|
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA Name of Work;- Construction of Rcc Path towards the house of Ajiz ahmed Sher ali & others W.no 2 Baira Panchayat bhorthain North Block Barnoti tender cost 2.94 lac Contract NO:- ST Plan under UT Capex 2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earth work in excavation by manual in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. |
| 3 | Providing and laying in position dry stone aggregate excluding the cost of carriages |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring andshuttering. All work upto plinth level with:1:5:10 mix |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 mix |
| 6 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 mix |
| 7 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thickcompacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. |
| 8 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering,finishing and reinforcement. All works upto plinth level 1:2:4 mix |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1.5:3 stone aggregate 20 mm nominal size) |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 12 | Foundations, footings, bases of columns etc. for mass concrete. |
| 13 | Suspended floors, roofs, landings, balconies and access platforms |
| 14 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 and curing complete |
| 15 | carriage of Sand bajri within average lead of 4 km mt |
| 16 | Add cost of inauguration Plate including fixing along with pedestal all job complete Total in Figures Excess(+) 1.0 Full Conversion INR 294244.75 294244.75 INR Two Lakh Ninety Four Thousand Two Hundred & Forty Four and Paise Seventy Five Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |