| 1 | SCHEDULE ‘A’ PART-I(BUILDING & STRUCTURE WORKS)Details of prepriced schedule is given in tender documents. |
| 2 | SCHEDULE \\"A\\" PART-II (EXCAVATION, EARTHWORK, SITE CLEARANCE & SITE DEVELOPMENT) Details of prepriced Schedule is given in tender documents. |
| 3 | SCHEDULE \\"A\\" PART-III (INTERNAL WATER SUPPLY)Details of prepriced Schedule is given in tender documents. |
| 4 | SCHEDULE \\"A\\" PART-IV (INTERNAL ELECTRIC SUPPLY) Details of prepriced Schedule is given in tender documents. |
| 5 | SCHEDULE \\"A\\" PART-V (EXTERNAL WATER SUPPLY )Details of prepriced Schedule is given in tender documents. |
| 6 | SCHEDULE \\"A\\" PART-VI (EXTERNAL ELECTRIC SUPPLY) Details of prepriced Schedule is given in tender documents. |
| 7 | SCHEDULE \\"A\\" PART-VII (SEWAGE DISPOSAL)Details of prepriced Schedule is given in tender documents. |
| 8 | SCHEDULE \\"A\\" PART-VIII( ROAD/PATH)Details of prepriced Schedule is given in tender documents. |
| 9 | SCHEDULE \\"A\\" PART-IX (SECURITY WALL, FENCING & GATE)Details of prepriced Schedule is given in tender documents. |
| 10 | SCHEDULE \\"A\\" PART-X ( RETAINING WALL) Details of prepriced Schedule is given in tender documents. |
| 11 | SCHEDULE \\"A\\" PART -XI (MISCELLANEOUS B&R AND E&M ITEMS) Note:- This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col.' E ' signifies this fact only. |
| 12 | EXTERNAL WATER SUPPLYS&F Water flow Meter 40mm dia flanged type confirming to ISI including and jointing material complete with rubber gasket, bolts and nuts etc complete all as specified and directed. |
| 13 | M&L for construction of valve chamber of size 900mm x 900mm x 900mm dimensions (over all internal dimension) for sluice valve etc, with PCC foundation, PCC block masonry walls, plastering, PCC coping, white washing, mild steel chamber cover, painting to chamber cover including excavation and earth work in any type of soil complete all as specified below :-Valve Chamber shall be provided with the following specifications :-(i) Cement concrete for foundation (1:4:8) type D2 using 40mm graded stone aggregates 150mm thick extended upto 150mm beyond the outer face of block masonry.(ii) Walls of valve chamber 200 mm thick with precast cement concrete (1:3:6) using 20mm graded stone aggregates solid building blocks, setting in Cm 1:6 complete.(iii) Internal and exposed surfaces of valve chamber both concrete and block masonry surface shall be plastered with CM (1:4) 15mm thick finished even and smooth.(iv) 50mm thick coping PCC 1:3:6 type C1 over block masonary wall.(v) Entire plastered surfaces shall be treated with 3 coats of white wash(vi) Chamber cover shall be of 3mm thick MS sheet with 30x 30x 5mm size angle iron frame with hold fast and locking arrangement, steel surface shall be painted two coats of synthetic paint of first quality over one coat of red oxide primer. |
| 14 | EXTERNAL ELECTRIC SUPPLYSupply and fix GI braket pipe of size 32mm dia medium grade 1.2 mtr long bend to shape hot or cold suitable for street light and making the one end of GI pipe bracket suitable for fixing of any type street light and shall be fixed on pole complete all as specified and directed |
| 15 | Supply and fixing of Hot Press Moulded SMC (Sheet Moulding Compound) Junction Box of inside dimension 250 mm x 200 mm x 105 mm including four Nos Aluminium Stud / terminal of suitable size and one Nos MCB SP 06 Amps mounted on DIN rail and fixed on pole with clamps, bolts & nuts including neccessary electric connection upto st light with 1.5sqmm pvc wire complete all as specified and as directed. |
| 16 | Supply and install testing and commissioning factory made, floor mounted outdoor type LT panel board ,cubical type suitable for 415 V 3Ph 4 wire 50 Hz AC supply system and tested from CPRI, having 100 Amps capacity aluminium bus bar for phase and 50 Amps aluminium bus bar capacity for neutral, colour coded for each phase and neutral, insulated on epoxy type insulation. The bottom of the outer shell contains a detachable plate having provn for entry of cable of adequate size with glands, The panel shall be dust and vermin proof, IP-66 class protection and made 3.15 mm thick CRCA MS sheet, powder coated finish on outside surface and painted inside with two coats of red oxide primer, both side opening type, provision of connection earth strip from 2 sides, including internal wiring with PVC insulated solid copper conductor wire, IS-694 marked, 1100 volts grade of appropriate size(but not less than 1.5 sqmm) including grounding of panel 45 cm above ground level by providing 90 cm long angle iron frame of size 40x40x6 mm, welded on all the four corners, embedded in PCC 1:2:4 using 20 mm stone aggregate upto 30 cm above ground level complete all as specified and directed including the following accessories:-(a) MCCB 4 Pole, 415 V, fixed type, 40 Amps with breaking capacity 16 kA (I/C) (b) MCB 4 Pole, 415 V, fixed type, 20 Amps with breaking capacity 10 kA (out going) (c) MCB 2 Pole, 220 V, fixed type, 20 Amps with breaking capacity 10 kA (out going)(d ) Digital function meter for showing volt, amps and frequency(e) Complete set of CTs & Indicating lamp Red,Yellow, Blue-01 set(f) Complete power and panel cabling/wiring - 1 Job |
| 17 | SEWAGE DISPOSALM & L for laying of DWCPE sewage pipes line 150 mm dia bore pipe sftiffness class SN 8 including sealimg of joints fittings etc complete with collers complete all as spcified and directed |
| 18 | S & F on site LLDPE septic tank, conventional type including media designed to carry sewage and sludge water excavating in any type soil, PCC 1:3:6 below foundation. Vent shaft, connection etc complete for effective depth of 1.5m and overall depth of 4 m, for 05 user complete all as specified and as directed. |
| 19 | SECURITY WALL, FENCING AND GATE/ RETAINING WALLDesign, manufacture, supply and laying of factory-made in wet cast method of Precast L-Shape Boundary wall of clear vertical height 2700mm above GL. Design to be confirming to BIS/JIS and manufactured in wet-cast method with high performance self-compacting concrete M-40 cylindrical strength/M-50 Grade cube strength and Fe 550D reinforcement. The product should be manufactured in water tight with automobile steel moulds and duly steam cured for accelerated curing. The product must consist special in-built hanging brackets at appropriate locations in top and bottom for faster and safe mechanical installation of the product and must have provision of anchorage at foundation. The dimensiional tolerance is to be of +5mm. Surface finish should be without honeycombing and smooth enough to resist any seepage and moisture effect. All as per site specific instructions of manufacturer and as directed. Note:(i) Detailed literature of manufacturer in compliance of specified manufacturing facilities will be submitted by contractor for approval. Manufacturer shall be got approved before placing order.(ii) BOO will visit the manufacturing facilities of factory & recommend approval.(iii) The design of wall shall be carried out by the manufacturer as per BIS/ JIS and prevailing practice and vetted by IIT/NIT. Design will be approved by CE (CG) Goa before manufacturing. (iv) Rate shall be inclusive of 0-20 mm levelling mortor in cm 1:6 above PCC in foundation as per site requirement. Please Enable Macros to View BoQ information |
| 20 | SECURITY WALL, FENCING AND GATE/ RETAINING WALLDesign, manufacture, supply and laying of factory-made in wet cast method of Precast L-Shape Boundary wall of clear vertical height 2700mm above GL. Design to be confirming to BIS/JIS and manufactured in wet-cast method with high performance self-compacting concrete M-40 cylindrical strength/M-50 Grade cube strength and Fe 550D reinforcement. The product should be manufactured in water tight with automobile steel moulds and duly steam cured for accelerated curing. The product must consist special in-built hanging brackets at appropriate locations in top and bottom for faster and safe mechanical installation of the product and must have provision of anchorage at foundation. The dimensiional tolerance is to be of +5mm. Surface finish should be without honeycombing and smooth enough to resist any seepage and moisture effect. All as per site specific instructions of manufacturer and as directed. Note:(i) Detailed literature of manufacturer in compliance of specified manufacturing facilities will be submitted by contractor for approval. Manufacturer shall be got approved before placing order.(ii) BOO will visit the manufacturing facilities of factory & recommend approval.(iii) The design of wall shall be carried out by the manufacturer as per BIS/ JIS and prevailing practice and vetted by IIT/NIT. Design will be approved by CE (CG) Goa before manufacturing. (iv) Rate shall be inclusive of 0-20 mm levelling mortor in cm 1:6 above PCC in foundation as per site requirement. Please Enable Macros to View BoQ information |