| 1 | Engineering, Design, Supply of Material & Accessories. |
| 2 | Danger Plates (Tower Accessories). |
| 3 | Number Plates (Tower Accessories) |
| 4 | Phase Plate (Tower Accessories) |
| 5 | Circuit Plate (Tower Accessories) |
| 6 | Anti Climbing Devices (Tower Accessories) |
| 7 | Bird Guard (Tower Accessories) |
| 8 | Earthing Material (Tower Accessories) |
| 9 | Nuts & Bolts with Washers (Tower Accessories) |
| 10 | B+0 (Non Snow Zone) (Tower Material) |
| 11 | C+0 (Non Snow Zone) (Tower Material) |
| 12 | D+0 (Non Snow Zone) (Tower Material) |
| 13 | D+6 (Non Snow Zone) (Tower Material) |
| 14 | D+9 (Non Snow Zone) (Tower Material) |
| 15 | D+25 (Non Snow Zone) (Tower Material) |
| 16 | ACSR Zebra Conductor |
| 17 | Mid Span Joints for Conductor |
| 18 | Vibration Damper for Conductor |
| 19 | Repair Sleeve for Conductor |
| 20 | Aluminium Tape |
| 21 | OPGW Dual window single mode with mode field diametyer 8.6-9.5um,cladding diameter 125 um + 1um, 1.5% wastage included. |
| 22 | Joint Box for OPGW |
| 23 | Vibration Dampers for OPGW. |
| 24 | Tension assembly pass through |
| 25 | Tension assembly dead end |
| 26 | 120 KN Porcelain disc insulators (220KV). |
| 27 | 70 KN Porcelain disc insulators. |
| 28 | Single Tension fitting (Insulator Fitting). |
| 29 | Double Tension Fitting (Insulator Fitting). |
| 30 | Double Suspension Fitting (Insulator Fitting). |
| 31 | Tag Welding Of Tower. |
| 32 | Downlead Clamps |
| 33 | Aircraft warning sphere span Marker 600 mm dia color white/red/orange |
| 34 | Solar Powered LED Lighting System for obstruction Marking of One no. medium intensity and Two no. Low intensity Lights complete with interconnecting cables mounting accessories etc. |
| 35 | Laying Of Tower Foundations include all activities relating to completion of foundation e.g. Stub Setting, Erection of Earthing Device, Reinforcement, Concreting, Excavation, Shoring, Shuttering, Dewatering , Backfilling etc.for various types of towers including benching in Hilly Terrain. |
| 36 | B Type Tower Foundation(PS). |
| 37 | C Type Tower Foundation(PS). |
| 38 | D Type Tower Foundation(PS). |
| 39 | D+25 Type Tower Foundation(PS). |
| 40 | Erection of Tower Super Structures including complete with N&B including loading/unloading/carriage. |
| 41 | B/C Type Towers along with N&B. |
| 42 | D Type Towers along with N&B. |
| 43 | D+25 Type Towers along with N&B. |
| 44 | Erection of Aircraft warning sphere span Marker 600 mm dia color white/red/orange |
| 45 | Erection of Solar Powered LED Lighting System for obstruction Marking of One no. medium intensity and Two no. Low intensity Lights complete with interconnecting cables mounting accessories etc. |
| 46 | Painting of Towers upper two storeys |
| 47 | Stringing of Transmission Line along with OPGW/Earthwire. |
| 48 | Installation of insulator strings complete with necessary hardware,Laying & Stringing of ACSR Zebra conductor including fixing of conductor accessories & temporary anchoring of Towers.Also laying & Stringing of Opgw/earthwire including fixing of earthwire accessories for the line. |
| 49 | Protection Works of Tower Foundations. |
| 50 | Protection work of Tower footing in R.R.Masonary (1:6). Including excavation of earth, benching, PCC 1:4:8, Coping in 1:2:4, backfiling, stone filing etc. (Complete Job in all aspects) |
| 51 | Providing and Laying of flexible wire crates including all supply , carriages and lifts. (Complete Job in all aspects) |
| 52 | Dismentling of Tower Super structures. |
| 53 | Dismentling of existing Tower Loc. Nos. 19, 20, 21, 22, 23, 24, 25, 26, 27, 28 including leg extensions if any complete with N&B & accessories. |
| 54 | Transportation of Dismantled Tower Material from site of work to divisional store (including loading, carriage, unloading and stacking). |
| 55 | Dismantling of Existing Transmission Line. |
| 56 | Dismentling of insulator strings of ACSR Zebra Conductor including conductor accessories,earthwire accessories for the line. |
| 57 | Transportation of Dismantled Zebra Conductor including conductor accessories, earthwire accessories etc. from site of work to divisional store (including loading, carriage, unloading and stacking). |
| 58 | Preliminary works. |
| 59 | Preliminary works including check survey,Geological investigation/soil investigation, drawings of foundations, Tower profiles/drawings & other allied items). |
| 60 | Engineering and Designing of the Lattice structure of the Towers, Tower foundations, testing and vetting by CPRI Bangalore/any other Govt. recognised agency(Type B,C & D with all extensions). Please Enable Macros to View BoQ information |