|
| 1 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed: Ordinary rock |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). |
| 3 | Chemical treatment of sand stone to clean from yellowness, blackness, algal growth, dust, dirt oily accretions, lime & gypsum deposits, filling of cracks/ joining of gaps/ pointing, strengthening of weak stone, removal of salt effect and application of preservative coating to prevent algal growth and make the stone water proof. |
| 4 | P & L Lime Surkhi Plaster lime surkhi mortar 1:2 (1 Lime : 2 Surkhi) including preparation of mortar by traditional practice (by grinding) in specified course for base coarse and subsequent course & Loi, tamping, beating, curing till the shrinkage cracks are disappear. The work is to be done with all lead as the work is of restoration nature as per Jaipur practice including adding gur, methi & gugal on old walls including removal of all old loose and decade plaster, each coat to be done after 3 days of previous coat.45 mm thick in four coats |
| 5 | Add extra over item no. 40.5 to 40.6 for Lime plaster work done over Spherical or groin ceiling/ladao ceiling of domes. |
| 6 | Flush and ruled pointing over joints of dressed stone cladding, chajjas, jali etc. including racking the joints as per traditional practice including all leads and lifts with grinded mortar of lime putty and fine sand mixed in 1:2 ratio and gur, methi, gugal etc. are to be mixed as per traditional practice |
| 7 | Providing & applying Lime kara 1:2 (1lime cream : 2 Zikki powder) grinding mortar with grinding mill/manually on lime base, on ceiling and all flat surface in two coats. First coat applying 3 mm to 4 mm thick and curing properly at least 7 days, second finishing coat done after 7 days of previous coat as per traditional practice.(thickness not more than 6 mm.) |
| 8 | Add extra for Lime Kara work (on lime plaster base) other than flat surface as per traditional practice with all lead & lift with fine finishing complete in all respect on :Domical surface/spherical/domical ceiling. |
| 9 | Providing and laying lime Dhar on roofing as per Rajasthan, Jaipur traditional practice with lime, Surkhi, old lime powder, brick aggregate 12 to 20mm (1:2:2:2) and using Methi, Gur, Hemp, Belgiri etc. including beating and temping 100 to 150 mm thick as per specifications. Including dismantling of old deteriorated roofing |
| 10 | Stucco work in lime, Surkhi, mortar (1:2) as per existing design work/ traditional practices by skilled craftsman, the stucco work should be done as per restoration nature, the mortar should be prepared by grinding mill adding gur, methi & gugal.. The thickness varies from 50 mm to 100mm as per the design (minimum rectangular surface area to be measured). |
| 11 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40mm dia. M.S. tube 1.5 m centre to centre horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. (To be used for maintenance work judicially . necessary deduction for scaffolding in the existing item to be done.) |
| 12 | Flooring with Cobble stone of approx. Size 125x125x75 mm (thick) laid on 25 mm average thick cement mortar 1:3 ( 1 cement : 3 Coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the stone, laid in approved pattern complete in all respect as per direction of Engineer-in-charge. |
| 13 | Silt and Sludge clearance of the entire Kund with sewage pumps or with labour/sweepers etc. to clean all the water sources below and on the sides of the Kund complete and disposal of the sludge including all leads and lift to some remote dumping ground, location of such dumping ground will be the responsibility of the Contractor and he had to comply with all statutory requirements. |
| 14 | Providing & fixing \\"Ornamental stone cladding\\" of approved sand stone with dressing complete as per existing design/pattern/approved design,fixing with 30mm thickgrinded lime surkhi mortar 1:2 & pointing with white cement with araldite and pigment to match shade the stone complete in all respect as per direction of Engineer incharge.(75mm thick) |
| 15 | Sandstone Column/Arch/Lintal: Providing new decorative sandstone columns /arches/lintals per the original details found on site. The damaged portions of the original columns /arches/lintals/Elements to be carefully dismantled without damaging the adjacent areas, & replacing the same with new detail of the same size & design. Sample of the terra cotta columns /arches/lintals to be shown to the Engineer in charge for approvals before procuring & fixing the same on site. Item to include all necessary anchoring details, scaffolding if required etc. complete. Mode of Measurement: Item to be paid each new column.for using plain |
| 16 | Providing and fixing of fine dressed stone \\"Steps\\" (solid) of temple with matching stone/ approved quarry fixing of steps as per temple architecture by machanical/ mannual system carefully in proper order and sequence including all lead & lift as per direction of Engineer incharge. |
| 17 | Providing & applying Lime kara 1:2 (1lime cream : 2 Zikki powder) grinding mortar with grinding mill/manually (on lime surkhi/sand plaster base) on decorative/ornamental lime plaster in two coats.First coat applying 3mm to 4mm thick and curing properly at least 7 days,second finishing coat done after 7days of previous coat as per traditional practice.(thickness not more than 6 mm.) |
| 18 | Providing and Fixing fine dressed sand stone /approved stone \\"Kamanidar Chajja\\" for chattries and jharokas with fine dressed surface both sides and front edges should be round shape/moulding, fixing of chajja in semicircular shape in elevation in grinded lime surkhi mortar 1:2 joint flush with proper adhesive with pigment to match the shade of stone (thickness of chajja on front edge 50mm and 100mm on fixing end) exposed surface is to be measured only. |
| 19 | Providing and fixing fine dressed sand stone \\"Dasa/coping\\" as per existing matching , fixing in grinded lime surkhi mortar 1:2 including pointing in cream and stone powder 1:1 with an admixture of pigment to match the shade of stone complete in all respect.above 100mm to 150mm thick plain with fine dressing. |
| 20 | Above 100mm to 150mm thick with pan patti design. |
| 21 | Above 75mm to 150mm thick with gola. |
| 22 | Providing and fixing \\"Stone Kalasha\\" as per existing matching on doms od chattries/jharokhas as per existing design & dimensions as per traditional practices, fixing of kalash carefully without damaging the doms complete in all respect. Marble Kalasha |
| 23 | Kalasha height.(exposed part) 45cm. to 60cm. |
| 24 | Kalasha height.(exposed part) 90cm. to 100cm. |
| 25 | Providing and fixing of fine dressed \\"Ashlar stone work\\" (Plain work) of temple by machenical/manual system carefully with proper order and sequence, fixing with grinded lime surkhi/ sand mortar 1:2 and joints flush with lime cream and stone dust 1:1 including all scaffolding and shuttering work, the place as directed by Engineer incharge. |
| 26 | Site clearance by uprooting of trunk vegetation, bush, wood, trees and sapplings of girth upto 15cms and disposal of rubbish with in 50mtr. Including leveling and dressing of ground as per direction of Engineer incharge. |
| 27 | Providing & fixing ashlar \\"Rain water Spouts\\" (3) lines dressed as per traditional practice / existing design / approved design size 60 x 30 x 25 cm, fixing the rain water spout with lime surkhi mortar 1:2, with proper slope complete in all respect. Please Enable Macros to View BoQ information |