|
| 1 | ROAD CONCRETE |
| 2 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth |
| 3 | OD432433/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete leveling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labor charges etc. complete as per direction of Departmental officers at site. |
| 4 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 |
| 5 | OD432496/2025-2026:Surface Dressing on the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish,lead up to 50m and lift up to 1.5m. |
| 6 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 7 | OD432435/2025-2026:od 1226576/2021-2022 : Filling with Quarry muck Filling up low lying and water logged areas with local materials /quarry muck,spreading in layers ,levelling the top at site and consolidation by ramming ,etc complete for improving the CBR value of sub grade |
| 8 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 9 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification(i) Nominal mix (1:2:4) |
| 10 | OD432499/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layers notexceeding 20 cm in depth, consolidating each deposited layer by ramming andwatering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-incharge. |
| 11 | OD439412/2025-2026:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:300 mm dia R.C.C. pipe |
| 12 | OD432495/2025-2026:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:450 mm dia R.C.C. pipe |
| 13 | OD432434/2025-2026:Providing and fixing name board of size600mm x450mm using MS sheet 2mm thick,GI pipe 50mm fixing to ground using concrete M15of size 300x300x450mm Please Enable Macros to View BoQ information |