| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA Name of Work;- construction of Culvert & Lane from GHS Thein to Mohd Aslam Mohalla ,Panchayat Thein ,Block Keerian Gandyal, District Kathua under ST (UT Capex) Plan 2026-27 Tender cost 7.00 lac Contract NO:- ST plan under UT Capex 2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earth work in bulk excavation by Mechanical (Hydrulic excavator) over areas ( exceeding 30 m in depth,1.5 m in width as wel as 10sqm on plan), including disposal of Excavate earth upto 50.0m and 1.5m ,as directed by Engineer in Charge.(Soil Clasification 70% ordinary rock and 30% Hard rock) |
| 3 | 30% Hard Rock |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement :5 coarse sand : 10 graded stone aggregate 40 mm nominal size) . |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and supplying of 30% Boulders |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works above plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 9 | Centering and shuttering including strutting, propping etc. |
| 10 | Suspended Floor |
| 11 | Edges of Slab |
| 12 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 13 | Carriages of Sand for an Av. Lead of 25.0 km |
| 14 | Carriages of Agg (20mm+40mm) for an av lead of 25.0km |
| 15 | Add Provision for Inagugration Stone/CIB Total in Figures Excess(+) 1.0 Full Conversion INR 700997.54 700997.54 INR Seven Lakh Nine Hundred & Ninety Seven and Paise Fifty Four Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |