| 1 | Dismantling of old interlocking tiles pavement including stacking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge. |
| 2 | Scrapping of the maxpalt bitumen road etc. all complete. |
| 3 | Cartage of silt, sludge kankar and other disposable organic material etc. all complete with labor T&P including cartage of 8 km. |
| 4 | Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering, finishing and but excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retarder for setting of concrete/improve workability without impairing strength and durability as per direction of engineer-in-charge. Note- cement concrete considered in this item is @ 330kg/cum. Excess or less cement used as per design mix is payable or recoverable separately up to plinth level. |
| 6 | R.C.C. work with cement approved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 for slab work excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials labor and tools and plants etc. required for proper completion of the work. Strength of the concrete shall not be less than M-150. |
| 7 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). |
| 8 | Supply and mixing 3.5 kg and or as specified by the manufacturer hardener in tremix concrete per sqm. |
| 9 | M-150 Brick work in 1:4 with Cement and coarse sand including supply of all material, labor T & P etc. required for proper completion of work. |
| 10 | 12MM Thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not including 80mm in girth and finished even and smooth. No extra for missing any additive. 1 cement : 4 Coarse Sand. |
| 11 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) aggregate (20 mm nominal size) and cutting complete including cost of form work. In foundation and floors. |
| 12 | R.C.C. precast Slab 900mm x 450mm having thickness (150mm with 10mm dia) reinforcement double cage and having two lifting handles. |
| 13 | Supply and fixing of R.C.C. slab as per direction of engineer-in-charge etc. all complete. |
| 14 | Supply and fixing of black granite stone board and approved standard matter with brick work, plaster & paint etc. all complete. |
| 15 | Sub Total (A) |
| 16 | Add / Deduction For Estimate Figure Amount Match |
| 17 | Grand Total Please Enable Macros to View BoQ information |