Defence Government Departments Closing in 11 days TDR #56167240

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Talwar And Teg Class Ships; Rrc For Repair/ Maintenance Of Ac And Ref Plants Fitted Onboard Talwar And Teg Class Of Ships; Service Provider

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Jul 2026
11 days left
EMD
12.71 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Available
Quantity
Not Available

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Talwar And Teg Class Ships; Rrc For Repair/ Maintenance Of Ac And Ref Plants Fitted Onboard Talwar And Teg Class Of Ships; Service Provider - Sow For 5000 Hourly Routines On Ac Plant , Clean Sea Water Strainer Of Chilled Water Unit. , Check The Alignment Of Compressor And Motor, Undertake Alignment. , Check Compressor Coupling Plates Of Coupling. , Check Electrical Connections , Check Sensors And Calibration Replace If Defective , Replacement Of Shaft Seal If Leaking , Dismantling Of Condenser , Replace End Cover Gaskets Of Condenser , Chemical Cleaning Of Condenser , Sow For 30000 Hourly Routines On Ac Plant , Recover Refrigerant From System In To Cylinder , Draining Of Oil , Removal Of Connected Piping/ Instruments/ Wiring Etc. As Required , Decouple Of Compressor & Drive Motor , Assembling Of Lifting Devices , Removal Of Compressor Block & Motor From Base Frame To Top Deck , Cleaning Of Dismantled Parts , Inspection Of All Compressor & Motor Parts , Replacement Of Compressor & Motor Spares , Assembling Of New Parts In The Compressor & Motor , Opening Of Condenser End Cover , A) Inside Cleaning Of Tubes , E) Pressure Testing Of Condenser , Dismantling Of Evaporator , Clean The Path Of Water Side Of Evaporator , Replace End Cover Gaskets Of Evaporator , Blow Through Of Oil Cooler With N2 , Overhauling Of Ac System Valves, Replace If Defective , Check And Replace Control Devices , Check Starter & Drive Motor. , Renewal/ Replacement Of Filters- If Required , Connect Refrigerant Pipes , Identification Of Leak & Arresting Of The Same In Refrigerant Circuit , Replacement Of Compressor Motor Coupling , Check Pressure Relief Valve , Change Oil Filter , Clean Oil Strainer , Replace Liquid Strainer , Replace Suction Strainer , Replace Oil Heater , Replace Oil Level Switch , Check Electrical Connections , Replace All L S , Replace All Push Buttons , Replace All Relays , Replacement Of Solenoid Valve If Found Defective , Replace Pressure Indicator , Replace Differential Pressure Transducer , Replace Pressure Indicator , Replace Differential Pressure Transmitter , Replacement Of Temperature Transmitter , Replacement Of Pressure Transmitter , Carry Out Functionality Checks All The Safety Switches And Undertake Repairs/ Renewal As Required , Check Mccb, Replace If Found Defective , Check Overload, Replace If Found Defective , Check Current Transformer, Replace If Found Defective , Pressure Test Of Ac System With N2 , Vacuum Test , Charging Of Fresh Oil (Provided By Navy) , Charging Of Refrigerant (Provided By Navy) , Refit All Stop Valves, Double Seated Valves And Pressure Gauge Valves On Gas System. Renew All Teflon Seats Of Valves , Anticipated Sow For Ac Plants- Talwar/ Teg Class Ships , Replacing Shaft Seal Assembly , Overhauling Of Compressor - Replacement Of Journal, Screws And Thrust Bearing, Renewal Of All Lock Washers And O Rings , Checking Compressor Loading Unloading Mechanism And Resetting The Limit Switches , De-Gutting Compressor Loading Unloading Mechanism And Resetting The Limit Switches , Packing And Transportation Of Compressor From Nd Mb To M/S Jci Premises And Back , Shipping In To The Ship And Regutting Of Compressor , Checking And Aligning Compressor Motor Assembly , Condenser , Chemical Cleaning Of Condenser And Pressure Testing Or Pressure Testing Of Condenser For Identifying Refrigerant Leak Detection And Identification Followed By Blanking Of Defective Tubes And Pressure Testing Upto 22 Bar , Replacement Of Defective Condenser Tube (Per Tube) , Renewal Of Cover Flange Bolt (Per Bolt) , Evaporator , Cleaning In Position For Phe Followed By Pressure Testing Alongwith Provisioning Of Alpacon Descalant , Dismantling Of Phe Followed By Boxing Up Using New Set Of Gaskets , Caliberation Of Differential Pressure Gauge Across Phe , Instruments And Controls , Calibration Of The Pressure Switches, Checking For Proper Working, Resetting The Switches And Testing (Per Instrument) , Refurbishment Of Control Wiring For Each Pressure Switch / Solenoid Valve , Checking Of Solenoid Valve For Proper Working, Replacement Of Solenoid Coil And Testing , Calibration Of The Pressure Gauges And Fixing Of New Gauges If Found Defective (Gauges To Be Provided By The Ship) , Calibration Of The Temperature Gauges And Fixing Of New Gauges If Found Defective (Gauges To Be Provided By The Ship) , Di/Dr On Plc Alongwith Loading Of Program. , Calibration Of Automatic Loading Mechanism , Starter Panel And Lcp , Checking The Power And Control Connections, Cleaning Of Control Card,Snubber Card And Minor Parameterization Changes If Required , Replacement Of Mccb Or Replacement Of Soft Starter , Repair Of Soft Starter (Only Services) , Renewal Of Electrical And Control Cables From Starter And Control Panel To Consumers , Replacement Of Aux Contractor Or Mcb, Selector Switches, Push Buttons And Indication L S , Tightening Of Electrical Connections Of Starter Panel Or Local Control Panel , Mounts , Renew Sv Mounts , Foundation , Undertake Material Survey Of Ac Plant Foundation. Undertake Vibration Analysis And Performance Trials On Completion Of Dr And Installation. , Hourly Routines On Ref Plants- Talwar/ Teg Class Ships , 12K Hourly Routines/ Top Overhaul , Replace Compressor Seal , Check And Clean Compressor Suction Screen. , Change Pressure And Suction Valve Plates. , Check Adjustment Of All Thermostats, Pressure Switches. , 24K Hourly Routines , Change Bearings And Seals Of Compressor. , Check The Performance Of Compressor. , Carry Out Insulation Test Of Cold And Cool Rooms. , Overhaul Solenoid Valves Of The System. , Calibrate All Pressure And Temperature Switches, Indication L S And Replace If Necessary. , Clean Oil Separator , Change Suction And Discharge Plates. , Renew Contacts For Contactors. , Check Electrical Lines For Continuity And Renew If Necessary. , Check Evaporator For Cleanliness , Check Refrigeration System For Leakages And Undertake Mitigating Measures , Undertake Performance And Vibration Trials Of The Plant. , Aniticipated Sow For Ref Plants Onboard Talwar/ Teg Class Ships , Ref Plant , Mechanical Cleaning And Pressure Testing Of Sw Side Of Condenser , Carry Out Pressure Testing Of The As Assembled Condenser , Overhauling Of Gas System Isolating Valve , Refit All Isolating Valves Of Cooling Water System Renew All , Functionality Checks / Repair Of Pressure Relief Valve , Replacement Of Pressure Relief Valve , Replacement Of Neoprene O Rings , Replacement Of Gaskets , Top Overhaul Of Ref Compressor Including Bearing And Seal Replacement. , Repair/ Replacement Of Shaft Seal In Case Of Leakage Of Oil , Replace Unloader Cylinder Assembly , Repair Unloader Cylinder Assembly , Replace Oil Pressure Regulator , Replacement Of Crankcase Heater , Functionality Checks/ Calibration Of Solenoid Valve , Functionality Checks/ Calibration Of Expansion Valve , Carry Out Insulation Test Of Cool Room , Carry Out Insulation Test Of Cold Room , Chemical Cleaning Of Condensers , Chemical Cleaning Of Associated Refrigerant Pipes , Replacement Of Refrigerant Pipes , Replace The Crankshaft If Dia Reaches 54.50Mm , Replace The Piston Id Dia Exceeds 0.13Mm , Check The Clearance Between Connecting Rod Big End And Crank , Replace The Gudgeon Pin Bush If Clearance Increase Beyond 0.2Mm , Renew Sv Mounts , Blow Through By Nitrogen And Pressure Testing , Performance And Vibration Trials Of Ref Plants , Serviceability Checks Of Control Cum Starter Panel And Renew Defective Components , Service Charges (Including Travelling & Stay) For Deputation Of Service Engineers For Breakdown Maintenance On Ac & Ref Plant For Any Work Not Covered In Sow Will Be Levied As Per The Following- , Service Engineer , Supervisor , Technician , Unskilled Labour , Spares , Talwar Ac Spares , Shaf Seal Kit , O Ring Gasket Kit , Solenoid Valve On Liquid Pipeline , Bearing Cylinder Roller Poly , Bearing Cylinder Roller Poly , Thermostat Rt 11 , Auxiliary Switch , Air Contactor , Timing Relay , Freeze Protection Thermostat , Thermoregulaing Valve , Bearing Cylinder Roller Poly , Assembly Valve/Coil 120 , Temp Converter , Signal Isaolator 1 In 1 Out , Mcb 2 Pole C Curve 6 , Mcb 2 Pole C Curve 10 , Mcb 2 Pole C Curve 02 , Mcb 3 Pole C Curve 02 , Terminal Block 280519 , Terminal Block 20023201 , Terminal Fuse With Indication 281611281541 24V , Fuse Glass , Terminal Block 283901 , Thermister Relay , Relay 4Co 110V Ac , Power Contactor 115V Ac , Mcb 1 Pole C Curve, 4 , Insulation Supervision , Hmi Ktp400 , Motor Coupling Turbo Flexe , Talwar Ref Spares , Piston Set , Shut Off Valve , Thermostat , Schrader Connection , Shut Off Valve , Bearing Bush , Crank Shaft , Shaft Seal End Bearing , Valve Plate Complete , Oil Strainer 19 X 105 , Scuction Strainer , Gasket D 159A/4-2 Pass, D159x4 , Schrader Valve , Build In Oil Pump , Gasket D159u/4-2 Pass, D159x , Set Of Gaskets , Gland Set , Teg Ac Spares , Shaft Seal Kit , O Ring Gasket Kit , Solenoid Valve On Liquid Pipeline , Bearing Cylinder Roller Polly , Bearing Cylinder Roller Polly , Therm. Injection Valve , Assembly Valve/Coil 120 V Ac , Relay 24 Vdc , Thermist. Protect. Relay , Orifice Size 00 For Expansions Valve , Orifice Size 01 For Expansions Valve , Orifice Size 02 For Expansions Valve , Room Thermostat , Room Thermostat , Cpu 313C Central Assembly , Teg Ref Spares , Piston Set , Shut Off Valve , Thermostat , Schrador Connection , Shut Off Valve , Bearing Bush , Crank Shaft , Shaft Seal End Bearing , Valve Plate Complete , Oil Strainer 19X105 , Suction Strainer , Gasket D159a/4-2 Pass, D159x4 , Schrader Valve , Build In Oil Pump 502-2N , Gasket D159u/4-2 , Set Of Gaskets , Gland Set , Expansions Valve Tex2 , Expansions Valve Tx2

BOQ

Sl. No. Item TitleItem Description
1SOW for 5000 Hourly routines on AC PlantSOW for 5000 Hourly routines on AC Plant
2Clean sea water strainer of chilled water unit.Clean sea water strainer of chilled water unit.
3Check the alignment of compressor and motor, Undertake alignment.Check the alignment of compressor and motor, Undertake alignment.
4Check compressor coupling plates of coupling.Check compressor coupling plates of coupling.
5Check Electrical ConnectionsCheck Electrical Connections
6Check Sensors and calibration replace if defectiveCheck Sensors and calibration replace if defective
7Replacement of Shaft Seal if LeakingReplacement of Shaft Seal if Leaking
8Dismantling of CondenserDismantling of Condenser
9Replace End cover Gaskets of CondenserReplace End cover Gaskets of Condenser
10Chemical Cleaning of CondenserChemical Cleaning of Condenser
11SOW for 30000 Hourly routines on AC PlantSOW for 30000 Hourly routines on AC Plant
12Recover Refrigerant from System in to cylinderRecover Refrigerant from System in to cylinder
13Draining of OilDraining of Oil
14Removal of Connected piping/ Instruments/ Wiring etc. As requiredRemoval of Connected piping/ Instruments/ Wiring etc. As required
15Decouple of compressor & drive motorDecouple of compressor & drive motor
16Assembling of lifting devicesAssembling of lifting devices
17Removal of compressor block & Motor from base frame to top deckRemoval of compressor block & Motor from base frame to top deck
18Cleaning of dismantled partsCleaning of dismantled parts
19Inspection of all compressor & Motor PartsInspection of all compressor & Motor Parts
20Replacement of compressor & Motor sparesReplacement of compressor & Motor spares
21Assembling of new parts in the compressor & MotorAssembling of new parts in the compressor & Motor
22Opening of condenser end coverOpening of condenser end cover
23a) Inside Cleaning of tubesa) Inside Cleaning of tubes
24e) Pressure testing of condensere) Pressure testing of condenser
25Dismantling of EvaporatorDismantling of Evaporator
26Clean the path of water side of EvaporatorClean the path of water side of Evaporator
27Replace end cover Gaskets of EvaporatorReplace end cover Gaskets of Evaporator
28Blow through of Oil Cooler with N2Blow through of Oil Cooler with N2
29Overhauling of AC system valves, replace if defectiveOverhauling of AC system valves, replace if defective
30Check and replace control devicesCheck and replace control devices
31Check starter & drive motor.Check starter & drive motor.
32Renewal/ replacement of filters- if requiredRenewal/ replacement of filters- if required
33Connect refrigerant pipesConnect refrigerant pipes
34Identification of leak & arresting of the same in refrigerant circuitIdentification of leak & arresting of the same in refrigerant circuit
35Replacement of Compressor Motor CouplingReplacement of Compressor Motor Coupling
36Check Pressure relief valveCheck Pressure relief valve
37Change Oil filterChange Oil filter
38Clean Oil StrainerClean Oil Strainer
39Replace Liquid StrainerReplace Liquid Strainer
40Replace Suction strainerReplace Suction strainer
41Replace Oil HeaterReplace Oil Heater
42Replace Oil Level SwitchReplace Oil Level Switch
43Check Electrical ConnectionsCheck Electrical Connections
44Replace all LampsReplace all Lamps
45Replace all Push buttonsReplace all Push buttons
46Replace all RelaysReplace all Relays
47Replacement of solenoid Valve if found defectiveReplacement of solenoid Valve if found defective
48Replace Pressure IndicatorReplace Pressure Indicator
49Replace Differential Pressure TransducerReplace Differential Pressure Transducer
50Replace Pressure IndicatorReplace Pressure Indicator
51Replace Differential Pressure TransmitterReplace Differential Pressure Transmitter
52Replacement of Temperature TransmitterReplacement of Temperature Transmitter
53Replacement of Pressure TransmitterReplacement of Pressure Transmitter
54Carry out functionality checks all the safety switches and undertake repairs/ renewal as requiredCarry out functionality checks all the safety switches and undertake repairs/ renewal as required
55Check MCCB, replace if found defectiveCheck MCCB, replace if found defective
56Check overload, replace if found defectiveCheck overload, replace if found defective
57Check current transformer, replace if found defectiveCheck current transformer, replace if found defective
58Pressure Test of AC system with N2Pressure Test of AC system with N2
59Vacuum testVacuum test
60Charging of Fresh Oil (Provided by Navy)Charging of Fresh Oil (Provided by Navy)
61Charging of Refrigerant (Provided by Navy)Charging of Refrigerant (Provided by Navy)
62Refit all stop valves, double seated valves and pressure gauge valves on gas system. Renew all Teflon Seats of ValvesRefit all stop valves, double seated valves and pressure gauge valves on gas system. Renew all Teflon Seats of Valves
63Anticipated SOW for AC Plants- Talwar/ Teg Class shipsAnticipated SOW for AC Plants- Talwar/ Teg Class ships
64Replacing shaft seal assemblyReplacing shaft seal assembly
65Overhauling of compressor - replacement of journal, screws and thrust bearing, renewal of all lock washers and 'o' ringsOverhauling of compressor - replacement of journal, screws and thrust bearing, renewal of all lock washers and 'o' rings
66Checking compressor loading unloading mechanism and resetting the limit switchesChecking compressor loading unloading mechanism and resetting the limit switches
67De-gutting compressor loading unloading mechanism and resetting the limit switchesDe-gutting compressor loading unloading mechanism and resetting the limit switches
68Packing and transportation of compressor from ND MB to M/s JCI Premises and backPacking and transportation of compressor from ND MB to M/s JCI Premises and back
69Shipping in to the ship and regutting of compressorShipping in to the ship and regutting of compressor
70Checking and aligning compressor motor assemblyChecking and aligning compressor motor assembly
71CondenserCondenser
72Chemical cleaning of condenser and pressure testing or pressure testing of condenser for identifying refrigerant leak detection and identification followed by blanking of defective tubes and Pressure Testing upto 22 barChemical cleaning of condenser and pressure testing or pressure testing of condenser for identifying refrigerant leak detection and identification followed by blanking of defective tubes and Pressure Testing upto 22 bar
73Replacement of defective condenser tube (per tube)Replacement of defective condenser tube (per tube)
74Renewal of cover flange bolt (per bolt)Renewal of cover flange bolt (per bolt)
75EvaporatorEvaporator
76Cleaning in Position for PHE followed by Pressure Testing alongwith provisioning of Alpacon DescalantCleaning in Position for PHE followed by Pressure Testing alongwith provisioning of Alpacon Descalant
77Dismantling of PHE followed by boxing up using new set of gasketsDismantling of PHE followed by boxing up using new set of gaskets
78Caliberation of Differential Pressure Gauge across PHECaliberation of Differential Pressure Gauge across PHE
79Instruments and ControlsInstruments and Controls
80Calibration of the pressure switches, checking for proper working, resetting the switches and testing (per instrument)Calibration of the pressure switches, checking for proper working, resetting the switches and testing (per instrument)
81Refurbishment of control wiring for each pressure switch / solenoid valveRefurbishment of control wiring for each pressure switch / solenoid valve
82Checking of solenoid valve for proper working, replacement of solenoid coil and testingChecking of solenoid valve for proper working, replacement of solenoid coil and testing
83Calibration of the pressure gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)Calibration of the pressure gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)
84Calibration of the Temperature gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)Calibration of the Temperature gauges and fixing of new gauges if found defective (Gauges to be provided by the ship)
85DI/DR on PLC alongwith loading of program.DI/DR on PLC alongwith loading of program.
86Calibration of Automatic Loading MechanismCalibration of Automatic Loading Mechanism
87Starter panel and LCPStarter panel and LCP
88Checking the power and control connections, cleaning of control card,snubber card and minor parameterization changes if requiredChecking the power and control connections, cleaning of control card,snubber card and minor parameterization changes if required
89Replacement of MCCB or replacement of soft starterReplacement of MCCB or replacement of soft starter
90Repair of soft starter (only services)Repair of soft starter (only services)
91Renewal of Electrical and Control Cables from Starter and Control Panel to consumersRenewal of Electrical and Control Cables from Starter and Control Panel to consumers
92Replacement of aux contractor or MCB, selector switches, push buttons and indication lampsReplacement of aux contractor or MCB, selector switches, push buttons and indication lamps
93Tightening of electrical connections of starter panel or local control panelTightening of electrical connections of starter panel or local control panel
94MountsMounts
95Renew SV mountsRenew SV mounts
96FoundationFoundation
97Undertake material survey of AC plant foundation. Undertake vibration analysis and performance trials on completion of DR and installation.Undertake material survey of AC plant foundation. Undertake vibration analysis and performance trials on completion of DR and installation.
98Hourly routines on Ref Plants- Talwar/ Teg Class ShipsHourly routines on Ref Plants- Talwar/ Teg Class Ships
9912K Hourly Routines/ Top Overhaul12K Hourly Routines/ Top Overhaul
100Replace compressor sealReplace compressor seal
101Check and Clean compressor suction screen.Check and Clean compressor suction screen.
102Change Pressure and Suction Valve Plates.Change Pressure and Suction Valve Plates.
103Check adjustment of all thermostats, pressure switches.Check adjustment of all thermostats, pressure switches.
10424K Hourly Routines24K Hourly Routines
105Change bearings and seals of compressor.Change bearings and seals of compressor.
106Check the performance of compressor.Check the performance of compressor.
107Carry out insulation test of cold and cool rooms.Carry out insulation test of cold and cool rooms.
108Overhaul Solenoid valves of the system.Overhaul Solenoid valves of the system.
109Calibrate all pressure and temperature switches, Indication lamps and replace if necessary.Calibrate all pressure and temperature switches, Indication lamps and replace if necessary.
110Clean Oil SeparatorClean Oil Separator
111Change suction and discharge plates.Change suction and discharge plates.
112Renew contacts for contactors.Renew contacts for contactors.
113Check electrical lines for continuity and renew if necessary.Check electrical lines for continuity and renew if necessary.
114Check evaporator for cleanlinessCheck evaporator for cleanliness
115Check refrigeration system for leakages and undertake mitigating measuresCheck refrigeration system for leakages and undertake mitigating measures
116Undertake performance and vibration trials of the plant.Undertake performance and vibration trials of the plant.
117Aniticipated SOW for Ref Plants onboard Talwar/ Teg Class ShipsAniticipated SOW for Ref Plants onboard Talwar/ Teg Class Ships
118Ref PlantRef Plant
119Mechanical cleaning and pressure testing of SW side of CondenserMechanical cleaning and pressure testing of SW side of Condenser
120Carry out Pressure testing of the as assembled condenserCarry out Pressure testing of the as assembled condenser
121Overhauling of gas system isolating valveOverhauling of gas system isolating valve
122Refit all isolating valves of cooling water system renew allRefit all isolating valves of cooling water system renew all
123Functionality checks / repair of pressure relief valveFunctionality checks / repair of pressure relief valve
124Replacement of pressure relief valveReplacement of pressure relief valve
125Replacement of Neoprene 'o' ringsReplacement of Neoprene 'o' rings
126Replacement of GasketsReplacement of Gaskets
127Top Overhaul of Ref compressor including bearing and seal replacement.Top Overhaul of Ref compressor including bearing and seal replacement.
128Repair/ Replacement of shaft seal in case of leakage of oilRepair/ Replacement of shaft seal in case of leakage of oil
129Replace unloader cylinder assemblyReplace unloader cylinder assembly
130Repair unloader cylinder assemblyRepair unloader cylinder assembly
131Replace oil pressure regulatorReplace oil pressure regulator
132Replacement of crankcase heaterReplacement of crankcase heater
133Functionality checks/ calibration of solenoid valveFunctionality checks/ calibration of solenoid valve
134Functionality checks/ calibration of expansion valveFunctionality checks/ calibration of expansion valve
135Carry out insulation test of cool roomCarry out insulation test of cool room
136Carry out insulation test of cold roomCarry out insulation test of cold room
137Chemical cleaning of condensersChemical cleaning of condensers
138Chemical Cleaning of associated refrigerant pipesChemical Cleaning of associated refrigerant pipes
139Replacement of refrigerant pipesReplacement of refrigerant pipes
140Replace the crankshaft if dia reaches 54.50mmReplace the crankshaft if dia reaches 54.50mm
141Replace the piston id dia exceeds 0.13mmReplace the piston id dia exceeds 0.13mm
142Check the clearance between connecting rod big end and crankCheck the clearance between connecting rod big end and crank
143Replace the gudgeon pin bush if clearance increase beyond 0.2mmReplace the gudgeon pin bush if clearance increase beyond 0.2mm
144Renew SV mountsRenew SV mounts
145Blow through by Nitrogen and Pressure testingBlow through by Nitrogen and Pressure testing
146Performance and Vibration trials of ref plantsPerformance and Vibration trials of ref plants
147Serviceability checks of control cum starter panel and renew defective componentsServiceability checks of control cum starter panel and renew defective components
148Service Charges (including travelling & stay) for deputation of Service Engineers for breakdown maintenance on AC & REF Plant for any work not covered in SOW will be levied as per the following-Service Charges (including travelling & stay) for deputation of Service Engineers for breakdown maintenance on AC & REF Plant for any work not covered in SOW will be levied as per the following-
149Service EngineerService Engineer
150SupervisorSupervisor
151TechnicianTechnician
152Unskilled LabourUnskilled Labour
153SPARESSPARES
154TALWAR AC SPARESTALWAR AC SPARES
155Shaf Seal KitShaf Seal Kit
156O Ring Gasket KitO Ring Gasket Kit
157SOLENOID VALVE ON LIQUID PIPELINESOLENOID VALVE ON LIQUID PIPELINE
158BEARING CYLINDER ROLLER POLYBEARING CYLINDER ROLLER POLY
159BEARING CYLINDER ROLLER POLYBEARING CYLINDER ROLLER POLY
160THERMOSTAT RT 11THERMOSTAT RT 11
161AUXILIARY SWITCHAUXILIARY SWITCH
162AIR CONTACTORAIR CONTACTOR
163TIMING RELAYTIMING RELAY
164FREEZE PROTECTION THERMOSTATFREEZE PROTECTION THERMOSTAT
165THERMOREGULAING VALVETHERMOREGULAING VALVE
166BEARING CYLINDER ROLLER POLYBEARING CYLINDER ROLLER POLY
167ASSEMBLY VALVE/COIL 120ASSEMBLY VALVE/COIL 120
168TEMP CONVERTERTEMP CONVERTER
169SIGNAL ISAOLATOR 1 IN 1 OUTSIGNAL ISAOLATOR 1 IN 1 OUT
170MCB 2 POLE C CURVE 6 AMPMCB 2 POLE C CURVE 6 AMP
171MCB 2 POLE C CURVE 10 AMPMCB 2 POLE C CURVE 10 AMP
172MCB 2 POLE C CURVE 02 AMPMCB 2 POLE C CURVE 02 AMP
173MCB 3 POLE C CURVE 02 AMPMCB 3 POLE C CURVE 02 AMP
174TERMINAL BLOCK 280519TERMINAL BLOCK 280519
175TERMINAL BLOCK 20023201TERMINAL BLOCK 20023201
176TERMINAL FUSE WITH INDICATION 281611281541 24VTERMINAL FUSE WITH INDICATION 281611281541 24V
177FUSE GLASSFUSE GLASS
178TERMINAL BLOCK 283901TERMINAL BLOCK 283901
179THERMISTER RELAYTHERMISTER RELAY
180RELAY 4CO 110V ACRELAY 4CO 110V AC
181POWER CONTACTOR 115V ACPOWER CONTACTOR 115V AC
182MCB 1 POLE C CURVE, 4 AMPMCB 1 POLE C CURVE, 4 AMP
183INSULATION SUPERVISIONINSULATION SUPERVISION
184HMI KTP400HMI KTP400
185MOTOR COUPLING TURBO FLEXEMOTOR COUPLING TURBO FLEXE
186TALWAR REF SPARESTALWAR REF SPARES
187PISTON SETPISTON SET
188SHUT OFF VALVESHUT OFF VALVE
189THERMOSTATTHERMOSTAT
190SCHRADER CONNECTIONSCHRADER CONNECTION
191SHUT OFF VALVESHUT OFF VALVE
192BEARING BUSHBEARING BUSH
193CRANK SHAFTCRANK SHAFT
194SHAFT SEAL END BEARINGSHAFT SEAL END BEARING
195VALVE PLATE COMPLETEVALVE PLATE COMPLETE
196OIL STRAINER 19 X 105OIL STRAINER 19 X 105
197SCUCTION STRAINERSCUCTION STRAINER
198GASKET D 159A/4-2 PASS, D159X4GASKET D 159A/4-2 PASS, D159X4
199SCHRADER VALVESCHRADER VALVE
200BUILD IN OIL PUMPBUILD IN OIL PUMP
201GASKET D159U/4-2 PASS, D159XGASKET D159U/4-2 PASS, D159X
202SET OF GASKETSSET OF GASKETS
203GLAND SETGLAND SET
204TEG AC SPARESTEG AC SPARES
205SHAFT SEAL KITSHAFT SEAL KIT
206O RING GASKET KITO RING GASKET KIT
207SOLENOID VALVE ON LIQUID PIPELINESOLENOID VALVE ON LIQUID PIPELINE
208BEARING CYLINDER ROLLER POLLYBEARING CYLINDER ROLLER POLLY
209BEARING CYLINDER ROLLER POLLYBEARING CYLINDER ROLLER POLLY
210THERM. INJECTION VALVETHERM. INJECTION VALVE
211ASSEMBLY VALVE/COIL 120 V ACASSEMBLY VALVE/COIL 120 V AC
212RELAY 24 VDCRELAY 24 VDC
213THERMIST. PROTECT. RELAYTHERMIST. PROTECT. RELAY
214ORIFICE SIZE 00 FOR EXPANSIONS VALVEORIFICE SIZE 00 FOR EXPANSIONS VALVE
215ORIFICE SIZE 01 FOR EXPANSIONS VALVEORIFICE SIZE 01 FOR EXPANSIONS VALVE
216ORIFICE SIZE 02 FOR EXPANSIONS VALVEORIFICE SIZE 02 FOR EXPANSIONS VALVE
217ROOM THERMOSTATROOM THERMOSTAT
218ROOM THERMOSTATROOM THERMOSTAT
219CPU 313C CENTRAL ASSEMBLYCPU 313C CENTRAL ASSEMBLY
220TEG REF SPARESTEG REF SPARES
221PISTON SETPISTON SET
222SHUT OFF VALVESHUT OFF VALVE
223THERMOSTATTHERMOSTAT
224SCHRADOR CONNECTIONSCHRADOR CONNECTION
225SHUT OFF VALVESHUT OFF VALVE
226BEARING BUSHBEARING BUSH
227CRANK SHAFTCRANK SHAFT
228SHAFT SEAL END BEARINGSHAFT SEAL END BEARING
229VALVE PLATE COMPLETEVALVE PLATE COMPLETE
230OIL STRAINER 19X105OIL STRAINER 19X105
231SUCTION STRAINERSUCTION STRAINER
232GASKET D159A/4-2 PASS, D159X4GASKET D159A/4-2 PASS, D159X4
233SCHRADER VALVESCHRADER VALVE
234BUILD IN OIL PUMP 502-2NBUILD IN OIL PUMP 502-2N
235GASKET D159U/4-2GASKET D159U/4-2
236SET OF GASKETSSET OF GASKETS
237GLAND SETGLAND SET
238EXPANSIONS VALVE TEX2EXPANSIONS VALVE TEX2
239EXPANSIONS VALVE TX2EXPANSIONS VALVE TX2

AI Tender Summary

OUR REF NO 56167240
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 16-07-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Talwar And Teg Class Ships; Rrc For Repair/ Maintenance Of Ac And Ref Plants Fitted Onboard Talwar And Teg Class Of Ships; Service Provider - Sow For 5000 Hourly Routines On Ac Plant , Clean Sea Water Strainer Of Chilled Water Unit. , Check The Alignment Of Compressor And Motor, Undertake Alignment. , Check Compressor Coupling Plates Of Coupling. , Check Electrical Connections , Check Sensors And Calibration Replace If Defective , Replacement Of Shaft Seal If Leaking , Dismantling Of Condenser , Replace End Cover Gaskets Of Condenser , Chemical Cleaning Of Condenser , Sow For 30000 Hourly Routines On Ac Plant , Recover Refrigerant From System In To Cylinder , Draining Of Oil , Removal Of Connected Piping/ Instruments/ Wiring Etc. As Required , Decouple Of Compressor & Drive Motor , Assembling Of Lifting Devices , Removal Of Compressor Block & Motor From Base Frame To Top Deck , Cleaning Of Dismantled Parts , Inspection Of All Compressor & Motor Parts , Replacement Of Compressor & Motor Spares , Assembling Of New Parts In The Compressor & Motor , Opening Of Condenser End Cover , A) Inside Cleaning Of Tubes , E) Pressure Testing Of Condenser , Dismantling Of Evaporator , Clean The Path Of Water Side Of Evaporator , Replace End Cover Gaskets Of Evaporator , Blow Through Of Oil Cooler With N2 , Overhauling Of Ac System Valves, Replace If Defective , Check And Replace Control Devices , Check Starter & Drive Motor. , Renewal/ Replacement Of Filters- If Required , Connect Refrigerant Pipes , Identification Of Leak & Arresting Of The Same In Refrigerant Circuit , Replacement Of Compressor Motor Coupling , Check Pressure Relief Valve , Change Oil Filter , Clean Oil Strainer , Replace Liquid Strainer , Replace Suction Strainer , Replace Oil Heater , Replace Oil Level Switch , Check Electrical Connections , Replace All L S , Replace All Push Buttons , Replace All Relays , Replacement Of Solenoid Valve If Found Defective , Replace Pressure Indicator , Replace Differential Pressure Transducer , Replace Pressure Indicator , Replace Differential Pressure Transmitter , Replacement Of Temperature Transmitter , Replacement Of Pressure Transmitter , Carry Out Functionality Checks All The Safety Switches And Undertake Repairs/ Renewal As Required , Check Mccb, Replace If Found Defective , Check Overload, Replace If Found Defective , Check Current Transformer, Replace If Found Defective , Pressure Test Of Ac System With N2 , Vacuum Test , Charging Of Fresh Oil (Provided By Navy) , Charging Of Refrigerant (Provided By Navy) , Refit All Stop Valves, Double Seated Valves And Pressure Gauge Valves On Gas System. Renew All Teflon Seats Of Valves , Anticipated Sow For Ac Plants- Talwar/ Teg Class Ships , Replacing Shaft Seal Assembly , Overhauling Of Compressor - Replacement Of Journal, Screws And Thrust Bearing, Renewal Of All Lock Washers And O Rings , Checking Compressor Loading Unloading Mechanism And Resetting The Limit Switches , De-Gutting Compressor Loading Unloading Mechanism And Resetting The Limit Switches , Packing And Transportation Of Compressor From Nd Mb To M/S Jci Premises And Back , Shipping In To The Ship And Regutting Of Compressor , Checking And Aligning Compressor Motor Assembly , Condenser , Chemical Cleaning Of Condenser And Pressure Testing Or Pressure Testing Of Condenser For Identifying Refrigerant Leak Detection And Identification Followed By Blanking Of Defective Tubes And Pressure Testing Upto 22 Bar , Replacement Of Defective Condenser Tube (Per Tube) , Renewal Of Cover Flange Bolt (Per Bolt) , Evaporator , Cleaning In Position For Phe Followed By Pressure Testing Alongwith Provisioning Of Alpacon Descalant , Dismantling Of Phe Followed By Boxing Up Using New Set Of Gaskets , Caliberation Of Differential Pressure Gauge Across Phe , Instruments And Controls , Calibration Of The Pressure Switches, Checking For Proper Working, Resetting The Switches And Testing (Per Instrument) , Refurbishment Of Control Wiring For Each Pressure Switch / Solenoid Valve , Checking Of Solenoid Valve For Proper Working, Replacement Of Solenoid Coil And Testing , Calibration Of The Pressure Gauges And Fixing Of New Gauges If Found Defective (Gauges To Be Provided By The Ship) , Calibration Of The Temperature Gauges And Fixing Of New Gauges If Found Defective (Gauges To Be Provided By The Ship) , Di/Dr On Plc Alongwith Loading Of Program. , Calibration Of Automatic Loading Mechanism , Starter Panel And Lcp , Checking The Power And Control Connections, Cleaning Of Control Card,Snubber Card And Minor Parameterization Changes If Required , Replacement Of Mccb Or Replacement Of Soft Starter , Repair Of Soft Starter (Only Services) , Renewal Of Electrical And Control Cables From Starter And Control Panel To Consumers , Replacement Of Aux Contractor Or Mcb, Selector Switches, Push Buttons And Indication L S , Tightening Of Electrical Connections Of Starter Panel Or Local Control Panel , Mounts , Renew Sv Mounts , Foundation , Undertake Material Survey Of Ac Plant Foundation. Undertake Vibration Analysis And Performance Trials On Completion Of Dr And Installation. , Hourly Routines On Ref Plants- Talwar/ Teg Class Ships , 12K Hourly Routines/ Top Overhaul , Replace Compressor Seal , Check And Clean Compressor Suction Screen. , Change Pressure And Suction Valve Plates. , Check Adjustment Of All Thermostats, Pressure Switches. , 24K Hourly Routines , Change Bearings And Seals Of Compressor. , Check The Performance Of Compressor. , Carry Out Insulation Test Of Cold And Cool Rooms. , Overhaul Solenoid Valves Of The System. , Calibrate All Pressure And Temperature Switches, Indication L S And Replace If Necessary. , Clean Oil Separator , Change Suction And Discharge Plates. , Renew Contacts For Contactors. , Check Electrical Lines For Continuity And Renew If Necessary. , Check Evaporator For Cleanliness , Check Refrigeration System For Leakages And Undertake Mitigating Measures , Undertake Performance And Vibration Trials Of The Plant. , Aniticipated Sow For Ref Plants Onboard Talwar/ Teg Class Ships , Ref Plant , Mechanical Cleaning And Pressure Testing Of Sw Side Of Condenser , Carry Out Pressure Testing Of The As Assembled Condenser , Overhauling Of Gas System Isolating Valve , Refit All Isolating Valves Of Cooling Water System Renew All , Functionality Checks / Repair Of Pressure Relief Valve , Replacement Of Pressure Relief Valve , Replacement Of Neoprene O Rings , Replacement Of Gaskets , Top Overhaul Of Ref Compressor Including Bearing And Seal Replacement. , Repair/ Replacement Of Shaft Seal In Case Of Leakage Of Oil , Replace Unloader Cylinder Assembly , Repair Unloader Cylinder Assembly , Replace Oil Pressure Regulator , Replacement Of Crankcase Heater , Functionality Checks/ Calibration Of Solenoid Valve , Functionality Checks/ Calibration Of Expansion Valve , Carry Out Insulation Test Of Cool Room , Carry Out Insulation Test Of Cold Room , Chemical Cleaning Of Condensers , Chemical Cleaning Of Associated Refrigerant Pipes , Replacement Of Refrigerant Pipes , Replace The Crankshaft If Dia Reaches 54.50Mm , Replace The Piston Id Dia Exceeds 0.13Mm , Check The Clearance Between Connecting Rod Big End And Crank , Replace The Gudgeon Pin Bush If Clearance Increase Beyond 0.2Mm , Renew Sv Mounts , Blow Through By Nitrogen And Pressure Testing , Performance And Vibration Trials Of Ref Plants , Serviceability Checks Of Control Cum Starter Panel And Renew Defective Components , Service Charges (Including Travelling & Stay) For Deputation Of Service Engineers For Breakdown Maintenance On Ac & Ref Plant For Any Work Not Covered In Sow Will Be Levied As Per The Following- , Service Engineer , Supervisor , Technician , Unskilled Labour , Spares , Talwar Ac Spares , Shaf Seal Kit , O Ring Gasket Kit , Solenoid Valve On Liquid Pipeline , Bearing Cylinder Roller Poly , Bearing Cylinder Roller Poly , Thermostat Rt 11 , Auxiliary Switch , Air Contactor , Timing Relay , Freeze Protection Thermostat , Thermoregulaing Valve , Bearing Cylinder Roller Poly , Assembly Valve/Coil 120 , Temp Converter , Signal Isaolator 1 In 1 Out , Mcb 2 Pole C Curve 6 , Mcb 2 Pole C Curve 10 , Mcb 2 Pole C Curve 02 , Mcb 3 Pole C Curve 02 , Terminal Block 280519 , Terminal Block 20023201 , Terminal Fuse With Indication 281611281541 24V , Fuse Glass , Terminal Block 283901 , Thermister Relay , Relay 4Co 110V Ac , Power Contactor 115V Ac , Mcb 1 Pole C Curve, 4 , Insulation Supervision , Hmi Ktp400 , Motor Coupling Turbo Flexe , Talwar Ref Spares , Piston Set , Shut Off Valve , Thermostat , Schrader Connection , Shut Off Valve , Bearing Bush , Crank Shaft , Shaft Seal End Bearing , Valve Plate Complete , Oil Strainer 19 X 105 , Scuction Strainer , Gasket D 159A/4-2 Pass, D159x4 , Schrader Valve , Build In Oil Pump , Gasket D159u/4-2 Pass, D159x , Set Of Gaskets , Gland Set , Teg Ac Spares , Shaft Seal Kit , O Ring Gasket Kit , Solenoid Valve On Liquid Pipeline , Bearing Cylinder Roller Polly , Bearing Cylinder Roller Polly , Therm. Injection Valve , Assembly Valve/Coil 120 V Ac , Relay 24 Vdc , Thermist. Protect. Relay , Orifice Size 00 For Expansions Valve , Orifice Size 01 For Expansions Valve , Orifice Size 02 For Expansions Valve , Room Thermostat , Room Thermostat , Cpu 313C Central Assembly , Teg Ref Spares , Piston Set , Shut Off Valve , Thermostat , Schrador Connection , Shut Off Valve , Bearing Bush , Crank Shaft , Shaft Seal End Bearing , Valve Plate Complete , Oil Strainer 19X105 , Suction Strainer , Gasket D159a/4-2 Pass, D159x4 , Schrader Valve , Build In Oil Pump 502-2N , Gasket D159u/4-2 , Set Of Gaskets , Gland Set , Expansions Valve Tex2 , Expansions Valve Tx2
Basic Detail
Tender No GEM/2026/B/7496640
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 25 Jun 2026
Submission Date 16 Jul 2026
Open Date 16 Jul 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 12.71 Lakhs
Exemption Available
Document List
6fc234b3-2d81-447c-9835-c5ac73729c8c.pdf
1777715170.xlsx
1777715181.pdf
1777715183.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 25, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 16, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Jul 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
pdf

6fc234b3-2d81-447c-9835-c5ac73729c8c.pdf

xlsx

1777715170.xlsx

pdf

1777715181.pdf

pdf

1777715183.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders