Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Institute; Basket Ball Court Construction Work; Na , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Institute; Int, Chamoli-Uttarakhand
TDR : 56165613
Tender Notice
BOQ
10 Days Left
Chamoli
Uttarakhand
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Institute; Basket Ball Court Construction Work; Na , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Institute; Int
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin-Charge.With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin-Charge.With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30
2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4
Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing. 1 : 1.5:3 ( 1 Cement: 1 % coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources
Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing. 1 : 1.5:3 ( 1 Cement: 1 % coarse sand(zone-111) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.