Pcc/St Pole. Including The Cost Of Arrangement Of Labour & Required Material T&P Etc For Proper Completion Of Work. , Note: Any Quantity Of Item From Sl No. 1 To Sl No. 2.34 May Vary To Any Limit Within The Financial Value Of Agreement Against This Tender.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Supply of following materials :- | Supply of following materials :- |
| 2 | Eye Hook | Eye Hook |
| 3 | Dead & Clamp | Dead & Clamp |
| 4 | 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. | 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. |
| 5 | Nut & Bolt Washer | Nut & Bolt Washer |
| 6 | 11 KV Danger Board with Clamp & Nut & Bolt | 11 KV Danger Board with Clamp & Nut & Bolt |
| 7 | Stone Pad | Stone Pad |
| 8 | Suspension Clamp | Suspension Clamp |
| 9 | Piercing Connector | Piercing Connector |
| 10 | Erection/Instalation/Fixing of following :- | Erection/Instalation/Fixing of following :- |
| 11 | Erection of Eye Hook | Erection of Eye Hook |
| 12 | Erection Dead & Clamp | Erection Dead & Clamp |
| 13 | Filling of 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. | Filling of 11 KV KV 3X185 Sqmm Cable Jointing Kit OutdoorType as per RESSPO manual. |
| 14 | Erection Nut & Bolt Washer | Erection Nut & Bolt Washer |
| 15 | Erection of 11 KV Danger Board with Clamp & Nut & Bolt | Erection of 11 KV Danger Board with Clamp & Nut & Bolt |
| 16 | Erection of Stone Pad | Erection of Stone Pad |
| 17 | Erection of Suspension Clamp | Erection of Suspension Clamp |
| 18 | Erection of Piercing Connector | Erection of Piercing Connector |
| 19 | Erection of 11 KV Composite Polymer Pin Insulator (Provided by the Dept.) | Erection of 11 KV Composite Polymer Pin Insulator (Provided by the Dept.) |
| 20 | 11 KV Disc Inslulator with Fitting (Provided by the Dept.) | 11 KV Disc Inslulator with Fitting (Provided by the Dept.) |
| 21 | Erection of 11 KV Polymer Disc Insulator (T&C) 45KN (Provided by the Dept.) | Erection of 11 KV Polymer Disc Insulator (T&C) 45KN (Provided by the Dept.) |
| 22 | Erection of 11 KV Cross Arm Clamp (Provided by the Dept.) | Erection of 11 KV Cross Arm Clamp (Provided by the Dept.) |
| 23 | Erection of 11 KV M/S Base Angle (Provided by the Dept.) | Erection of 11 KV M/S Base Angle (Provided by the Dept.) |
| 24 | Erection of Cross Arm V-Type 11 KV (Provided by the Dept.) | Erection of Cross Arm V-Type 11 KV (Provided by the Dept.) |
| 25 | Erection of DP Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) | Erection of DP Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) |
| 26 | Erection of F Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) | Erection of F Clamp for PCC Pole 8.5 Mtr. Long (Provided by the Dept.) |
| 27 | Erection of 11 KV Dropper Channel 100X50X5X2028 (Provided by the Dept.) | Erection of 11 KV Dropper Channel 100X50X5X2028 (Provided by the Dept.) |
| 28 | Erection of Top Channel 100X50X5X2240 (Provided by the Dept.) | Erection of Top Channel 100X50X5X2240 (Provided by the Dept.) |
| 29 | Erection of T-Off Channel 100X50X5X1300 MM (Provided by the Dept.) | Erection of T-Off Channel 100X50X5X1300 MM (Provided by the Dept.) |
| 30 | Erection of Stay Complete (Provided by the Dept.) | Erection of Stay Complete (Provided by the Dept.) |
| 31 | Erection of Earthing Complate (Provided by the Dept.) | Erection of Earthing Complate (Provided by the Dept.) |
| 32 | LT Clamp for PCC Pole 8.5 Mtr. (Provided by the Dept.) | LT Clamp for PCC Pole 8.5 Mtr. (Provided by the Dept.) |
| 33 | Erection of GI Wire 10 SWG (Provided by the Dept.) | Erection of GI Wire 10 SWG (Provided by the Dept.) |
| 34 | Erection of GI Wire 6 SWG (Provided by the Dept.) | Erection of GI Wire 6 SWG (Provided by the Dept.) |
| 35 | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) | Laying, stringing ACSR Weasel Conductor (Provided by the Dept.) |
| 36 | Laying of 11 KV Cable including cost of Sand & Bricks 3x185 sqmm xlpe cable as required as per RESPO norms and direction by supervising Engineer. (Cable Provided by the Dept.) | Laying of 11 KV Cable including cost of Sand & Bricks 3x185 sqmm xlpe cable as required as per RESPO norms and direction by supervising Engineer. (Cable Provided by the Dept.) |
| 37 | Laying, stringing, binding and Termination etc. of LT AB Cable 3x50+1x35+1x16 mm sq. on the newly erected Line as per direction of supervising engineer/RESSPO manual (A.B. CABLE Provided by the Dept.) | Laying, stringing, binding and Termination etc. of LT AB Cable 3x50+1x35+1x16 mm sq. on the newly erected Line as per direction of supervising engineer/RESSPO manual (A.B. CABLE Provided by the Dept.) |
| 38 | Fixing of Distribution Box 3 Phase with Clamp Nut & Bolt (Provided by the Dept.) | Fixing of Distribution Box 3 Phase with Clamp Nut & Bolt (Provided by the Dept.) |
| 39 | Cartage & Erection of ST Pole 11 Mtr. Long (Provided by the Dept.) | Cartage & Erection of ST Pole 11 Mtr. Long (Provided by the Dept.) |
| 40 | Cartage & Erection of PCC Pole 8.5 Mtr. Long (Provided by the Dept.) | Cartage & Erection of PCC Pole 8.5 Mtr. Long (Provided by the Dept.) |
| 41 | Resagging & Re-Erection of Tilted Pole of 0.8 KM Line | Resagging & Re-Erection of Tilted Pole of 0.8 KM Line |
| 42 | Tree Cutting | Tree Cutting |
| 43 | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support Stay Set. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 44 | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. | Concreting of Support PCC/ST Pole. including the cost of arrangement of labour & required material T&P etc for proper completion of work. |
| 45 | Note: Any quantity of item from sl no. 1 to sl no. 2.34 may vary to any limit within the financial value of agreement against this tender. | Note: Any quantity of item from sl no. 1 to sl no. 2.34 may vary to any limit within the financial value of agreement against this tender. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender