Earth work in ordinary soil including rough dressing and levelling the bed.
2
Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC.
3
C.C.( 1:3:6) using 4Cm size C.B.H.G. metal including cost, carriage,royalty hire chargesof mixture machine & taxes etc. complete(No hand mixing hire chargesof mixture machine & taxes etc. complete(No hand mixing allowed) as per the direction of the Engineer-in-charge.
4
R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering,cost, carriage, royalty & taxes etc. complete as per the direction of EIC.
5
Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete.
6
Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (Foundation & Plinth)
7
6mm thick C:P (1:4) to RCC surface finished smooth including closed deep chipping and slurry.
8
Finishing wall with water proofing cement paint two coats with cost of cement paints.
9
Add for Tranparancy & Taking Photograph ……..… Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.