| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm.diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.Where boats are not necessary. |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag(capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excludingthe cost of any types of filling materials)NB:- Volume of earth/ sand filled bags should not be less than 0.028 Cum/bag |
| 6 | Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. |
| 7 | Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts. |
| 8 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm.and rough dressing etc. complete as per profile. |
| 9 | Extra rate over Item Nos.1.01, 1.02 & 1.03 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. |
| 10 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing themoutside Government land including all leads and lifts to stack in a nearby available space complete. |
| 11 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. |
| 12 | Oiling, cleaning & greasing the regulator gate & gate parts including guide channel, top runner, pedestal block, gear rods, wheel, fish plate etc. with sufficient lubricant as and when necessary as directed by the Engineer-in-charge including cost of all materials to site complete. |
| 13 | Supply of Mazdoor Male / Female |
| 14 | Loading, unloading and stacking by Manual Means.Loading in to trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two points.Steel. |
| 15 | Carriage of Steel materials over pucca road. |
| 16 | Supply of Fitter / Fitter Helper of fitting Driving set, Hosting arrangement Gate shutter in position.Fitter. |
| 17 | Fitter Helper. |
| 18 | Construction temporary khalashi shed ( floor area 2.45M x 2.45M ) with 7.50 cm dia strong bamboo post (6 Nos. 2.70 M long and 3 nos 3.30 M long ) each post being fixed in 60 cm depth holes in the soil. Full bamboo post plates ( 5 nos. 2.70 M long ) slope thatched roof (2 x 2.75 M x 1.50 M ) area of Aman rice straw 10 cm pressed thick including ridges and hips and bamboo splits on frame of half split bamboo ( 2x 13 Nos x 1.50 M ) and 1/4th split bamboo ( 2x 5 Nos. x 2.75 M) single darma mat wall 4 x 2.45 x 2.10 + 2 x 1/2 x 0.60 M with one coat coal tarring with 5% pitch with fitted and fixed of half split bamboo strong with split bamboo placed bothways (15 cm or part ) on both sides and fixed to 1/2 split bamboo fitting & fixing with belts & iron nails etc & made of 1/2 split bamboo ( 6 Nos . 1.25 M & 13 Nos . 2.15 M ) all bamboo fitting in the whole structure be fitted & fixed with nails, coir strings etc. including carriage of all materials to site as per drawing and direction of the Engineer In Charge. Please Enable Macros to View BoQ information |