| 1 | Granular Sub-Base with Coarse Graded Material (Table:- 400-1) :- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (For Grading-II Material) |
| 2 | Granular Sub-Base with Coarse Graded Material (Table:- 400-1) :- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (For Grading-III Material) |
| 3 | Providing and laying in position specified grade of reinforce cement concrete excluding the cost of centering, shuttering and finishing and reinforceent - all work up to plinth level; 1:1.5:3 (1 cement: 1.5 course sand (zone-lll): 3 graded stone aggregate 20 mm nominal size) |
| 4 | Centering and shuttering including strutting, propping etc.and removal of from for Foundations, footings, bases of columns ,etc for mass concrete. |
| 5 | Excavation for structures - Earth work in excavation in foundation of Structures as per drawing & technical specification, including setting out, construction of shoring and bracing, removel of stumps and other deleterius material, dressing of sites and bottom and back filling with approved material - ordinary soil - manual means - depth upto 3.0 M |
| 6 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering, shuttering and finishing and reinforceent - all work up to plinth level; 1:3:6 (1 cement: 3 course sand (zone-lll): 6 graded stone aggregate 40 mm nominal size) |
| 7 | Plain/reinforce cement concrete in open foundation as per drawing and technical specification - RCC grade M20 using batching plant, transit mixer and Concrete pupm. |
| 8 | Plain/reinforce cement concrete in open foundation as per drawing and technical specification - RCC grade M20 using batching plant, transit mixer and Concrete pupm. |
| 9 | Suppliing fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications. (1 % ) |
| 10 | providing and fixing on wall face unplasticised rigid PVC rain water pipe confirming to is:13592 type A, including jointing with sealring conferming to IS:5382,Leaving 10 mm gap for thermal expansion (1)Single Socketed pipes |
| 11 | CARRAIGE OF MATERIAL (a) Cement + Steel |
| 12 | (b) Sand |
| 13 | (c) Stone Chips |
| 14 | (d) Stone Metal |
| 15 | Add 18% GST |
| 16 | Add 1% Labour Cess Please Enable Macros to View BoQ information |