| 1 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DSR 16.82 |
| 2 | Taking out existing channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 3 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge DSR 16.83 |
| 4 | Laying old PCC Kerb in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished kerb edging shall be measured for payment. |
| 5 | Laying old Channel in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished Channel edging shall be measured for payment. |
| 6 | Providing and fixing PCC kerbs of size 2’-0” x0'-9” having 4” thickness at bottom and 3” thickness at top and made of plain cement concrete 1:2:4 duly vibrated and compacted. The rates also includes fixing in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished kerb edging shall be measured for payment. |
| 7 | Providing and fixing PCC Channel of size 2'-0\\" x 1'-0\\" x 3\\" thick duly mixed, mechanically & compacted made of PCC 1:2:4 duly cured and finished. The rates also includes fixing in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished Channel edging shall be measured for payment. |
| 8 | Carriage of material (1.1) by mechanical transport including loading unloading and stacking complete in all respect using appropriate labour and machinery to carry dispose the building rubbish/ malba/ dismantled and wastes to the Municipal Corporation C&D waste processing plant to an average lead of 12 Km and all lifts to entire satisfaction of Engineer in Charge. |
| 9 | Preparation of sub grade including trenching rough dressing of soil, final dressing of earth to give level and camber, watering, rolling with a road roller and compaction of bed complete in all respect to the entire satisfaction of Engineer in Charge. |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) DSR 4.1.10 |
| 11 | Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and laid in required colour and pattern over 20mm thick compacted bed of sand including grouting the joints with cement mortar etc. all complete as per the direction of Engineer-in-charge. |
| 12 | Providing and fixing 100 x 100 x (50-75) mm thick machine cut cobble stone block of approved colour & shade and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1 cement : 4 coarse sand) with joints 10mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in-charge. |
| 13 | Providing and fixing Precasting plain cement concrete tiles of size 2'-0\\" x 1'-0\\" x 3\\" thick duly mixed, mechanically & compacted made of PCC 1:1.5:3 duly cured and finished. The rates is to be fixed over 20mm thick cement sand mortar 1:4 including grouting of joints complete in all respect to the entire satisfaction of Engineer -in-charge |
| 14 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement: Concrete of M20 grade with minimum cement content of 270 kg /cum. DSR 4.20.1.3 |
| 15 | Applying stamping finish to the top surface of freshly laid plain/reinforced cement concrete of specified grade in porticos, sidewalks, driveways, pool decks and open yards as per direction of the Engineer-in-Charge. The process shall include thefollowing:-• The concrete shall be placed and screeded to the finished grade, and floated to a uniform surface by using standard finishing techniques. The approved color hardener @ 2.7 kg/sqm shall be applied evenly to the surface of the fresh concrete by the dry shake method by sprinkling in two or more shakes, floated after each shake and trowelled only after the final floating. The approved release agent @ 0.113 kg/sqm shall be applied evenly to the trowelled surface before stamping or the said release agent can be applied to the flexible polyurethane stamp moulds of approved design and in required sizes to achieve final stamped pattern. These stampings shall be placed on the surface of concrete in three to four pieces at a time and tapped gently with rammers of sufficient size & weight to leave proper stamp marks and the process repeated for the remaining concrete surface till the whole surface to be stamped is completed within the time while concrete is in plastic stage of setting.• After stamping, the curing shall be done as per manufactures specifications. After initial curing the imprinted joints shall be grouted using cement slurry mixed with color hardener as per the requirement. The surface shall be sealed by applying acrylic based sealer not less than 0.167 litre/sqm.on finished surface.• The construction joints shall be provided by groove cutting of size 4mm x 20mm in panel size 3m x 3 m or lesser as per the site conditions and filling the same with 10 mm baker rod and providing and laying (PU) Polyurethane based joint sealer of approved make as per manufacturer’s specifications and finished by applying Polyurethane resin based top protective clear coat of minimum 80 micron applied with rollers on properly cured and dry clean surface. (Cost of concrete for flooring is not included in this item which shall be paid separately.)DSR 26.83 Please Enable Macros to View BoQ information |