|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | All kinds of soil. |
| 3 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. |
| 4 | Ordinary rock |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 6 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Centering and shuttering including strutting, propping etc. in all floor heights and removal of form for |
| 8 | Foundations, footings, bases of columns, etc. for mass concrete |
| 9 | Steel work in welded in built up section/framed work, including cutting, hoisting, fixing in posititon and applying a priming coat of approved steel primer using structral steel etc. as required |
| 10 | In gratings, frames, guard bar, ladder, railings , brackets, gates and similar works |
| 11 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. |
| 12 | With G.I. barbed wire |
| 13 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : |
| 15 | Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 16 | Supply installation testing and commssionig of 24 W LED post top lantern including wiring connection from nearest supply etc. complete Please Enable Macros to View BoQ information |