| 1 | Dismantlling and removing cement concrete including stacking the useful materials for reuse and removing the debries within 50m lead as per direction of E.I.C. |
| 2 | Earth work in excavation of foundation in all kinds of soil within initial lead and lift including rough dressing braking clods and levelling the bed etc. complete as per the direction of EIC. |
| 3 | Lifting excavated earth from work side upto 5km lead by mechanical means etc. as per the direction of EIC |
| 4 | Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC. |
| 5 | C.C.( 1:3:6) using 4Cm size C.B.H.G. metal including cost, carriage,royalty hire chargesof mixture machine & taxes etc. complete(No hand mixing hire chargesof mixture machine & taxes etc. complete(No hand mixing allowed) as per the direction of the Engineer-in-charge. |
| 6 | R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering,cost, carriage, royalty & taxes etc. complete as per the direction of EIC. |
| 7 | Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete. |
| 8 | C.C.M 20 using 12 mm size H.G. chips including centering,shuttering, cost, carriage, royalty & taxes etc. complete as per the direction of EIC. |
| 9 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (Foundation & Plinth) |
| 10 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (P. slab) |
| 11 | Supplying,fitting,fixing of MS door,window & grill including cost,carriage,materials,labour and all taxes etc all complete. |
| 12 | Wall painting with plastic emulsion paint for two coat with any approved paint over a coat of primer finished smooth and even shade to received painting including cost,scafolding,staiging with cost of all materials,taxes,labour,T & P etc all complete as per direction of EIC. |
| 13 | Painting 2 coats over a coat of primer on new steel work including labour,cost,carriage etc. all complete. |
| 14 | Finishing wall with two coats of approved weather coat over a coat of primer finished smoothand even shade to received painting including cost,scafolding, staiging with cost of all materials,taxes,labour,T & P etc all complete as per direction of EIC. |
| 15 | Add for Tranparancy & Taking Photograph ……..… Please Enable Macros to View BoQ information |