Earth work in excavation of foundation in all kinds of soil within initial lead and lift including rough dressing braking clods and levelling the bed etc. complete as per the direction of EIC.
2
Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC.
3
C.C.( 1:3:6) using 4Cm size C.B.H.G. metal including cost, carriage,royalty hire chargesof mixture machine & taxes etc. complete(No hand mixing hire chargesof mixture machine & taxes etc. complete(No hand mixing allowed) as per the direction of the Engineer-in-charge.
4
R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering,cost, carriage, royalty & taxes etc. complete as per the direction of EIC.
5
C.C.M 20 using 12 mm size H.G. chips including centering,shuttering, cost, carriage, royalty & taxes etc. complete as per the direction of EIC.
6
Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete.
7
Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (WALL)
8
Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (SLAB)
9
Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC.
10
Add for Tranparancy & Taking Photograph ……..… Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.