| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Balrampur to the work site/dump site (Distance up to 50 km) |
| 2 | PCC Poles (11 mtr long) |
| 3 | PCC Poles (8.5 mtr long) |
| 4 | ACSR Rabbit Conductor |
| 5 | Other line materials |
| 6 | Erection of single PCC Poles (11 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site |
| 7 | Erection of sectional double pole PCC Poles (11 Mtr Long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 8 | Erection of sectional Four Pole structure for PCC Poles (8.5 Mtr Long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 9 | Erection of single PCC Poles (8.5 Mtr Long) for 11 KV/L.T. line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site |
| 10 | Erection of sectional double pole PCC Poles (8.5 Mtr Long) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 11 | Earthing of pole as per RESSPO U.P.P.C.L. . |
| 12 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 13 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely.All required materials provided by the contractor at his own cost. |
| 14 | Laying, stringing, sagging & binding of ACSR Rabbit Conductor of 11 KV in 3 phase, 3 wire line with jumpering (where as required) |
| 15 | Cutting of tree branches for cleaning route of 11 KV/LT line at the work site |
| 16 | Guarding of 11 KV line. |
| 17 | Dismentaling of OLD Line |
| 18 | Erection of OLD Conductor on New 11 KV Double Circuit Line |
| 19 | Dragging and Erection of 11 KV 11M POLES |
| 20 | Punching Hole in cross arm, top channel, Guarding channel, T OFF |
| 21 | Received Back of line material from work site to ESC- Balrampur |
| 22 | Decentralized materials:-Providing and fixing of following materials as per sanctioned Estimate/Package as per RESSPO U.P.P.C.L. drawing/ norms.(where is required). |
| 23 | F-Bracket |
| 24 | F-Bracket |
| 25 | Holding clamps with Nut & Bolt. |
| 26 | Earth wire clamp with Nut & Bolt. |
| 27 | Cross arm Holding clamp. |
| 28 | Jointing Sleave for ACSR Rabbit conductor. Please Enable Macros to View BoQ information |