| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. |
| 2 | All kinds of soil |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 4 | All kinds of soil. |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 6 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. |
| 7 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
| 8 | Beyond 30 cm girth up to and including 60 cm girth |
| 9 | Beyond 60 cm girth up to and including 120 cm girth |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 11 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 12 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 13 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : |
| 14 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form work for : |
| 16 | Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.. |
| 17 | Providing, hoisting and fixing up to floor five level precast reinforced cement concrete in small lintels not exceeding 1.5m clear span up to floor five level, including the cost of required centering, shuttering but, excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone- III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources ). |
| 18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 19 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 20 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 21 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 22 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 23 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with : |
| 24 | Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 25 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 26 | 12 mm cement plaster of mix : |
| 27 | 1:6 (1 cement: 6 fine sand) |
| 28 | 15 mm cement plaster on the rough side of single or half brick wall of mix : |
| 29 | 1:6 (1 cement: 6 fine sand) |
| 30 | 20 mm cement plaster of mix : |
| 31 | 1:6 (1 cement: 6 fine sand) |
| 32 | 6 mm cement plaster of mix : |
| 33 | 1:3 (1 cement: 3 fine sand) |
| 34 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 35 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) |
| 36 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : |
| 37 | Two or more coats on new work. |
| 38 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.. |
| 39 | In cement mortar |
| 40 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 41 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 42 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 43 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: |
| 44 | Asbestos cement sheet |
| 45 | Refixing of available G.I. chain link fabric fencing made of G.I. wire along with poles with required nuts and bolts etc. complete as per the direction of Engineer-in-charge. |
| 46 | Mechanical transportation of G.I. chain link fabric fencing made of G.I. wire of 18 sqm comprising ,Chain link fabric fencing, Structural steel Tubes , MS angles, flats, plates, pipes nuts and bolts etc., of varying sizes and lengths from ITPC OU to BSNL Stores Padmarao Nagar . The entire lot of tower members shall be transported in a single lot . The Job includes cost of labour involved in collection of all members, lifting with required lead, loading into truck and unloading and stacking of all the members at the desired location and at site of work complete etc., as directed by the Engineer-in-charge upto a distance of 20km. |
| 47 | Dismantling of unserviceable Rolling shutter if size 2.4x 3.6 m and stacking in position as directed by Engineer in charge Please Enable Macros to View BoQ information |