| 1 | Earth work in excavation by manual means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:2.9.1 All kinds of soil |
| 2 | Providing and laying of dry soling hand packed includingramming and all carriages/Leads and lifts incl plum |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:4.4.7 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:4.4.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:4.4.5 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level5.22.1 Mild steel and medium tensile steel bars |
| 7 | Back filling behind abutment, wing, wall, return wall, complete as per drawings and MORD technical specification clause 1204.3.8 (Granular material) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.1 Foundations, footings, bases for columns |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.3 Columns, piers, abutments, pillars, posts and struts |
| 10 | Carriage of Sand agg for 12 kms by MT |
| 11 | Provision for Sighnboard and Photographs , other unforseen items , site-Clearance , painting Slogans SBM Logo (as approved by Engineer in-charge) Unforseen items Please Enable Macros to View BoQ information |