| 1 | Repairing of MS Base frame, Foundation with allied works Pump set no. 1 at Kanti Nagar BPS. Disconnecting of all electrical connections and decoupling the motor from the pump and pump from suction and delivery line by using gas cutter set and manual heavy labor etc. As required. |
| 2 | Pumping out of water by springs tidal, or river seepage broken water main or drain and the like 14.23. |
| 3 | Dismantling the pump and motor from the base frame by cutting and removing of all the rusted MS nut bolts by gas cutter and electric welding set and manual heavy labor as per site requirement and lifting of pump and motor on ground with the help of crane/tripod and manual heavy labor etc. as required. |
| 4 | Removing of worn out MS base frame from RCC by cutting foundation bolts with the help of gas cutter and electric welding set and lifting it out by heavy manual labor to ground level and shifting it to safer side as per instruction of engineer in charge. |
| 5 | Breaking of damaged RCC foundation by pneumatic power chisel and electric compressor machine this includes removing the broken material from pump house and disposing the same as suitable place as per instruction of engineer in charge. |
| 6 | Repairing by Providing and laying in position cement concrete 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump set etc. including MS jall by providing ms bars for strengthening of foundation and including providing and fixing of minimum 6 nos. Foundation bolts etc. as required. |
| 7 | Providing of heavy duty MS base frame suitable for Pump set made out of heavy duty MS channel and MS plate of approximate suitable size as per existing base frame. |
| 8 | Supply of Neoprene Rubber Packing. Make: Jyoti/National. |
| 9 | Supply of MS nut bolts washers etc. |
| 10 | Fixing of MS base frame on the RCC foundation the job include proper leveling and alignment. |
| 11 | Fabrication of coupling guard made out from MS sheet and angle etc. as per existing for safety purpose in pumping station. |
| 12 | Making proper bore with key of the tyre coupling and fixing charge of coupling etc. As required. |
| 13 | Repairing of pump shaft, sleeve and replace of stud etc. as required. |
| 14 | Replacement of pressure gauge with copper tube etc. as required. |
| 15 | Installation of the pump and Motor on the common base frame including couple the pump and motor, jointing the pump with suction/delivery line with proper alignment taking all safety precaution arrangement all tools and tackles. |
| 16 | Replacement of fibre glass copper lead of motor as per sample. |
| 17 | Making electrical connection of Motor, starter/panel with the help of necessary safety precautions at site. |
| 18 | Testing and commissioning the E&M equipment pump and motor at NO load and Full load. Please Enable Macros to View BoQ information |