| 1 | Carriage of followings from ESC BSR to pit site on kachcha pakkaa road including loading and unloading chagres at both ends, required completion of work, distance about to 0 to 70 Km. approx. |
| 2 | 11 KV Disc Insulator with Fitting |
| 3 | 11 KV Pin Insulator with Pin |
| 4 | 11 KV V Type Cross ARM 65*65*6mm |
| 5 | ACSR Dog Conductor 1000 MTR |
| 6 | ACSR Weasel Conductor 29538 MTR |
| 7 | Earthing Complete |
| 8 | GI WIRE 6\\" SWG |
| 9 | GI WIRE 8\\" SWG |
| 10 | Gaurding Wire 10 SWG |
| 11 | MS Angle 65X65X6 |
| 12 | LT ABC 3X95+1*70+1*16 sq mm 4980 MTR |
| 13 | LT ABC (1*25+1*16) sq mm 500 MTR |
| 14 | 11 kv 3*185 XLPE CABLE 500 MTR |
| 15 | O/D CABLE JOINTING KIT |
| 16 | CONNETING LEAD 1*16 MM |
| 17 | PCC POLE 11 Mtr Long |
| 18 | PCC POLE 8.5 Mtr Long |
| 19 | Stay Set Complete |
| 20 | STP POLE 13 Mtr Long |
| 21 | Top Channel 125x65mm 11 KV |
| 22 | The following material Erection & Fixing as per RESPO manual andas per direction fo Supervising Engineer. It includes the cost of labour, T&P, Carrier etc. required for proper completion of work. |
| 23 | 11 KV Disc Insulator with Fitting |
| 24 | 11 KV Pin Insulator with Pin |
| 25 | 11 KV V Type Cross ARM 65*65*6mm |
| 26 | ACSR Dog Conductor |
| 27 | ACSR Weasel Conductor |
| 28 | Earthing Complete |
| 29 | GI WIRE 6\\" SWG |
| 30 | GI WIRE 8\\" SWG |
| 31 | Gaurding Wire 10 SWG |
| 32 | MS Angle 65X65X6 |
| 33 | LT ABC 3X95+1*70+1*16 sq mm |
| 34 | LT ABC (1*25+1*16) sq mm |
| 35 | 11 kv 3*185 XLPE CABLE |
| 36 | O/D CABLE JOINTING KIT |
| 37 | CONNETING LEAD 1*16 MM |
| 38 | PCC POLE 11 Mtr Long |
| 39 | PCC POLE 8.5 Mtr Long |
| 40 | Stay Set Complete |
| 41 | STP POLE 13 Mtr Long |
| 42 | SECTIONAL D/P ON PCC POLE 8.5 mtr Long. |
| 43 | DOUBLE POLE STRUCTURE ON 11 MTR PCC POLE |
| 44 | DOUBLE POLE FOR CABLE RISER ON 13 MTR STP |
| 45 | Providing & Fixing of the following material by the Contractor as perUPPCL/RESPO Rules. |
| 46 | Concreting of Pole |
| 47 | Concreting of Stay |
| 48 | Cross Arm Hoding Clamp 11 KV |
| 49 | Danger Board with Clamp |
| 50 | No Plate |
| 51 | PCC CLAMP WITH NUT & BOLT |
| 52 | CROSS BREACING M.S ANGLE |
| 53 | DISTRIBUTION BOX 3 PHASE WITH CLAMP |
| 54 | SUSPENTION CLAMP |
| 55 | DEAD END CLAMP |
| 56 | HDPE PIPE |
| 57 | LAYING OF HDPE PIPE WITH XLPE CABLE BY DIGGING |
| 58 | Nut & Bolt All Size and washar |
| 59 | PEARCING CLAMP |
| 60 | LT PEARCING CONNCTIOR 95 MM |
| 61 | Stone Pad |
| 62 | Aluminium winding Wire |
| 63 | Aluminium Tape |
| 64 | Barbed Wire |
| 65 | F Bracket for 11 KV |
| 66 | PG CLAMP |
| 67 | CLAMP WITH NUT & BOLT |
| 68 | The following material dismantling & carriage from site to ESC BSR including loading and unloading charges at both ends, required completion of work, distance about to 0 to 70 Km. approx. |
| 69 | OLD & USED AB CABLE |
| 70 | Old & used Weasel Conductor |
| 71 | OTHER MS Iron Scrap |
| 72 | 11 kv v type cross arm |
| 73 | ST Pole |
| 74 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |