| 1 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 2 | Fitting one Additional2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 3 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 5 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 6 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 7 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 8 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 9 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 10 | Stringing one km LT Addl conductor (Rabbit) after relocating one of the existing conductor, incl. fitting insulators, removing touchings and conveyance of materials. |
| 11 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 12 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 13 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 14 | Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil. |
| 15 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 16 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. |
| 17 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 18 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 19 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 20 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 21 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 22 | Fitting and providing one HT Fly stay for 11kV pole using A type pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 23 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 24 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 25 | Dismantling one 1x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 26 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 27 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 28 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 29 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 30 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 31 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | Redoing single phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire, Fuse unit etc., changing Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at various location. |
| 33 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 34 | Stringing of 11KV, 99sqmm, XLPE covered conductor including fitting of all accessories, providing end terminations, midspan joints, pipe earthing, installing insulated piercing connectors etc. |
| 35 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 36 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. Please Enable Macros to View BoQ information |