| 1 | DISMANTLING: Dismantling of all damage fire bricks from thefurnace chamber such As 9 nos Roast Bricks. Ash collection bricks(M.K-16 to M.K-24) 9 Sets angle or shaped bricks M.K-88-18 nos.M.K-100-4nos., M.K-101-4 nos refractory / side bricks M.K-27-18nos.M.K-29-18 nos through clearing of as collection chamber, air ducts byremoving the ash inside the furnished chamber for patch repairingpurpose. |
| 2 | REMOVING OF STACK: Removing the broken bricks & all rubbishesto outside crematory/ dumping ground incl. loading, unloading,stacking & cost for transportation during patch repairing purpose |
| 3 | PATCH WORK (RELINING): Relining the refractory shaped bricks,tiles, Angles bricks etc with good quality fire clay mortar by skilledlabor (specially for cremation furnace) neat finishing and fitting foreasy movement of the charging trolley over the roast bricks as per thedirection of E.I.C of the dept. washing of the of the entire chamberwith Sodium Siliminate clay should be necessary.Roast bricks-9 nos,Ash bricks-(M.K-24)-9nos Angle bricks-M.K-88-18nos, M.K-100-4nos, M.K-101-4 nos.Side bricks-M.K-27-18nos, M.K-29nos. |
| 4 | PATCH WORK WITH BRICKS: Roast bricks |
| 5 | PATCH WORK WITH BRICKS: Ash bricks (M.K.-16 to M.K.-24) |
| 6 | PATCH WORK WITH BRICKS:Angle bricks M.K-88 |
| 7 | PATCH WORK WITH BRICKS: Angle bricks M.K...101-4nos |
| 8 | PATCH WORK WITH BRICKS: Angle bricks M.K-100-4nos |
| 9 | PATCH WORK WITH BRICKS: Side bricks M.K-27 |
| 10 | PATCH WORK WITH BRICKS: Side bricks M.K-29 |
| 11 | PATCH WORK WITH BRICKS: Good quality fire clay mortar Washingof the entire chamber with Sodium Siliminate clay should benecessary |
| 12 | ALTER (WITH BRICKS M.K.92): Construction of Alter in front offurnace chamber flash to furnace door inside with M.K ...92 fire brickswith good quality fire clay mortar |
| 13 | CLEANING AND REPAIRING OF FUEL DUCT PASSAGE:Removing the complete damaged R.S bricks and R.S slab of the(U.G) duct passage of the furnace chamber and thorough cleaning ofthe duct passage upto the start of brick build chimney by removingash/carbon particles and relining the same with R.S Slabs & R.Sbricks after mending good damages in the duct passages withinsulation brick and red brick (1:4) with all necessary cementingmasonry work |
| 14 | HEATING ELEMENT: Supply and fixing the Heating element (Heatcomake) of capacity 4.5 K.W to be working in supply voltage of 240 V50 Hz made from 80/20 Nicrome wire of 8 SWG in coiled coil fromwelded S.S stud on both ends. The coil should be inserted into thegroove of existing coil brick after proper cleaning and the S.S Studshoused into the ceramic caller tube wrapped. With asbestos rope fortight fitting and sealing as heat proof extended S.S stud to beconnected brass/ copper connector with complete connection in allrespect of existing system. |
| 15 | HEATING ELEMENT: Supplying and fixing the terminal connectorhaving drill holes for inserting S.S stud of 8.5 mm dia and connectionpoint of existing copper wires of overall dimension 80mm long x25mmsquare shape. |
| 16 | TEMPERATURE CONTROLLER: a) Supply and fixing the digital typetemperature controller of range (0-1200) deg. C of overall dimension92 sq mm dia x 105mm depth having (CR-A1) heat sensor and 1 no +1 N.C change over contact to be actuated at crossed of desiredtemperature in deg.C complete power supply unit of 230V 50 Hz.Blue Max make |
| 17 | THERMOCOUPLE: a) Supply and fixing the thermocouple of heatsensing range 0-1200 deg. C having (Cr-A1) sensor house in S. Sd304 casing of dimension 1200 mm long x 22 mm OD completeencased in to it and fitted terminal on other end for connection ofcompensating wire. Heatco make |
| 18 | COMPENSATING WIRE: Supply, laying drawing of 2 core 0.5 sq mmCR-A1 compensating wire for heat sensing from thermocouple totemperature controller covered with asbestos embedded tape (FlameIndia make |
| 19 | FRONT COVER OF FURNACE DOOR: Supplying and fixing the newcover made of from 3.15 mm (10 SWG) CRCA sheet over alldimension 2400 mm X 1200mm with top arched shape as per existingdrill holes for fixing over the furnace door in two halves. R.H Side |
| 20 | FRONT COVER OF FURNACE DOOR: Supplying and fixing the newcover made of from 3.15 mm (10 SWG) CRCA sheet over alldimension 2400 mm X 1200mm with top arched shape as per existingdrill holes for fixing over the furnace door in two halves. L.H Side |
| 21 | BACK COVER OF FURNACE DOOR: Supplying and fixing the newcover made of from 3.15 mm (10 SWG) CRCA sheet over alldimension 2400 mm X 1200mm with top arched shape as per existingdrill holes for fixing over the furnace door in two halves. R.H Side |
| 22 | BACK COVER OF FURNACE DOOR: Supplying and fixing the newcover made of from 3.15 mm (10 SWG) CRCA sheet over alldimension 2400 mm X 1200mm with top arched shape as per existingdrill holes for fixing over the furnace door in two halves. L.H Side |
| 23 | BLANKET FOR FURNACE DOOR : Construction of door blanket with 2 layers of ceramic blanket of density 96kg/cm... with 2 layers of ceramic blaket of density 128 kg/cm... and to be fitted in the spikes with S.S.pin so as the blanket does not came out. |
| 24 | Supplying of 1.1 KV. Grade PVC insulated Conductor of followingcables (make: Polycab/ Gloster/Havells/):Size in Sq. mm, No & dia.of wire in mm , No of Core - 70 19/2.24 3… |
| 25 | Sub Total |
| 26 | GST 18% |
| 27 | CESS 1% Please Enable Macros to View BoQ information |