| 1 | Dismantling R.C. floor, roof, beams etc.including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. a) In Ground floor including roof. |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In Ground floor. |
| 3 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.i) In Grond floor |
| 4 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, bindees etc.including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m a) Tor steel/Mild Steel i) SAIL / TATA / RINL. i) In Ground floor |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmbnominal size) excluding shuttering and reinforcement if any, in ground floorbas per relevant IS codes. i) In Ground floor |
| 6 | Brick work with 1st class bricks in cement mortar (1:4) b) In superstructure, In Ground floor |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) i) In Ground floor |
| 8 | Labour for Chipping of concrete surface before taking up Plastering work. |
| 9 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (1st floor).[Excluding cost of chipping over concrete surface] i) With 1:4 cement mortar b) 20 mm thick plaster |
| 11 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.NOTE : Cement 0.152 cu.m. per 100 sq.m. |
| 12 | Cutting holes and subsequent mending gooddamages.(a) Diameter upto 150 mm.(i) In brick work [Cement-4.0 Kg/Mtr] |
| 13 | M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. (length of straight not less than 230 mm) |
| 14 | M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr |
| 15 | Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials. |
| 16 | Welding in M.S. structural work with gas or electric: a) Tack weld |
| 17 | Supplying, fitting galvanised 3 ply 12 gauge / 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanisedstaples,straining bolt and binding wire where necessary. |
| 18 | Supplying fitting and fixing 600 mm ( ±30 mm) diametre R.B.T (Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx.6 meters length at site clipped with two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means of security fasteners (such as 'C' clips, R.B.T clips etc.) |
| 19 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 20 | Priming one coat on timber or plastered surface with synthetic oil sand papering etc. |
| 21 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white) |
| 22 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white) |
| 23 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 24 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming of the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 25 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation. |
| 26 | Locking arrangement for Jail type doors including supplying fitting and fixing in position complete as per approved design. |
| 27 | Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. |
| 28 | (b) Medium size plant of girth of exposed stem above 75 mm. but not exceeding 150 mm. lift upto 6 mtr. |
| 29 | c) Large plant of girth of exposed stem above 150 mm. but not exceeding 225 mm. lift upto 6 mtr. |
| 30 | Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 27.03 |
| 31 | Add GST @ 18% on Total amount over item No. 1 to 28 Please Enable Macros to View BoQ information |