|
| 1 | Name Of Work:-Providing Water Supply Scheme and Solar Panel For Anganwadi's at Bhosare |
| 2 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) (Bd-A1/259) |
| 3 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) |
| 4 | Item No. 3 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) |
| 5 | Item No. 4 :- Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no.4985/1988 including all local and central taxes, transportation, freight charges, octroi, inspection charges, loading, unloading, conveyance to the departmental stores and including cost of jointing material i.e. solvent cement, etc. complete. UPVC 25 mm dia |
| 6 | Item No. 5 :- Lowering, laying and jointing PVC pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, giving satisfactory hydraulic testing as per IS code, etc. complete. UPVC 25 mm dia |
| 7 | Item No.6 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 8 | Subwork:- Ro plant 'Item No.1:-Suppying and Fixing HDPE Water tank for Drinking Water Pupose …etc complete |
| 9 | 50 Litre Capacity tank |
| 10 | Item No.2:-Providing and Fixing Light Fitting |
| 11 | Item No.3:-Providing And Suppying Fixing Accessories plumbing material for R.O plants …etc complete |
| 12 | Item No.4:-Providing and Fixing Ro plant 16 Litre per requirement as directed…etc complete |
| 13 | Add 18% GST Please Enable Macros to View BoQ information |