| 1 | Supply of T Clamp connector for Moose to Moose conductor, as per IS specifications and standards |
| 2 | Labour charges for paying out of 3 Nos. Twin moose conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including sorting out of conductor according to drum schedule and loading and unloading at site, cost of T&P lead and lift etc., complete. Under Non LC Condition |
| 3 | Labour charges for rough sagging, tensioning, clipping, jumpeing for 3 nos. twin moose conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including providing trussels cost of T&P lead and lift etc., complete. |
| 4 | Labour charges for removing of loop jumpering and re strining of loop jumpering including cost of loading and unloading, transporting, etc complete |
| 5 | Labour charges for 400 KV side gantry dropper using Twin Moose conductor work including cost of loading and unloading, transporting, etc complete(Under LC Condition) |
| 6 | cleaning juliflora jungle with uprooting |
| 7 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. |
| 8 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. |
| 9 | PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. |
| 10 | Providing RCC 1:1.5:3 using 20 mm HBG metal for foundation without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects |
| 11 | Providing PCC 1:2:4 using 20 mm HBG metal for foundation without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects |
| 12 | P.C.C 1:2:4 using 20mm HBG metal for foundation with formwork including cost of all materials lead, Lift, labour, for laying concrete curing etc., complete |
| 13 | Providing RCC 1:1.5:3 using 20 mm HBG metal for foundation with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects above GL |
| 14 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete . |
| 15 | Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete. |
| 16 | Suplying, fabricating and fixing in position of MS angle fence post with MS angle with making necessary groovs in that to fix the barbed wire fencing including cost of all materials, all labour,lead, lift, etc. and cost of red-oxide primer and two coats of approved enamel paint etc., complete as directed by the engineer at site. |
| 17 | Supplying and tying chain link size 50mm Sq. 3.15 m ht PVC coated including cost of all materials, labour, lead, lift etc.complete. |
| 18 | Providing Barbed wire fencing 10 Gauge - Two ply four pronged (Galvanised) over the compound wall in three rows with Y angles at regular intervals including cost of barbed wire, labour, lead, lift, etc., complete but excluding the cost of M.S.Angles. |
| 19 | Painting New Iron works with two coats synthetic enamal paint over one coat of primer including coas of all material lead lift |
| 20 | GST for bidders within TamilNadu |
| 21 | GST for bidders outside TamilNadu (IGST) Please Enable Macros to View BoQ information |